nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A new hybrid method for fault tree analysis
|
Contini, S. |
|
1995 |
49 |
1 |
p. 13-21 9 p. |
artikel |
2 |
An inhomogenous state graph model and application for a phased mission and tolerable downtime problem
|
Becker, G. |
|
1995 |
49 |
1 |
p. 51-57 7 p. |
artikel |
3 |
Approaching system evolution in dynamic PSA by neural networks
|
Marseguerra, M. |
|
1995 |
49 |
1 |
p. 91-99 9 p. |
artikel |
4 |
Calendar
|
|
|
1995 |
49 |
1 |
p. 101- 1 p. |
artikel |
5 |
Editorial Board
|
|
|
1995 |
49 |
1 |
p. IFC- 1 p. |
artikel |
6 |
Marked point process framework for living probabilistic safety assessment and risk follow-up
|
Arjas, Elja |
|
1995 |
49 |
1 |
p. 59-73 15 p. |
artikel |
7 |
Optimization of test and maintenance intervals based on risk and cost
|
Vaurio, J.K. |
|
1995 |
49 |
1 |
p. 23-36 14 p. |
artikel |
8 |
Risk measures in practical use: risk reduction has its price, but is it known?
|
Reinertsen, Rune |
|
1995 |
49 |
1 |
p. 47-50 4 p. |
artikel |
9 |
Shelf-life estimation of gun propellant stockpile
|
Sohn, So Young |
|
1995 |
49 |
1 |
p. 37-46 10 p. |
artikel |
10 |
Suggestions for an improved HRA method for use in Probabilistic Safety Assessment
|
Parry, Gareth W. |
|
1995 |
49 |
1 |
p. 1-12 12 p. |
artikel |
11 |
The ARIPAR project: analysis of the major accident risks connected with industrial and transportation activities in the Ravenna area
|
Egidi, Demetrio |
|
1995 |
49 |
1 |
p. 75-89 15 p. |
artikel |