nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A drawback and an improvement of the classical Weibull probability plot
|
Jiang, R. |
|
2014 |
126 |
C |
p. 135-142 8 p. |
artikel |
2 |
A novel decision diagrams extension method
|
Li, Shumin |
|
2014 |
126 |
C |
p. 107-115 9 p. |
artikel |
3 |
A reliability-based approach to optimize preventive maintenance scheduling for coherent systems
|
Doostparast, Mohammad |
|
2014 |
126 |
C |
p. 98-106 9 p. |
artikel |
4 |
A response surface method for stochastic dynamic analysis
|
Alibrandi, Umberto |
|
2014 |
126 |
C |
p. 44-53 10 p. |
artikel |
5 |
Evaluation of risk impact of changes to surveillance requirements addressing model and parameter uncertainties
|
Martorell, S. |
|
2014 |
126 |
C |
p. 153-165 13 p. |
artikel |
6 |
Gamma lifetimes and one-shot device testing analysis
|
Balakrishnan, N. |
|
2014 |
126 |
C |
p. 54-64 11 p. |
artikel |
7 |
Global Sensitivity Analysis for multivariate output using Polynomial Chaos Expansion
|
Garcia-Cabrejo, Oscar |
|
2014 |
126 |
C |
p. 25-36 12 p. |
artikel |
8 |
Importance analysis for reconfigurable systems
|
Si, Shubin |
|
2014 |
126 |
C |
p. 72-80 9 p. |
artikel |
9 |
Inside Front Cover/Editorial Board
|
|
|
2014 |
126 |
C |
p. IFC- 1 p. |
artikel |
10 |
Nonparametric predictive inference for combined competing risks data
|
Coolen-Maturi, Tahani |
|
2014 |
126 |
C |
p. 87-97 11 p. |
artikel |
11 |
On the application of near accident data to risk analysis of major accidents
|
Khakzad, Nima |
|
2014 |
126 |
C |
p. 116-125 10 p. |
artikel |
12 |
On the meaning of the special-cause variation concept used in the quality discourse – And its link to unforeseen and surprising events in risk management
|
Aven, Terje |
|
2014 |
126 |
C |
p. 81-86 6 p. |
artikel |
13 |
Optimal staggered testing strategies for heterogeneously redundant safety systems
|
Liu, Yiliu |
|
2014 |
126 |
C |
p. 65-71 7 p. |
artikel |
14 |
Piecewise Deterministic Markov Processes based approach applied to an offshore oil production system
|
Zhang, Huilong |
|
2014 |
126 |
C |
p. 126-134 9 p. |
artikel |
15 |
Precision of power-law NHPP estimates for multiple systems with known failure rate scaling
|
Van Dyck, Jozef |
|
2014 |
126 |
C |
p. 143-152 10 p. |
artikel |
16 |
Testing effort dependent software reliability model for imperfect debugging process considering both detection and correction
|
Peng, R. |
|
2014 |
126 |
C |
p. 37-43 7 p. |
artikel |
17 |
Uncertainty quantification of an Aviation Environmental Toolsuite
|
Allaire, Douglas |
|
2014 |
126 |
C |
p. 14-24 11 p. |
artikel |
18 |
Warranty forecasting from incomplete two-dimensional warranty data
|
Gupta, Sanjib Kumar |
|
2014 |
126 |
C |
p. 1-13 13 p. |
artikel |