nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A competing risk model for the reliability of cylinder liners in marine Diesel engines
|
Bocchetti, D. |
|
2009 |
|
8 |
p. 1299-1307 9 p. |
artikel |
2 |
A durability model incorporating safe life methodology and damage tolerance approach to assess first inspection and maintenance period for structures
|
Xiong, J.J. |
|
2009 |
|
8 |
p. 1251-1258 8 p. |
artikel |
3 |
A framework to practical predictive maintenance modeling for multi-state systems
|
Ming Tan, Cher |
|
2008 |
|
8 |
p. 1138-1150 13 p. |
artikel |
4 |
ALARP—What does it really mean?
|
Jones-Lee, M. |
|
2011 |
|
8 |
p. 877-882 6 p. |
artikel |
5 |
Algorithm for estimating reliability confidence bounds of multi-state systems
|
Ramirez-Marquez, Jose Emmanuel |
|
2008 |
|
8 |
p. 1231-1243 13 p. |
artikel |
6 |
A multi-component and multi-failure mode inspection model based on the delay time concept
|
Wang, Wenbin |
|
2010 |
|
8 |
p. 912-920 9 p. |
artikel |
7 |
An accurate approximate solution of optimal sequential age replacement policy for a finite-time horizon
|
Jiang, R. |
|
2009 |
|
8 |
p. 1245-1250 6 p. |
artikel |
8 |
Analysis of the marine traffic safety in the Gulf of Finland
|
Kujala, P. |
|
2009 |
|
8 |
p. 1349-1357 9 p. |
artikel |
9 |
Analytical basis for evaluating the effect of unplanned interventions on the effectiveness of a human–robot system
|
Shah, Julie A. |
|
2008 |
|
8 |
p. 1280-1286 7 p. |
artikel |
10 |
An approach for prediction of petroleum production facility performance considering Arctic influence factors
|
Gao, Xueli |
|
2010 |
|
8 |
p. 837-846 10 p. |
artikel |
11 |
An evaluation system of the setting up of predictive maintenance programmes
|
Carnero, MaCarmen |
|
2006 |
|
8 |
p. 945-963 19 p. |
artikel |
12 |
An exact method for solving logical loops in reliability analysis
|
Matsuoka, Takeshi |
|
2009 |
|
8 |
p. 1282-1288 7 p. |
artikel |
13 |
An extended extreme shock maintenance model for a deteriorating system
|
Chen, Jinyuan |
|
2008 |
|
8 |
p. 1123-1129 7 p. |
artikel |
14 |
An integrated framework including distinct algorithms for optimization of offshore towers under uncertainties
|
Toğan, Vedat |
|
2010 |
|
8 |
p. 847-858 12 p. |
artikel |
15 |
A probabilistic cognitive simulator for HRA studies (PROCOS)
|
Trucco, P. |
|
2007 |
|
8 |
p. 1117-1130 14 p. |
artikel |
16 |
A short Boolean derivation of mean failure frequency for any (also non-coherent) system
|
Schneeweiss, Winfrid G. |
|
2009 |
|
8 |
p. 1363-1367 5 p. |
artikel |
17 |
A simple algorithm to generate all (d,B)-MCs of a multicommodity stochastic-flow network
|
Lin, Yi-Kuei |
|
2006 |
|
8 |
p. 923-929 7 p. |
artikel |
18 |
A study on the development of a task complexity measure for emergency operating procedures of nuclear power plants
|
Park, Jinkyun |
|
2007 |
|
8 |
p. 1102-1116 15 p. |
artikel |
19 |
A summary of periodic and random inspection policies
|
Nakagawa, T. |
|
2010 |
|
8 |
p. 906-911 6 p. |
artikel |
20 |
A supplemental algorithm for the repairable system in the GO methodology
|
Shen, Zupei |
|
2006 |
|
8 |
p. 940-944 5 p. |
artikel |
21 |
Balancing burn-in and mission times in environments with catastrophic and repairable failures
|
Bebbington, Mark |
|
2009 |
|
8 |
p. 1314-1321 8 p. |
artikel |
22 |
Bi and tri-objective optimization in the deterministic network interdiction problem
|
Rocco S., Claudio M. |
|
2010 |
|
8 |
p. 887-896 10 p. |
artikel |
23 |
Bias correction for the least squares estimator of Weibull shape parameter with complete and censored data
|
Zhang, L.F. |
|
2006 |
|
8 |
p. 930-939 10 p. |
artikel |
24 |
Business-oriented prioritization: A novel graphical technique
|
Pascual, R. |
|
2009 |
|
8 |
p. 1308-1313 6 p. |
artikel |
25 |
Calendar
|
|
|
2007 |
|
8 |
p. 1139-1140 2 p. |
artikel |
26 |
Calendar
|
|
|
2008 |
|
8 |
p. I-II nvt p. |
artikel |
27 |
Calendar
|
|
|
2009 |
|
8 |
p. I-II nvt p. |
artikel |
28 |
Calendar
|
|
|
2010 |
|
8 |
p. I-II nvt p. |
artikel |
29 |
Calendar
|
|
|
2006 |
|
8 |
p. 974- 1 p. |
artikel |
30 |
Calendar
|
|
|
2011 |
|
8 |
p. I-II nvt p. |
artikel |
31 |
Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents
|
Chang, Y.H.J. |
|
2007 |
|
8 |
p. 1041-1060 20 p. |
artikel |
32 |
Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents
|
Chang, Y.H.J. |
|
2007 |
|
8 |
p. 1076-1101 26 p. |
artikel |
33 |
Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents
|
Chang, Y.H.J. |
|
2007 |
|
8 |
p. 997-1013 17 p. |
artikel |
34 |
Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents. Part 4: IDAC causal model of operator problem-solving response
|
Chang, Y.H.J. |
|
2007 |
|
8 |
p. 1061-1075 15 p. |
artikel |
35 |
Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents. Part 2: IDAC performance influencing factors model
|
Chang, Y.H.J. |
|
2007 |
|
8 |
p. 1014-1040 27 p. |
artikel |
36 |
Comments on “Multi-objective genetic algorithm for solving N-version program design problem”
|
Littlewood, Bev |
|
2008 |
|
8 |
p. 1287- 1 p. |
artikel |
37 |
Computational methods for model reliability assessment
|
Rebba, Ramesh |
|
2008 |
|
8 |
p. 1197-1207 11 p. |
artikel |
38 |
Condition-based inspection/replacement policies for non-monotone deteriorating systems with environmental covariates
|
Zhao, Xuejing |
|
2010 |
|
8 |
p. 921-934 14 p. |
artikel |
39 |
Confidence bounds for the reliability of binary capacitated two-terminal networks
|
Ramírez-Márquez, José E. |
|
2006 |
|
8 |
p. 905-914 10 p. |
artikel |
40 |
Corrosion cracking prediction updating of deteriorating RC structures using inspection information
|
Suo, Qinghui |
|
2009 |
|
8 |
p. 1340-1348 9 p. |
artikel |
41 |
Design of fault simulator
|
Gabbar, Hossam A. |
|
2009 |
|
8 |
p. 1289-1298 10 p. |
artikel |
42 |
Design stage confirmation of lifetime improvement for newly modified products through accelerated life testing
|
Mohammadian, S. Hossein |
|
2010 |
|
8 |
p. 897-905 9 p. |
artikel |
43 |
Development and application of a Risk Assessment Tool
|
Majdara, Aref |
|
2008 |
|
8 |
p. 1130-1137 8 p. |
artikel |
44 |
Estimation of mixed Weibull distribution parameters using the SCEM-UA algorithm: Application and comparison with MLE in automotive reliability analysis
|
Gong, Zhejun |
|
2006 |
|
8 |
p. 915-922 8 p. |
artikel |
45 |
Extension of the RBD-FAST method to the computation of global sensitivity indices
|
Mara, Thierry Alex |
|
2009 |
|
8 |
p. 1274-1281 8 p. |
artikel |
46 |
Generalizing the safety factor approach
|
Clausen, Jonas |
|
2006 |
|
8 |
p. 964-973 10 p. |
artikel |
47 |
Incorporating organizational factors into probabilistic safety assessment of nuclear power plants through canonical probabilistic models
|
Galán, S.F. |
|
2007 |
|
8 |
p. 1131-1138 8 p. |
artikel |
48 |
Inside Front Cover/Editorial Board
|
|
|
2010 |
|
8 |
p. IFC- 1 p. |
artikel |
49 |
Inside Front Cover/Editorial Board
|
|
|
2009 |
|
8 |
p. IFC- 1 p. |
artikel |
50 |
Inside Front Cover/Editorial Board
|
|
|
2011 |
|
8 |
p. IFC- 1 p. |
artikel |
51 |
Is ALARP applicable to the management of terrorist risks?
|
Guikema, S.D. |
|
2010 |
|
8 |
p. 823-827 5 p. |
artikel |
52 |
Key attributes of the SAPHIRE risk and reliability analysis software for risk-informed probabilistic applications
|
Smith, Curtis |
|
2008 |
|
8 |
p. 1151-1164 14 p. |
artikel |
53 |
Mixing Bayes and empirical Bayes inference to anticipate the realization of engineering concerns about variant system designs
|
Quigley, John |
|
2011 |
|
8 |
p. 933-941 9 p. |
artikel |
54 |
Monte Carlo-based assessment of the safety performance of a radioactive waste repository
|
Cadini, F. |
|
2010 |
|
8 |
p. 859-865 7 p. |
artikel |
55 |
M out of n inspected systems subject to shocks in random environment
|
Kenzin, Moshe |
|
2009 |
|
8 |
p. 1322-1330 9 p. |
artikel |
56 |
New insights on multi-state component criticality and importance
|
Ramirez-Marquez, Jose E. |
|
2006 |
|
8 |
p. 894-904 11 p. |
artikel |
57 |
Non-parametric estimation of the availability in a general repairable system
|
Gámiz, M.L. |
|
2008 |
|
8 |
p. 1188-1196 9 p. |
artikel |
58 |
On systems with shared resources and optimal switching strategies
|
Finkelstein, Maxim |
|
2009 |
|
8 |
p. 1358-1362 5 p. |
artikel |
59 |
On terminating Poisson processes in some shock models
|
Finkelstein, Maxim |
|
2010 |
|
8 |
p. 874-879 6 p. |
artikel |
60 |
On the concept of e-maintenance: Review and current research
|
Muller, Alexandre |
|
2008 |
|
8 |
p. 1165-1187 23 p. |
artikel |
61 |
Optimal design of a general warm standby system
|
Yun, Won Young |
|
2010 |
|
8 |
p. 880-886 7 p. |
artikel |
62 |
Pipe break prediction based on evolutionary data-driven methods with brief recorded data
|
Xu, Qiang |
|
2011 |
|
8 |
p. 942-948 7 p. |
artikel |
63 |
Preventive strike vs. false targets and protection in defense strategy
|
Levitin, Gregory |
|
2011 |
|
8 |
p. 912-924 13 p. |
artikel |
64 |
Radiological risk analysis of particle accelerators
|
Chowdhury, Lekha M. |
|
2008 |
|
8 |
p. 1250-1256 7 p. |
artikel |
65 |
Reliability concepts applied to cutting tool change time
|
Patiño Rodriguez, Carmen Elena |
|
2010 |
|
8 |
p. 866-873 8 p. |
artikel |
66 |
Reliability demonstration test planning: A three dimensional consideration
|
Yadav, Om Prakash |
|
2006 |
|
8 |
p. 882-893 12 p. |
artikel |
67 |
Reliability modeling of degradation of products with multiple performance characteristics based on gamma processes
|
Pan, Zhengqiang |
|
2011 |
|
8 |
p. 949-957 9 p. |
artikel |
68 |
Reliable design space and complete single-loop reliability-based design optimization
|
Shan, Songqing |
|
2008 |
|
8 |
p. 1218-1230 13 p. |
artikel |
69 |
Reply to “Multi-objective genetic algorithm for solving N-version program design problem”
|
Yamachi, Hidemi |
|
2008 |
|
8 |
p. 1287- 1 p. |
artikel |
70 |
Reprioritization of failures in a system failure mode and effects analysis by decision making trial and evaluation laboratory technique
|
Seyed-Hosseini, S.M. |
|
2006 |
|
8 |
p. 872-881 10 p. |
artikel |
71 |
Research of psychological characteristics and performance relativity of operators
|
Xiang, Fang |
|
2008 |
|
8 |
p. 1244-1249 6 p. |
artikel |
72 |
Review of advances in human reliability analysis of errors of commission, Part 1: EOC identification
|
Reer, Bernhard |
|
2008 |
|
8 |
p. 1091-1104 14 p. |
artikel |
73 |
Review of advances in human reliability analysis of errors of commission—Part 2: EOC quantification
|
Reer, Bernhard |
|
2008 |
|
8 |
p. 1105-1122 18 p. |
artikel |
74 |
Risk assessment techniques for civil aviation security
|
Tamasi, Galileo |
|
2011 |
|
8 |
p. 892-899 8 p. |
artikel |
75 |
Risk classification and uncertainty propagation for virtual water distribution systems
|
Torres, Jacob M. |
|
2009 |
|
8 |
p. 1259-1273 15 p. |
artikel |
76 |
Safety analysis in process facilities: Comparison of fault tree and Bayesian network approaches
|
Khakzad, Nima |
|
2011 |
|
8 |
p. 925-932 8 p. |
artikel |
77 |
Safety margins confidence estimation for a passive residual heat removal system
|
Zio, Enrico |
|
2010 |
|
8 |
p. 828-836 9 p. |
artikel |
78 |
Scenario-informed multiple criteria analysis for prioritizing investments in electricity capacity expansion
|
Martinez, Lauro J. |
|
2011 |
|
8 |
p. 883-891 9 p. |
artikel |
79 |
Spurious activation of safety instrumented systems in the oil and gas industry: Basic concepts and formulas
|
Lundteigen, Mary Ann |
|
2008 |
|
8 |
p. 1208-1217 10 p. |
artikel |
80 |
Symptom-based reliability and generalized repairing cost in monitored bridges
|
Ceravolo, R. |
|
2009 |
|
8 |
p. 1331-1339 9 p. |
artikel |
81 |
Tabu search for the redundancy allocation problem of homogenous series–parallel multi-state systems
|
Ouzineb, Mohamed |
|
2008 |
|
8 |
p. 1257-1272 16 p. |
artikel |
82 |
The impact of aviation checkpoint queues on optimizing security screening effectiveness
|
Lee, Adrian J. |
|
2011 |
|
8 |
p. 900-911 12 p. |
artikel |
83 |
Using simultaneous higher-level and partial lower-level data in reliability assessments
|
Graves, T.L. |
|
2008 |
|
8 |
p. 1273-1279 7 p. |
artikel |
84 |
Validation of models with multivariate output
|
Rebba, Ramesh |
|
2006 |
|
8 |
p. 861-871 11 p. |
artikel |