nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Acknowledgments
|
Shanan, Leslie |
|
1992 |
22 |
1-2 |
p. ix- 1 p. |
artikel |
2 |
Chapter 2: Case studies
|
|
|
1992 |
22 |
1-2 |
p. 15-49 35 p. |
artikel |
3 |
Chapter 5: Cropping systems and water demand
|
|
|
1992 |
22 |
1-2 |
p. 81-104 24 p. |
artikel |
4 |
Chapter 11: Epilogue
|
|
|
1992 |
22 |
1-2 |
p. 221-224 4 p. |
artikel |
5 |
Chapter 7: Interrelated hydraulic, economic and environmental elements
|
|
|
1992 |
22 |
1-2 |
p. 113-145 33 p. |
artikel |
6 |
Chapter 1: Issues in irrigation
|
|
|
1992 |
22 |
1-2 |
p. 3-14 12 p. |
artikel |
7 |
Chapter 4: Linking the management structure to the canal network layout
|
|
|
1992 |
22 |
1-2 |
p. 65-77 13 p. |
artikel |
8 |
Chapter 10: Monsoon season delivery scheduling in water-constrained projects
|
|
|
1992 |
22 |
1-2 |
p. 207-219 13 p. |
artikel |
9 |
Chapter 8: Network design and layout
|
|
|
1992 |
22 |
1-2 |
p. 147-182 36 p. |
artikel |
10 |
Chapter 6: Preparing maps for network layout
|
|
|
1992 |
22 |
1-2 |
p. 105-112 8 p. |
artikel |
11 |
Chapter 3: Project objectives — the economics of assured and equitable deliveries
|
|
|
1992 |
22 |
1-2 |
p. 51-64 14 p. |
artikel |
12 |
Chapter 9: Scheduling deliveries with adequate supplies and with limited supplies
|
|
|
1992 |
22 |
1-2 |
p. 183-206 24 p. |
artikel |
13 |
Editorial Board
|
|
|
1992 |
22 |
1-2 |
p. vii- 1 p. |
artikel |
14 |
Forward
|
|
|
1992 |
22 |
1-2 |
p. xv-xvii nvt p. |
artikel |
15 |
Glossary
|
|
|
1992 |
22 |
1-2 |
p. 225-227 3 p. |
artikel |
16 |
List of Figures
|
Wolman, M.Gordon |
|
1992 |
22 |
1-2 |
p. xix-xx nvt p. |
artikel |
17 |
List of Tables
|
|
|
1992 |
22 |
1-2 |
p. xxi-xxiii nvt p. |
artikel |
18 |
Preface
|
|
|
1992 |
22 |
1-2 |
p. xi-xiv nvt p. |
artikel |
19 |
References
|
|
|
1992 |
22 |
1-2 |
p. 229-234 6 p. |
artikel |