nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A feature-based database evolution approach in the design process
|
da Cunha, Raimundo R.M. |
|
2002 |
18 |
3-4 |
p. 275-281 7 p. |
artikel |
2 |
A rule based expert system for rapid prototyping system selection
|
Masood, S.H. |
|
2002 |
18 |
3-4 |
p. 267-274 8 p. |
artikel |
3 |
A system architecture for holonic manufacturing planning and control (EtoPlan)
|
Wullink, G. |
|
2002 |
18 |
3-4 |
p. 313-318 6 p. |
artikel |
4 |
A task based ‘design for all’ support tool
|
Marshall, R. |
|
2002 |
18 |
3-4 |
p. 297-303 7 p. |
artikel |
5 |
A web-based expert system to assess the complexity of manufacturing organizations
|
Efstathiou, Janet |
|
2002 |
18 |
3-4 |
p. 305-311 7 p. |
artikel |
6 |
Development of a placement time estimator function for a turret style surface mount placement machine
|
Ellis, Kimberly P. |
|
2002 |
18 |
3-4 |
p. 241-254 14 p. |
artikel |
7 |
Diagnosis of multi-operational machining processes through variation propagation analysis
|
Huang, Qiang |
|
2002 |
18 |
3-4 |
p. 233-239 7 p. |
artikel |
8 |
Electrochemical machining: new possibilities for micromachining
|
Bhattacharyya, B |
|
2002 |
18 |
3-4 |
p. 283-289 7 p. |
artikel |
9 |
Equipment replacement decisions and lean manufacturing
|
Sullivan, William G. |
|
2002 |
18 |
3-4 |
p. 255-265 11 p. |
artikel |
10 |
Establishing and improving manufacturing performance measures
|
Ahmad, M.Munir |
|
2002 |
18 |
3-4 |
p. 171-176 6 p. |
artikel |
11 |
Flexible automation and intelligent manufacturing 2001
|
Ahmad, M.Munir |
|
2002 |
18 |
3-4 |
p. 169-170 2 p. |
artikel |
12 |
Impact of human error on lumber yield in rough mills
|
Buehlmann, Urs |
|
2002 |
18 |
3-4 |
p. 197-203 7 p. |
artikel |
13 |
Increasing CNC machine tool productivity by using tool-part touch control
|
Nenov, G.V. |
|
2002 |
18 |
3-4 |
p. 291-296 6 p. |
artikel |
14 |
Performance analysis and optimisation of shape recognition and classification using ANN
|
Nabhani, Farhad |
|
2002 |
18 |
3-4 |
p. 177-185 9 p. |
artikel |
15 |
Rules for integrating fast changeover capabilities into new equipment design
|
Van Goubergen, Dirk |
|
2002 |
18 |
3-4 |
p. 205-214 10 p. |
artikel |
16 |
Simulation of an optical sensing system for automatic object tracking
|
Golnabi, Hossein |
|
2002 |
18 |
3-4 |
p. 187-196 10 p. |
artikel |
17 |
The impact of different levels of detail in manufacturing systems simulation models
|
Persson, J.Fredrik |
|
2002 |
18 |
3-4 |
p. 319-325 7 p. |
artikel |
18 |
The impact of sequence changes on product lead time
|
Dupon, A. |
|
2002 |
18 |
3-4 |
p. 327-333 7 p. |
artikel |
19 |
The series–parallel replacement problem
|
Hartman, J.C. |
|
2002 |
18 |
3-4 |
p. 215-221 7 p. |
artikel |
20 |
Unrelated parallel machine scheduling with setup times using simulated annealing
|
Kim, Dong-Won |
|
2002 |
18 |
3-4 |
p. 223-231 9 p. |
artikel |