nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A bicriterion objective for levelling the schedule of a mixed-model, JIT assembly process
|
Steiner, G. |
|
1994 |
20 |
2 |
p. 123-134 12 p. |
artikel |
2 |
A scheduling problem in a semi-open job shop—the case of a cordset manufacturing company
|
Alfa, A.S. |
|
1994 |
20 |
2 |
p. 1-8 8 p. |
artikel |
3 |
Due window scheduling for parallel machines
|
Krämer, F.-J. |
|
1994 |
20 |
2 |
p. 69-89 21 p. |
artikel |
4 |
Genetically improved presequences for euclidean traveling salesman problems
|
Tate, D.M. |
|
1994 |
20 |
2 |
p. 135-143 9 p. |
artikel |
5 |
Job-shop scheduling with convex models of operations
|
Janiak, A. |
|
1994 |
20 |
2 |
p. 59-68 10 p. |
artikel |
6 |
Knapsack-like scheduling problems, the Moore-Hodgson algorithm and the ‘tower of sets’ property
|
Lawler, E.L. |
|
1994 |
20 |
2 |
p. 91-106 16 p. |
artikel |
7 |
Optimal assignment of due-dates for preemptive single-machine scheduling
|
Cheng, T.C.E. |
|
1994 |
20 |
2 |
p. 33-40 8 p. |
artikel |
8 |
Preface
|
Li, Chung-Lun |
|
1994 |
20 |
2 |
p. xi- 1 p. |
artikel |
9 |
Scheduling to minimize the total weighted completion time with a constraint on the release time resource consumption
|
Janiak, A. |
|
1994 |
20 |
2 |
p. 53-58 6 p. |
artikel |
10 |
Some complexity results in cyclic scheduling
|
McCormick, S.T. |
|
1994 |
20 |
2 |
p. 107-122 16 p. |
artikel |
11 |
Two-machine ordered flowshop scheduling under random breakdowns
|
Allahverdi, A. |
|
1994 |
20 |
2 |
p. 9-17 9 p. |
artikel |
12 |
Unrelated parallel machine scheduling using local search
|
Glass, C.A. |
|
1994 |
20 |
2 |
p. 41-52 12 p. |
artikel |
13 |
Vehicle scheduling in two-cycle flexible manufacturing systems
|
Blazewicz, J. |
|
1994 |
20 |
2 |
p. 19-31 13 p. |
artikel |