nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A diagonal completion and 2-optimal procedure for the travelling salesman problem
|
King, J.R. |
|
1990 |
13 |
3 |
p. 1-12 12 p. |
artikel |
2 |
A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
|
Miltenburg, J. |
|
1990 |
13 |
3 |
p. 57-66 10 p. |
artikel |
3 |
An efficient procedure for obtaining feasible solutions to the n-city traveling salesman problem
|
Feiring, B.R. |
|
1990 |
13 |
3 |
p. 67-71 5 p. |
artikel |
4 |
An efficient procedure for the N-city traveling salesman problem
|
Feiring, B.R. |
|
1990 |
13 |
3 |
p. 95-98 4 p. |
artikel |
5 |
A simpler and faster algorithm for optimal total-work-content-power due date determination
|
van de Velde, S.L. |
|
1990 |
13 |
3 |
p. 81-83 3 p. |
artikel |
6 |
Due-date-based performance measures for queuing models
|
Tate, D.M. |
|
1990 |
13 |
3 |
p. 85-92 8 p. |
artikel |
7 |
Foreword
|
Cheng, T.C.E. |
|
1990 |
13 |
3 |
p. vii- 1 p. |
artikel |
8 |
KBSS: A knowledge-based system for scheduling in automated manufacturing
|
Kusiak, A. |
|
1990 |
13 |
3 |
p. 37-55 19 p. |
artikel |
9 |
Priority dispatching rules in a fabrication/assembly shop
|
Sculli, D. |
|
1990 |
13 |
3 |
p. 73-79 7 p. |
artikel |
10 |
Scheduling groups of jobs in the two-machine flow shop
|
Baker, K.R |
|
1990 |
13 |
3 |
p. 29-36 8 p. |
artikel |
11 |
Search-based job shop scheduling and sequencing: Extensions to the search sequencing rule
|
O'Grady, P.J. |
|
1990 |
13 |
3 |
p. 13-27 15 p. |
artikel |
12 |
The NP-completeness of the n/m/parallel/C max preemptive due-date scheduling problem
|
Cheng, T.C.E. |
|
1990 |
13 |
3 |
p. 93-94 2 p. |
artikel |