nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A heuristic algorithm for the asymmetric capacitated vehicle routing problem
|
Vigo, Daniele |
|
1996 |
89 |
1 |
p. 108-126 19 p. |
artikel |
2 |
Analysis of a synchronization station for the performance evaluation of a kanban system with a general arrival process of demands
|
Mascolo, Maria Di |
|
1996 |
89 |
1 |
p. 147-163 17 p. |
artikel |
3 |
An interactive approach for vector optimization problems
|
Hussein, Mohammad L. |
|
1996 |
89 |
1 |
p. 185-192 8 p. |
artikel |
4 |
A note on programming problems with linear-plus-linear-fractional objective functions
|
Hirche, Joachim |
|
1996 |
89 |
1 |
p. 212-214 3 p. |
artikel |
5 |
Comment on D.J. White, “A characterization of the feasible set of objective function vectors in linear multiple objective problems”
|
Lotov, Alexander V. |
|
1996 |
89 |
1 |
p. 215-220 6 p. |
artikel |
6 |
Editorial Board
|
|
|
1996 |
89 |
1 |
p. ii- 1 p. |
artikel |
7 |
Erratum
|
|
|
1996 |
89 |
1 |
p. 221- 1 p. |
artikel |
8 |
Minimizing mean tardiness subject to unspecified minimum number tardy for a single machine
|
Ben-Daya, M. |
|
1996 |
89 |
1 |
p. 100-107 8 p. |
artikel |
9 |
Multi-level, single-machine lot sizing and scheduling (with initial inventory)
|
Kimms, A. |
|
1996 |
89 |
1 |
p. 86-99 14 p. |
artikel |
10 |
On the M/G/1 machine interference model with spares
|
Gupta, U.C. |
|
1996 |
89 |
1 |
p. 164-171 8 p. |
artikel |
11 |
Optimal access control for broadband services: Stochastic knapsack with advance information
|
Chius, Steve Y. |
|
1996 |
89 |
1 |
p. 127-134 8 p. |
artikel |
12 |
Optimal expansion of capacitated transshipment networks
|
Ahuja, R.K. |
|
1996 |
89 |
1 |
p. 176-184 9 p. |
artikel |
13 |
Optimization models for salesforce compensation
|
Albers, Sönke |
|
1996 |
89 |
1 |
p. 1-17 17 p. |
artikel |
14 |
Performance assessment in higher education in Britain
|
Johnes, Jill |
|
1996 |
89 |
1 |
p. 18-33 16 p. |
artikel |
15 |
Piecewise affine approximations for the control of a one-reservoir hydroelectric system
|
Drouin, Nicol |
|
1996 |
89 |
1 |
p. 53-69 17 p. |
artikel |
16 |
Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hard
|
Hoogeveen, J.A. |
|
1996 |
89 |
1 |
p. 172-175 4 p. |
artikel |
17 |
Solving the failure-to-fit problem for plant layout: By changing department shapes and sizes
|
Lin, Jin-Ling |
|
1996 |
89 |
1 |
p. 135-146 12 p. |
artikel |
18 |
State realization with exogenous variables - A test on blast furnace data
|
Saxen, Henrik |
|
1996 |
89 |
1 |
p. 34-52 19 p. |
artikel |
19 |
Team coordination in decision support projects
|
Mentzas, Gregory N. |
|
1996 |
89 |
1 |
p. 70-85 16 p. |
artikel |
20 |
Using approximate gradients in developing an interactive interior primal-dual multiobjective linear programming algorithm
|
Arbel, Ami |
|
1996 |
89 |
1 |
p. 202-211 10 p. |
artikel |
21 |
Using aspiration levels in an interactive interior multiobjective linear programming algorithm
|
Abel, Ami |
|
1996 |
89 |
1 |
p. 193-201 9 p. |
artikel |