nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A combined constraint-space, objective-space approach for determining high-dimensional maximal efficient faces of multiple objective linear programs
|
Dauer, Jerald P. |
|
1996 |
88 |
2 |
p. 368-381 14 p. |
artikel |
2 |
A dominant subset of V-shaped sequences for a class of single machine sequencing problems
|
Al-Turki, Umar M. |
|
1996 |
88 |
2 |
p. 345-347 3 p. |
artikel |
3 |
Arbitrated matching: Formulation and protocol
|
Ng, W.-Y. |
|
1996 |
88 |
2 |
p. 348-357 10 p. |
artikel |
4 |
A strategy for evolution of alhorithms to increase the computational effectiveness of NP-hard scheduling problems
|
Li, Der-Chiang |
|
1996 |
88 |
2 |
p. 404-412 9 p. |
artikel |
5 |
Conditional subgradient optimization — Theory and applications
|
Larsson, Torbjörn |
|
1996 |
88 |
2 |
p. 382-403 22 p. |
artikel |
6 |
Determination of the portfolio selection for a property-liability insurance company
|
Li, Susan X. |
|
1996 |
88 |
2 |
p. 257-268 12 p. |
artikel |
7 |
Economical and ecological utility oriented analysis of the process of anaerobic digestion of waste waters
|
Pavlov, Yu. |
|
1996 |
88 |
2 |
p. 251-256 6 p. |
artikel |
8 |
Minimizing deviations from the group mean: A new linear programming approach for the two-group classification problem
|
Lam, Kim Fung |
|
1996 |
88 |
2 |
p. 358-367 10 p. |
artikel |
9 |
On the estimation of optimal batch sizes in the analysis of simulation output
|
Song, Wheyming Tina |
|
1996 |
88 |
2 |
p. 304-319 16 p. |
artikel |
10 |
Project management with time, cost, and quality considerations
|
Babu, A.J.G. |
|
1996 |
88 |
2 |
p. 320-327 8 p. |
artikel |
11 |
Scheduling about a given common due date to minimize mean squared deviation of completion times
|
Weng, Xiaohua |
|
1996 |
88 |
2 |
p. 328-335 8 p. |
artikel |
12 |
Scheduling crackdowns on illicit drug markets
|
Naik, Ashich V. |
|
1996 |
88 |
2 |
p. 231-250 20 p. |
artikel |
13 |
Scheduling jobs with different, job-dependent earliness and tardiness penalties using the SLK method
|
Adamopoulos, G.I. |
|
1996 |
88 |
2 |
p. 336-344 9 p. |
artikel |
14 |
Setting planned lead times for multi-operation jobs
|
Matsuura, Haruki |
|
1996 |
88 |
2 |
p. 287-303 17 p. |
artikel |
15 |
SIMPSON: An intelligent assistant for short-term manufacturing scheduling
|
May, Jerrold H. |
|
1996 |
88 |
2 |
p. 269-286 18 p. |
artikel |
16 |
Statistical quality control and improvement
|
Stuart, Michael |
|
1996 |
88 |
2 |
p. 203-214 12 p. |
artikel |
17 |
Strategic planning of transportation services for petroleum products An application of capacitated gravity models
|
Douglas Smith, L. |
|
1996 |
88 |
2 |
p. 215-230 16 p. |
artikel |