nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A hybrid heuristic for the generalized assignment problem
|
Amini, Mohammad M. |
|
1995 |
87 |
2 |
p. 343-348 6 p. |
artikel |
2 |
A mixed integer model of bidding strategies for outsourcing
|
Nam, K. |
|
1995 |
87 |
2 |
p. 257-273 17 p. |
artikel |
3 |
Assignment of a job load in a distributed system: A multicriteria design method
|
Lee, Heeseok |
|
1995 |
87 |
2 |
p. 274-283 10 p. |
artikel |
4 |
A two-phase shortest path algorithm for networks with node coordinates
|
Lysgaard, Jens |
|
1995 |
87 |
2 |
p. 368-374 7 p. |
artikel |
5 |
Column generation applied to linear programs in course registration
|
Sankaran, Jayaram K. |
|
1995 |
87 |
2 |
p. 328-342 15 p. |
artikel |
6 |
Evaluating bank branch location and performance: A case study
|
Boufounou, Paraskevi V. |
|
1995 |
87 |
2 |
p. 389-402 14 p. |
artikel |
7 |
Example application of the cognitive design procedure for an order pick system: Case study
|
Yoon, Chang S. |
|
1995 |
87 |
2 |
p. 223-246 24 p. |
artikel |
8 |
Impact of job-sequence on the down-time of a deteriorating flexible machine
|
Chakravarty, Amiya K. |
|
1995 |
87 |
2 |
p. 299-315 17 p. |
artikel |
9 |
Optimal inventory policies under service-sensitive demand
|
Ernst, Ricardo |
|
1995 |
87 |
2 |
p. 316-327 12 p. |
artikel |
10 |
Optimal routing in a transportation network
|
GoczyĆla, Krzysztof |
|
1995 |
87 |
2 |
p. 214-222 9 p. |
artikel |
11 |
Performance bounds for the effectiveness of pooling in multi-processing systems
|
Benjaafar, Saifallah |
|
1995 |
87 |
2 |
p. 375-388 14 p. |
artikel |
12 |
PETAPS: A prototype decision support system for consumer product marketing and promotion
|
Davis, Joseph G. |
|
1995 |
87 |
2 |
p. 247-256 10 p. |
artikel |
13 |
Ramifications of tool magazine size on the makespan and routing flexibility of flexible manufacturing systems
|
Mohamed, Zubair M. |
|
1995 |
87 |
2 |
p. 289-298 10 p. |
artikel |
14 |
Simulation metamodel estimation using a combined correlation-based variance reduction technique for first and higher-order metamodels
|
Tew, Jeffrey D. |
|
1995 |
87 |
2 |
p. 349-367 19 p. |
artikel |
15 |
Single machine scheduling problem with fuzzy precedence relation
|
Ishii, Hiroaki |
|
1995 |
87 |
2 |
p. 284-288 5 p. |
artikel |
16 |
The capacitated plant location problem
|
Sridharan, R. |
|
1995 |
87 |
2 |
p. 203-213 11 p. |
artikel |