nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comparison of genetic and conventional methods for the solution of integer goal programmes
|
Mirrazavi, S.Keyvan |
|
2001 |
132 |
3 |
p. 594-602 9 p. |
artikel |
2 |
A flexible flowshop problem with total flow time minimization
|
Azizoğlu, Meral |
|
2001 |
132 |
3 |
p. 528-538 11 p. |
artikel |
3 |
Analysis of upper bounds for the Pallet Loading Problem
|
Letchford, Adam N. |
|
2001 |
132 |
3 |
p. 582-593 12 p. |
artikel |
4 |
A new Lagrangean relaxation approach for the hop-constrained minimum spanning tree problem
|
Gouveia, Luı́s |
|
2001 |
132 |
3 |
p. 539-552 14 p. |
artikel |
5 |
An investigation of model selection criteria for neural network time series forecasting
|
Qi, Min |
|
2001 |
132 |
3 |
p. 666-680 15 p. |
artikel |
6 |
A note on DEA vs principal component analysis: An improvement to Joe Zhu's approach
|
Premachandra, I.M. |
|
2001 |
132 |
3 |
p. 553-560 8 p. |
artikel |
7 |
A quadratic programming approach to the determination of an upper bound on the weighted stability number
|
Luz, Carlos J. |
|
2001 |
132 |
3 |
p. 569-581 13 p. |
artikel |
8 |
A taxonomy of strategic decisions and tactics for uncovering alternatives
|
Nutt, Paul C. |
|
2001 |
132 |
3 |
p. 505-527 23 p. |
artikel |
9 |
Characterization of certain orders using their associated choice functions
|
Rodrı́guez-Galiano, Isabel |
|
2001 |
132 |
3 |
p. 619-627 9 p. |
artikel |
10 |
Comparing the adaptive control methodology (ACM) to the financial planning practice of a large international group
|
Kunsch, P |
|
2001 |
132 |
3 |
p. 479-489 11 p. |
artikel |
11 |
Conditional investment policy under uncertainty and irreversibility
|
Yilmaz, Fatih |
|
2001 |
132 |
3 |
p. 681-686 6 p. |
artikel |
12 |
Contents of this Volume
|
|
|
2001 |
132 |
3 |
p. 703-705 3 p. |
artikel |
13 |
Dynamic capacitated user-optimal departure time/route choice problem with time-window
|
Chen, H.K. |
|
2001 |
132 |
3 |
p. 603-618 16 p. |
artikel |
14 |
Flow shop scheduling algorithms for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date
|
Gowrishankar, K. |
|
2001 |
132 |
3 |
p. 643-665 23 p. |
artikel |
15 |
Intervention methodology for complex problems: The FAcT–Mirror method
|
Cardinal, Gilles Le |
|
2001 |
132 |
3 |
p. 694-702 9 p. |
artikel |
16 |
On the optimal management of a class of aquatic ecological–economic systems
|
Batabyal, Amitrajeet A |
|
2001 |
132 |
3 |
p. 561-568 8 p. |
artikel |
17 |
Optimal inventory policies under decreasing cost functions via geometric programming
|
Jung, Hoon |
|
2001 |
132 |
3 |
p. 628-642 15 p. |
artikel |
18 |
Scheduling problems with a learning effect
|
Mosheiov, Gur |
|
2001 |
132 |
3 |
p. 687-693 7 p. |
artikel |
19 |
Selection and sequencing heuristics to reduce variance in gas turbine engine nozzle assemblies
|
Johanns, Patrick |
|
2001 |
132 |
3 |
p. 490-504 15 p. |
artikel |