1 |
A leak-before-break strategy for CANDU primary piping systems
|
Aggarwal, M.L. |
|
1986 |
25 |
1-4 |
p. 239-256 18 p. |
artikel |
2 |
A method for LEFM analysis of RPV during SBLOCA
|
Iskander, S.K. |
|
1986 |
25 |
1-4 |
p. 279-298 20 p. |
artikel |
3 |
Analyses and repair of defects found in the primary collector weld seams of the steam generators at loviisa nuclear power station
|
Ahlstrand, R. |
|
1986 |
25 |
1-4 |
p. 3-15 13 p. |
artikel |
4 |
Applicability of pipelocks as a remedy for intergranular stress corrosion cracking in BWRs
|
Abel, J.S. |
|
1986 |
25 |
1-4 |
p. 25-46 22 p. |
artikel |
5 |
Assessment of the influence of flaws on structural degradation and alternatives for repair and replacement
|
Stahlkopf, K.E. |
|
1986 |
25 |
1-4 |
p. 453-473 21 p. |
artikel |
6 |
Comparative evaluation of preventive measures against primary side stress corrosion cracking of mill annealed inconel 600 steam generator tubes
|
Frédérick, G. |
|
1986 |
25 |
1-4 |
p. 47-67 21 p. |
artikel |
7 |
Considerations on the manner of accounting for fast fracture risk in the design of PWR vessels
|
Pellissier-Tanon, A. |
|
1986 |
25 |
1-4 |
p. 217-229 13 p. |
artikel |
8 |
Discussions on session I
|
Stahlkopf, K.E. |
|
1986 |
25 |
1-4 |
p. 139-151 13 p. |
artikel |
9 |
Discussions on session II
|
Steele, L.E. |
|
1986 |
25 |
1-4 |
p. 299-309 11 p. |
artikel |
10 |
Discussions on session III
|
Steele, L.E. |
|
1986 |
25 |
1-4 |
p. 447-450 4 p. |
artikel |
11 |
Editorial Board
|
|
|
1986 |
25 |
1-4 |
p. IFC- 1 p. |
artikel |
12 |
Experience in the replacement of safety related piping in German boiling water reactors
|
Kussmaul, K. |
|
1986 |
25 |
1-4 |
p. 111-138 28 p. |
artikel |
13 |
Flaw analysis in steam generator tubes
|
Hutin, J.-P. |
|
1986 |
25 |
1-4 |
p. 267-278 12 p. |
artikel |
14 |
Hydrogen water chemistry operating experience
|
Cowan, R.L. |
|
1986 |
25 |
1-4 |
p. 313-331 19 p. |
artikel |
15 |
IHSI application to the welded joint with small cracks
|
Okamoto, A. |
|
1986 |
25 |
1-4 |
p. 393-412 20 p. |
artikel |
16 |
Improvement of structural integrity of LWR components
|
Ando, Y. |
|
1986 |
25 |
1-4 |
p. 413-445 33 p. |
artikel |
17 |
Index
|
|
|
1986 |
25 |
1-4 |
p. 475-481 7 p. |
artikel |
18 |
Influence of repair welding on cyclic thermal shock behaviour of a RPV nozzle corner
|
Kussmaul, K. |
|
1986 |
25 |
1-4 |
p. 89-109 21 p. |
artikel |
19 |
List of contributors
|
|
|
1986 |
25 |
1-4 |
p. xiii-xviii nvt p. |
artikel |
20 |
Methodology for repair/replacement decisions for flawed components
|
Iida, K. |
|
1986 |
25 |
1-4 |
p. 155-183 29 p. |
artikel |
21 |
Methods for preventing steam generator failure or degradation
|
Green, S.J. |
|
1986 |
25 |
1-4 |
p. 359-391 33 p. |
artikel |
22 |
Monticello recirculation piping replacement problems, contingencies, and evolving work scope
|
Neils, G.H. |
|
1986 |
25 |
1-4 |
p. 69-74 6 p. |
artikel |
23 |
On the trustworthiness of safety assessments for nuclear pressure vessels
|
Östberg, G. |
|
1986 |
25 |
1-4 |
p. 257-266 10 p. |
artikel |
24 |
Preface
|
Steele, L.E. |
|
1986 |
25 |
1-4 |
p. v-vii nvt p. |
artikel |
25 |
Prevention of bolting degradation or failure in pressure boundary and support applications
|
Merrick, E.A. |
|
1986 |
25 |
1-4 |
p. 333-357 25 p. |
artikel |
26 |
Principles of the German approach to the analysis of flawed structures
|
Kussmaul, K. |
|
1986 |
25 |
1-4 |
p. 185-215 31 p. |
artikel |
27 |
Ringhals No. 2—Steam generator repair/replacement options
|
Hunyadi, L. |
|
1986 |
25 |
1-4 |
p. 75-87 13 p. |
artikel |
28 |
United states criteria for repair and replacement of BWR piping and steam generator tubing
|
Vollmer, R.H. |
|
1986 |
25 |
1-4 |
p. 231-238 8 p. |
artikel |
29 |
Weld overlay of BWR flawed piping
|
Edwards, N.W. |
|
1986 |
25 |
1-4 |
p. 17-24 8 p. |
artikel |