nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Benders based rolling horizon algorithm for a dynamic facility location problem
|
Marufuzzaman, Mohammad |
|
2016 |
98 |
C |
p. 462-469 8 p. |
artikel |
2 |
A control scheme for autocorrelated bivariate binomial data
|
He, Zhen |
|
2016 |
98 |
C |
p. 350-359 10 p. |
artikel |
3 |
A Hungarian penalty-based construction algorithm to minimize makespan and total flow time in no-wait flow shops
|
Laha, Dipak |
|
2016 |
98 |
C |
p. 373-383 11 p. |
artikel |
4 |
A hybrid approach for performance evaluation and optimized selection of recoverable end-of-life products in the reverse supply chain
|
Meng, Kai |
|
2016 |
98 |
C |
p. 171-184 14 p. |
artikel |
5 |
A hybrid genetic algorithm with two-stage dispatching heuristic for a machine scheduling problem with step-deteriorating jobs and rate-modifying activities
|
Chung, Byung Do |
|
2016 |
98 |
C |
p. 113-124 12 p. |
artikel |
6 |
A hybrid iterated greedy algorithm for total tardiness minimization in permutation flowshops
|
Karabulut, Korhan |
|
2016 |
98 |
C |
p. 300-307 8 p. |
artikel |
7 |
A MILP model and heuristic approach for facility location under multiple operational constraints
|
Kchaou Boujelben, Mouna |
|
2016 |
98 |
C |
p. 446-461 16 p. |
artikel |
8 |
A multi-criteria approach to robust outsourcing decision-making in stochastic manufacturing systems
|
Hahn, Gerd J. |
|
2016 |
98 |
C |
p. 275-288 14 p. |
artikel |
9 |
An integrated approach to optimise sugarcane rail operations
|
Masoud, Mahmoud |
|
2016 |
98 |
C |
p. 211-220 10 p. |
artikel |
10 |
An integrated flight scheduling and fleet assignment method based on a discrete choice model
|
Dong, Zhang |
|
2016 |
98 |
C |
p. 195-210 16 p. |
artikel |
11 |
An integrating OWA–TOPSIS framework in intuitionistic fuzzy settings for multiple attribute decision making
|
Wang, Tianri |
|
2016 |
98 |
C |
p. 185-194 10 p. |
artikel |
12 |
Application of analytic network process and two-dimensional matrix evaluating decision for design strategy
|
Chiang, Ya-Mei |
|
2016 |
98 |
C |
p. 237-245 9 p. |
artikel |
13 |
A PSO algorithm for multi-objective hull assembly line balancing using the stratified optimization strategy
|
Yuguang, Zhong |
|
2016 |
98 |
C |
p. 53-62 10 p. |
artikel |
14 |
A review of cost estimation models for determining assembly automation level
|
Salmi, A. |
|
2016 |
98 |
C |
p. 246-259 14 p. |
artikel |
15 |
A robust bi-objective model for concurrent planning of project scheduling and material procurement
|
Tabrizi, Babak H. |
|
2016 |
98 |
C |
p. 11-29 19 p. |
artikel |
16 |
A robust heuristic method on the clustering-assignment problem model
|
Chuang, Yi-Fei |
|
2016 |
98 |
C |
p. 63-67 5 p. |
artikel |
17 |
A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: A case study
|
Rahmani, Donya |
|
2016 |
98 |
C |
p. 360-372 13 p. |
artikel |
18 |
Breakout dynasearch for the single-machine total weighted tardiness problem
|
Ding, Junwen |
|
2016 |
98 |
C |
p. 1-10 10 p. |
artikel |
19 |
Competitive remanufacturing strategy and take-back decision with OEM remanufacturing
|
Wu, Cheng-Han |
|
2016 |
98 |
C |
p. 149-163 15 p. |
artikel |
20 |
Computational complexity and solution algorithms for a vector sequencing problem
|
Rudek, Radosław |
|
2016 |
98 |
C |
p. 384-400 17 p. |
artikel |
21 |
Corrigendum to “Solving a reverse supply chain design problem by improved Benders decomposition schemes” [Comput. Ind. Eng. 66 (4) (2013) 889–898]
|
Santibanez-Gonzalez, Ernesto D.R. |
|
2016 |
98 |
C |
p. 498- 1 p. |
artikel |
22 |
Designing cellular manufacturing systems considering S-shaped layout
|
Mohammadi, Mohammad |
|
2016 |
98 |
C |
p. 221-236 16 p. |
artikel |
23 |
Estimated network reliability evaluation for a stochastic flexible flow shop network with different types of jobs
|
Lin, Yi-Kuei |
|
2016 |
98 |
C |
p. 401-412 12 p. |
artikel |
24 |
Exact algorithms for single-machine scheduling problems with a variable maintenance
|
Ying, Kuo-Ching |
|
2016 |
98 |
C |
p. 427-433 7 p. |
artikel |
25 |
Generating patent development maps for technology monitoring using semantic patent-topic analysis
|
Kim, Mujin |
|
2016 |
98 |
C |
p. 289-299 11 p. |
artikel |
26 |
Identification of congestion by means of integer-valued data envelopment analysis
|
Karimi, Balal |
|
2016 |
98 |
C |
p. 513-521 9 p. |
artikel |
27 |
IFC Area editor list
|
|
|
2016 |
98 |
C |
p. IFC- 1 p. |
artikel |
28 |
Low carbon chance constrained supply chain network design problem: a Benders decomposition based approach
|
Shaw, Krishnendu |
|
2016 |
98 |
C |
p. 483-497 15 p. |
artikel |
29 |
Model-based delivery cost approximation in attended home services
|
Bühler, Dominic |
|
2016 |
98 |
C |
p. 78-90 13 p. |
artikel |
30 |
Monitoring simple linear profiles in multistage processes by a MaxEWMA control chart
|
Khedmati, Majid |
|
2016 |
98 |
C |
p. 125-143 19 p. |
artikel |
31 |
Multi-objective dynamic cell formation problem: A stochastic programming approach
|
Zohrevand, A.M. |
|
2016 |
98 |
C |
p. 323-332 10 p. |
artikel |
32 |
New criteria for configuration of cellular manufacturing considering product mix variation
|
Bootaki, Behrang |
|
2016 |
98 |
C |
p. 413-426 14 p. |
artikel |
33 |
On “A fuzzy bi-criteria transportation problem”: A revised algorithm
|
Keshavarz, Esmail |
|
2016 |
98 |
C |
p. 144-148 5 p. |
artikel |
34 |
On supplier encroachment with retailer’s fairness concerns
|
Li, Tingting |
|
2016 |
98 |
C |
p. 499-512 14 p. |
artikel |
35 |
Optimal maintenance policy for a system with preventive repair and two types of failures
|
Zheng, Zhibin |
|
2016 |
98 |
C |
p. 102-112 11 p. |
artikel |
36 |
Optimal maintenance–replacement policy of products with competing failures after expiry of the warranty
|
Shang, Lijun |
|
2016 |
98 |
C |
p. 68-77 10 p. |
artikel |
37 |
Optimization of integrated preventive maintenance based on infinitesimal perturbation analysis
|
Ramirez Restrepo, Laura M. |
|
2016 |
98 |
C |
p. 470-482 13 p. |
artikel |
38 |
Overhaul planning and exchange scheduling for maintenance services with rotable inventory and limited processing capacity
|
Erkoc, Murat |
|
2016 |
98 |
C |
p. 30-39 10 p. |
artikel |
39 |
Phase II profile monitoring based on proportional odds models
|
Huwang, Longcheen |
|
2016 |
98 |
C |
p. 543-553 11 p. |
artikel |
40 |
Plunge milling time optimization via mixed-integer nonlinear programming
|
Cafieri, Sonia |
|
2016 |
98 |
C |
p. 434-445 12 p. |
artikel |
41 |
Pre 1 Editorial Board
|
|
|
2016 |
98 |
C |
p. i- 1 p. |
artikel |
42 |
Production planning in the molded pulp packaging industry
|
Martínez, Karim Y.P. |
|
2016 |
98 |
C |
p. 554-566 13 p. |
artikel |
43 |
Resource-constrained unrelated parallel machine scheduling problem with sequence dependent setup times, precedence constraints and machine eligibility restrictions
|
Afzalirad, Mojtaba |
|
2016 |
98 |
C |
p. 40-52 13 p. |
artikel |
44 |
Schedule-based execution bottleneck identification in a job shop
|
Wang, Jun-Qiang |
|
2016 |
98 |
C |
p. 308-322 15 p. |
artikel |
45 |
Service conflict identification and resolution for design of product–service offerings
|
Song, Wenyan |
|
2016 |
98 |
C |
p. 91-101 11 p. |
artikel |
46 |
Service level enhancement in newsvendor model
|
Aldaihani, Majid M. |
|
2016 |
98 |
C |
p. 164-170 7 p. |
artikel |
47 |
The consignment stock case for a vendor and a buyer with delay-in-payments
|
Zahran, Siraj K. |
|
2016 |
98 |
C |
p. 333-349 17 p. |
artikel |
48 |
The distributionally robust newsvendor problem with dual sourcing under carbon tax and cap-and-trade regulations
|
Bai, Qingguo |
|
2016 |
98 |
C |
p. 260-274 15 p. |
artikel |
49 |
The symmetrical interval intuitionistic uncertain linguistic operators and their application to decision making
|
Meng, Fanyong |
|
2016 |
98 |
C |
p. 531-542 12 p. |
artikel |
50 |
Using the design for Six Sigma approach with TRIZ for new product development
|
Wang, Fu-Kwun |
|
2016 |
98 |
C |
p. 522-530 9 p. |
artikel |