nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A comprehensive mathematical model for dynamic cellular manufacturing system design and Linear Programming embedded hybrid solution techniques
|
Bayram, Hüsamettin |
|
2016 |
91 |
C |
p. 10-29 20 p. |
artikel |
2 |
A group multi-granularity linguistic-based methodology for prioritizing engineering characteristics under uncertainties
|
Wang, Zengqiang |
|
2016 |
91 |
C |
p. 178-187 10 p. |
artikel |
3 |
Alleviating food disparities with mobile retailers: Dissecting the problem from an OR perspective
|
Wishon, Christopher |
|
2016 |
91 |
C |
p. 154-164 11 p. |
artikel |
4 |
A Lévy flight embedded particle swarm optimization for multi-objective parallel-machine scheduling with learning and adapting considerations
|
Pakzad-Moghaddam, S.H. |
|
2016 |
91 |
C |
p. 109-128 20 p. |
artikel |
5 |
An improved mathematical model and a hybrid metaheuristic for truck scheduling in cross-dock problems
|
Keshtzari, M. |
|
2016 |
91 |
C |
p. 197-204 8 p. |
artikel |
6 |
An integrated resource allocation and distribution model for pre-disaster planning
|
Pradhananga, Rojee |
|
2016 |
91 |
C |
p. 229-238 10 p. |
artikel |
7 |
A review of mathematical models for supporting the order promising process under Lack of Homogeneity in Product and other sources of uncertainty
|
Grillo, H. |
|
2016 |
91 |
C |
p. 239-261 23 p. |
artikel |
8 |
A side-sensitive synthetic chart combined with a VSS X ‾ chart
|
Costa, Antonio F.B. |
|
2016 |
91 |
C |
p. 205-214 10 p. |
artikel |
9 |
A Two-Level solution approach to solve the Clustered Capacitated Vehicle Routing Problem
|
Expósito-Izquierdo, Christopher |
|
2016 |
91 |
C |
p. 274-289 16 p. |
artikel |
10 |
Competence-based performance model of multi-skilled workers
|
Małachowski, Bartłomiej |
|
2016 |
91 |
C |
p. 165-177 13 p. |
artikel |
11 |
Corporate Memory: Design to better reduce, reuse and recycle
|
Huang, Chun-Che |
|
2016 |
91 |
C |
p. 48-65 18 p. |
artikel |
12 |
Designing a reliable bio-fuel supply chain network considering link failure probabilities
|
Poudel, Sushil R. |
|
2016 |
91 |
C |
p. 85-99 15 p. |
artikel |
13 |
Dynamics of quality improvement programs – Optimal investment policies
|
Duarte, Belmiro P.M. |
|
2016 |
91 |
C |
p. 215-228 14 p. |
artikel |
14 |
Event driven strategy based complete rescheduling approaches for dynamic m identical parallel machines scheduling problem with a common server
|
Hamzadayi, Alper |
|
2016 |
91 |
C |
p. 66-84 19 p. |
artikel |
15 |
Feature extraction using rough set theory in service sector application from incremental perspective
|
Huang, Chun-Che |
|
2016 |
91 |
C |
p. 30-41 12 p. |
artikel |
16 |
Green supplier development program selection using NGT and VIKOR under fuzzy environment
|
Awasthi, Anjali |
|
2016 |
91 |
C |
p. 100-108 9 p. |
artikel |
17 |
Harvest logistics in agricultural systems with multiple, independent producers and no on-farm storage
|
Lamsal, Kamal |
|
2016 |
91 |
C |
p. 129-138 10 p. |
artikel |
18 |
IFC Area editor list
|
|
|
2016 |
91 |
C |
p. IFC- 1 p. |
artikel |
19 |
Joint modeling of preventive maintenance and quality improvement for deteriorating single-machine manufacturing systems
|
Lu, Biao |
|
2016 |
91 |
C |
p. 188-196 9 p. |
artikel |
20 |
Local and random searches for dispatch and conflict-free routing problem of capacitated AGV systems
|
Miyamoto, Toshiyuki |
|
2016 |
91 |
C |
p. 1-9 9 p. |
artikel |
21 |
Machine scheduling with deteriorating jobs and DeJong’s learning effect
|
Ji, Min |
|
2016 |
91 |
C |
p. 42-47 6 p. |
artikel |
22 |
Metamodel-based direction guidance system optimization for improving efficiency of aircraft emergency evacuation
|
Liu, Yu |
|
2016 |
91 |
C |
p. 302-314 13 p. |
artikel |
23 |
Minimizing the total completion time on a parallel machine system with tool changes
|
Costa, A. |
|
2016 |
91 |
C |
p. 290-301 12 p. |
artikel |
24 |
Payment models and net present value optimization for resource-constrained project scheduling
|
Leyman, Pieter |
|
2016 |
91 |
C |
p. 139-153 15 p. |
artikel |
25 |
Pre 1 Editorial Board
|
|
|
2016 |
91 |
C |
p. i- 1 p. |
artikel |
26 |
Single-machine rework rescheduling to minimize maximum waiting-times with fixed sequence of jobs and ready times
|
Guo, Yandong |
|
2016 |
91 |
C |
p. 262-273 12 p. |
artikel |