nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A forecasting model for small non-equigap data sets considering data weights and occurrence possibilities
|
Chang, Che-Jung |
|
2014 |
67 |
C |
p. 139-145 7 p. |
artikel |
2 |
A hybrid Electromagnetism-like Mechanism/tabu search procedure for the single machine scheduling problem with a maximum lateness objective
|
Sels, Veronique |
|
2014 |
67 |
C |
p. 44-55 12 p. |
artikel |
3 |
An Exponential Monte-Carlo algorithm for feature selection problems
|
Abdullah, Salwani |
|
2014 |
67 |
C |
p. 160-167 8 p. |
artikel |
4 |
An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop
|
Laha, Dipak |
|
2014 |
67 |
C |
p. 36-43 8 p. |
artikel |
5 |
Application of graph search and genetic algorithms for the single machine scheduling problem with sequence-dependent setup times and quadratic penalty function of completion times
|
Kodaganallur, Viswanathan |
|
2014 |
67 |
C |
p. 10-19 10 p. |
artikel |
6 |
A typology of the situations of cooperation in supply chains
|
Ming, Yue |
|
2014 |
67 |
C |
p. 56-71 16 p. |
artikel |
7 |
A variable-reduction technique for the fixed-route vehicle-refueling problem
|
Suzuki, Yoshinori |
|
2014 |
67 |
C |
p. 204-215 12 p. |
artikel |
8 |
Change point estimation of high-yield processes experiencing monotonic disturbances
|
Niaki, Seyed Taghi Akhavan |
|
2014 |
67 |
C |
p. 82-92 11 p. |
artikel |
9 |
Collaborative production planning with production time windows and order splitting in make-to-order manufacturing
|
Pan, Tianyi |
|
2014 |
67 |
C |
p. 1-9 9 p. |
artikel |
10 |
Comments on “Heuristic search for scheduling flexible manufacturing systems using lower bound reachability matrix”
|
Huang, Bo |
|
2014 |
67 |
C |
p. 235-236 2 p. |
artikel |
11 |
Computational performances of a simple interchange heuristic for a scheduling problem with an availability constraint
|
Moncel, Julien |
|
2014 |
67 |
C |
p. 216-222 7 p. |
artikel |
12 |
Corrigendum to “Development of a module based service family design for mass customization of airline sector using the coalition game” [Comput. Ind. Eng. 66 (4) (2013) 827–833]
|
Aggarwal, Aman |
|
2014 |
67 |
C |
p. 234- 1 p. |
artikel |
13 |
How to combine inconsistent ordinal and cardinal preferences: A satisficing modelling approach
|
González-Pachón, Jacinto |
|
2014 |
67 |
C |
p. 168-172 5 p. |
artikel |
14 |
IFC Area editor list
|
|
|
2014 |
67 |
C |
p. IFC- 1 p. |
artikel |
15 |
Incomplete interval fuzzy preference relations and their applications
|
Xu, Yejun |
|
2014 |
67 |
C |
p. 93-103 11 p. |
artikel |
16 |
Induced generalized hesitant fuzzy operators and their application to multiple attribute group decision making
|
Zhang, Zhiming |
|
2014 |
67 |
C |
p. 116-138 23 p. |
artikel |
17 |
Logistical support scheduling under stochastic travel times given an emergency repair work schedule
|
Yan, Shangyao |
|
2014 |
67 |
C |
p. 20-35 16 p. |
artikel |
18 |
On efficient use of auxiliary information for control charting in SPC
|
Ahmad, Shabbir |
|
2014 |
67 |
C |
p. 173-184 12 p. |
artikel |
19 |
Optimal design of the double sampling X ¯ chart with estimated parameters based on median run length
|
Teoh, W.L. |
|
2014 |
67 |
C |
p. 104-115 12 p. |
artikel |
20 |
Optimum preventive maintenance policies for systems subject to random working times, replacement, and minimal repair
|
Chang, Chin-Chih |
|
2014 |
67 |
C |
p. 185-194 10 p. |
artikel |
21 |
Pre 1 Editorial Board
|
|
|
2014 |
67 |
C |
p. i- 1 p. |
artikel |
22 |
Production scheduling of assembly fixtures in the aeronautical industry
|
da Silva, Bruno Jensen Virginio |
|
2014 |
67 |
C |
p. 195-203 9 p. |
artikel |
23 |
Selection of the optimal configuration for a flexible surface mount assembly system based on the interrelationships among the flexibility elements
|
Tsai, Tsung-Nan |
|
2014 |
67 |
C |
p. 146-159 14 p. |
artikel |
24 |
The impact of food perishability issues in the vehicle routing problem
|
Amorim, P. |
|
2014 |
67 |
C |
p. 223-233 11 p. |
artikel |
25 |
Workforce planning and technology installation optimisation for utilities
|
Jennings, Mark G. |
|
2014 |
67 |
C |
p. 72-81 10 p. |
artikel |