nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Analysis of robustness in proactive scheduling: A graphical approach
|
Ghezail, Feiza |
|
2010 |
58 |
2 |
p. 193-198 6 p. |
artikel |
2 |
An analytic hierarchy process approach with linguistic variables for selection of an R&D strategic alliance partner
|
Chen, Sheu Hua |
|
2010 |
58 |
2 |
p. 278-287 10 p. |
artikel |
3 |
An integrated fuzzy multi-criteria approach for the performance evaluation of multiple manufacturing plants
|
Yu, Vincent F. |
|
2010 |
58 |
2 |
p. 269-277 9 p. |
artikel |
4 |
An optimized tailored nonlinear fluctuation smoothing rule for scheduling a semiconductor manufacturing factory
|
Chen, Toly |
|
2010 |
58 |
2 |
p. 317-325 9 p. |
artikel |
5 |
A novel global harmony search algorithm for reliability problems
|
Zou, Dexuan |
|
2010 |
58 |
2 |
p. 307-316 10 p. |
artikel |
6 |
A planning and scheduling problem for an operating theatre using an open scheduling strategy
|
Fei, H. |
|
2010 |
58 |
2 |
p. 221-230 10 p. |
artikel |
7 |
A simulated annealing heuristic for the capacitated location routing problem
|
Yu, Vincent F. |
|
2010 |
58 |
2 |
p. 288-299 12 p. |
artikel |
8 |
A survey of scheduling with deterministic machine availability constraints
|
Ma, Ying |
|
2010 |
58 |
2 |
p. 199-211 13 p. |
artikel |
9 |
Contents contd. from OBC
|
|
|
2010 |
58 |
2 |
p. IV- 1 p. |
artikel |
10 |
Elite guided steady-state genetic algorithm for minimizing total tardiness in flowshops
|
Kellegöz, Talip |
|
2010 |
58 |
2 |
p. 300-306 7 p. |
artikel |
11 |
Minimum cost path location for maximum traffic capture
|
Gutiérrez-Jarpa, Gabriel |
|
2010 |
58 |
2 |
p. 332-341 10 p. |
artikel |
12 |
Operating theatre scheduling with patient recovery in both operating rooms and recovery beds
|
Augusto, Vincent |
|
2010 |
58 |
2 |
p. 231-238 8 p. |
artikel |
13 |
Pre 1 Editorial Board
|
|
|
2010 |
58 |
2 |
p. i- 1 p. |
artikel |
14 |
Regular papers
|
|
|
2010 |
58 |
2 |
p. EX1- 1 p. |
artikel |
15 |
Scheduling an operating theatre under human resource constraints
|
Roland, B. |
|
2010 |
58 |
2 |
p. 212-220 9 p. |
artikel |
16 |
Scheduling problems with deteriorating jobs and learning effects including proportional setup times
|
Cheng, T.C.E. |
|
2010 |
58 |
2 |
p. 326-331 6 p. |
artikel |
17 |
Series production in a basic re-entrant shop to minimize makespan or total flow time
|
Chu, Feng |
|
2010 |
58 |
2 |
p. 257-268 12 p. |
artikel |
18 |
Special issue on scheduling in healthcare and industrial systems: Extensions of selected papers presented at the international conference on industrial engineering and systems management 2007
|
Artiba, Abdelhakim |
|
2010 |
58 |
2 |
p. 191-192 2 p. |
artikel |
19 |
Steelmaking and refining coordinated scheduling problem with waiting time and transportation consideration
|
Tang, Lixin |
|
2010 |
58 |
2 |
p. 239-248 10 p. |
artikel |
20 |
Training a neural network to select dispatching rules in real time
|
Mouelhi-Chibani, Wiem |
|
2010 |
58 |
2 |
p. 249-256 8 p. |
artikel |