nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A column generation heuristic for complex job shop multiple orders per job scheduling
|
Jampani, Jagadish |
|
2010 |
58 |
1 |
p. 108-118 11 p. |
artikel |
2 |
A fast metaheuristic for scheduling independent tasks with multiple modes
|
Caramia, Massimiliano |
|
2010 |
58 |
1 |
p. 64-69 6 p. |
artikel |
3 |
A hybrid alternate two phases particle swarm optimization algorithm for flow shop scheduling problem
|
Zhang, Changsheng |
|
2010 |
58 |
1 |
p. 1-11 11 p. |
artikel |
4 |
An approach to group decision-making with uncertain preference ordinals
|
Fan, Zhi-Ping |
|
2010 |
58 |
1 |
p. 51-57 7 p. |
artikel |
5 |
Capacitated lot sizing with linked lots for general product structures in job shops
|
Oztürk, C. |
|
2010 |
58 |
1 |
p. 151-164 14 p. |
artikel |
6 |
Economic order quantity model for items with imperfect quality, different holding costs, and learning effects: A note
|
Wahab, M.I.M. |
|
2010 |
58 |
1 |
p. 186-190 5 p. |
artikel |
7 |
Effects of extension of subcontracting on a production system in a joint maintenance and production context
|
Dahane, Mohammed |
|
2010 |
58 |
1 |
p. 88-96 9 p. |
artikel |
8 |
Inventory and distribution strategies for retail/e-tail organizations
|
Bretthauer, Kurt M. |
|
2010 |
58 |
1 |
p. 119-132 14 p. |
artikel |
9 |
Learning and adaptation of a policy for dynamic order acceptance in make-to-order manufacturing
|
Arredondo, Facundo |
|
2010 |
58 |
1 |
p. 70-83 14 p. |
artikel |
10 |
Optimization of the supply chain network: Simulation, Taguchi, and Psychoclonal algorithm embedded approach
|
Shukla, Sanjay Kumar |
|
2010 |
58 |
1 |
p. 29-39 11 p. |
artikel |
11 |
Optimizing material procurement planning problem by two-stage fuzzy programming
|
Sun, Gao-Ji |
|
2010 |
58 |
1 |
p. 97-107 11 p. |
artikel |
12 |
Parallel dedicated machine scheduling problem with sequence-dependent setups and a single server
|
Huang, Simin |
|
2010 |
58 |
1 |
p. 165-174 10 p. |
artikel |
13 |
Pre 1 Editorial Board
|
|
|
2010 |
58 |
1 |
p. i- 1 p. |
artikel |
14 |
Process-oriented basis representation for a multivariate gauge study
|
Wang, Fu-Kwun |
|
2010 |
58 |
1 |
p. 143-150 8 p. |
artikel |
15 |
Scheduling trucks in cross-docking systems: Robust meta-heuristics
|
Vahdani, B. |
|
2010 |
58 |
1 |
p. 12-24 13 p. |
artikel |
16 |
Simulation based experimental design to identify factors affecting performance of AVS/RS
|
Ekren, Banu Y. |
|
2010 |
58 |
1 |
p. 175-185 11 p. |
artikel |
17 |
Single-machine scheduling time-dependent jobs with resource-dependent ready times
|
Zhu, Valerie C.Y. |
|
2010 |
58 |
1 |
p. 84-87 4 p. |
artikel |
18 |
Single machine scheduling with time-dependent deterioration and exponential learning effect
|
Huang, Xue |
|
2010 |
58 |
1 |
p. 58-63 6 p. |
artikel |
19 |
Some scheduling problems with deteriorating jobs and learning effects
|
Yang, Dar-Li |
|
2010 |
58 |
1 |
p. 25-28 4 p. |
artikel |
20 |
The allocation of berths and quay cranes by using a sub-gradient optimization technique
|
Zhang, Canrong |
|
2010 |
58 |
1 |
p. 40-50 11 p. |
artikel |
21 |
The moderating effect of occupation on the perception of information services quality and success
|
Landrum, Hollis |
|
2010 |
58 |
1 |
p. 133-142 10 p. |
artikel |