nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An algorithm to schedule aircraft to sorties
|
Howard, William |
|
1980 |
4 |
2 |
p. 95-101 7 p. |
artikel |
2 |
Design of complex flow line system by simulation
|
Ozan, Turgut M. |
|
1980 |
4 |
2 |
p. 75-85 11 p. |
artikel |
3 |
Development of a procedure for classifying and retrieving scheduling bibliographic materials
|
Webster, Dennis B. |
|
1980 |
4 |
2 |
p. 131-141 11 p. |
artikel |
4 |
Learning curve calculation and plotting
|
Hatcher, B.L. |
|
1980 |
4 |
2 |
p. 87-93 7 p. |
artikel |
5 |
Measuring complexity in structured vs unstructured cobol programs
|
Zolnowski, Jean Cochrane |
|
1980 |
4 |
2 |
p. 103-114 12 p. |
artikel |
6 |
Multi-media instructional approach to teaching linear programming
|
Ravindran, A. |
|
1980 |
4 |
2 |
p. 115-124 10 p. |
artikel |
7 |
Optimizing machining parameters in a framework for adaptive computer control
|
Davis, Robert P. |
|
1980 |
4 |
2 |
p. 143-151 9 p. |
artikel |
8 |
Simulation of adaptive controlled machining
|
Wysk, Richard A. |
|
1980 |
4 |
2 |
p. 69-74 6 p. |
artikel |
9 |
The tactical air-to-ground systems effectiveness model
|
Hubler, Robert D. |
|
1980 |
4 |
2 |
p. 125-130 6 p. |
artikel |