nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A case study on the relationship between neuro-sensory work and work load
|
Keun Sang Park, |
|
1994 |
27 |
1-4 |
p. 393-396 4 p. |
artikel |
2 |
A composite model of macro-economic functioning of China
|
Li Shuxia, |
|
1994 |
27 |
1-4 |
p. 313-316 4 p. |
artikel |
3 |
Adaptive learning networks of multi-stage fuzzy production rules in expert system of grinding characteristics
|
Nagasaka, Kazunori |
|
1994 |
27 |
1-4 |
p. 433-436 4 p. |
artikel |
4 |
Adaptive learning of human motion by a telerobot using a neural network model as a teacher
|
Park, Eui H. |
|
1994 |
27 |
1-4 |
p. 453-456 4 p. |
artikel |
5 |
Adaptive tree-structured self generating radial basis function
|
Watanabe, Masahide |
|
1994 |
27 |
1-4 |
p. 561-564 4 p. |
artikel |
6 |
A decision support system for personnel scheduling in a manufacturing environment
|
Parker, Sandra |
|
1994 |
27 |
1-4 |
p. 185-188 4 p. |
artikel |
7 |
A design for management information system by work-design technique
|
Nose, Toyokazu |
|
1994 |
27 |
1-4 |
p. 151-154 4 p. |
artikel |
8 |
A design taxonomy for eliciting customer requirements
|
Morris, Linda J. |
|
1994 |
27 |
1-4 |
p. 557-560 4 p. |
artikel |
9 |
A genetic algorithm for family and job scheduling in a flowline-based manufacturing cell
|
Sridhar, Jagabandhu |
|
1994 |
27 |
1-4 |
p. 469-472 4 p. |
artikel |
10 |
A knowledge-based expert system for technology acquisition in small and medium scale manufacturing organizations
|
Bayraktar, Demet |
|
1994 |
27 |
1-4 |
p. 285-288 4 p. |
artikel |
11 |
A knowledge-based process planning system for injection mold
|
Lim, J.T. |
|
1994 |
27 |
1-4 |
p. 95-98 4 p. |
artikel |
12 |
All subsets regression using a genetic search algorithm
|
Wasserman, Gary S. |
|
1994 |
27 |
1-4 |
p. 489-492 4 p. |
artikel |
13 |
A machine level based-similarity coefficient for forming manufacturing cells
|
Süer, Gürsel A. |
|
1994 |
27 |
1-4 |
p. 67-70 4 p. |
artikel |
14 |
A macro-logical management approaches
|
Ebukuro, Rinzou |
|
1994 |
27 |
1-4 |
p. 321-326 6 p. |
artikel |
15 |
A man-machine interface model for ergonomic design
|
Kee, Dohyung |
|
1994 |
27 |
1-4 |
p. 365-368 4 p. |
artikel |
16 |
A mathematical model to minimize the inventory and transportation costs in the logistics systems
|
Ahn, Beumjun |
|
1994 |
27 |
1-4 |
p. 229-232 4 p. |
artikel |
17 |
A method for generating nondominated solutions to a multiobjective-headquarters, three-level decentralized system
|
Wang, Zhi-Wei |
|
1994 |
27 |
1-4 |
p. 405-408 4 p. |
artikel |
18 |
A method for maintenance scheduling using GA combined with SA
|
Kim, Hyunchul |
|
1994 |
27 |
1-4 |
p. 477-480 4 p. |
artikel |
19 |
Analysis of a slotted ring model with cambridge type protocol
|
Ando, Kunio |
|
1994 |
27 |
1-4 |
p. 525-528 4 p. |
artikel |
20 |
Analysis of efficiency measures for block diagonal machine-component charts
|
Seifoddini, Hamid |
|
1994 |
27 |
1-4 |
p. 237-240 4 p. |
artikel |
21 |
Analysis of “Salary man” motivation and the will to work (YARUKI)
|
Yokoyama, Hiroshi |
|
1994 |
27 |
1-4 |
p. 373-376 4 p. |
artikel |
22 |
Analytic hierarchy process: It can work for group decision support systems
|
Choi, Hyun-a |
|
1994 |
27 |
1-4 |
p. 167-171 5 p. |
artikel |
23 |
An analysis of catastrophic behavior as a cause of human error
|
Sakai, Y. |
|
1994 |
27 |
1-4 |
p. 377-380 4 p. |
artikel |
24 |
An educational system of the information processing using the database on personal computer
|
Ishihara, Manabu |
|
1994 |
27 |
1-4 |
p. 513-516 4 p. |
artikel |
25 |
An empirical analysis on built-in bias factors of financial accounting system
|
Abe, Masayuki |
|
1994 |
27 |
1-4 |
p. 335-338 4 p. |
artikel |
26 |
An ergonomic assessment of fixed-height, partially adjustable, and fully adjustable VDT workstations by IntelAd
|
Nanthavanij, Suebsak |
|
1994 |
27 |
1-4 |
p. 361-364 4 p. |
artikel |
27 |
A new optimal algorithm for the permutation flow-shop problem and its parallel implementation
|
Okamoto, Shusuke |
|
1994 |
27 |
1-4 |
p. 39-42 4 p. |
artikel |
28 |
An extraction and segmentation of the picture and characters in Korean document
|
Lee, Jong-Kook |
|
1994 |
27 |
1-4 |
p. 529-533 5 p. |
artikel |
29 |
An integration of feature recognition and process planning functions for turning operation
|
Kim, In-Ho |
|
1994 |
27 |
1-4 |
p. 107-110 4 p. |
artikel |
30 |
An optimal boundary for two class-based storage assignment policy in carousel system
|
Hwang, Hark |
|
1994 |
27 |
1-4 |
p. 87-90 4 p. |
artikel |
31 |
A parallel distributed control architecture for multiple robot systems using a network of microcomputers
|
Yasuda, Gen'ichi |
|
1994 |
27 |
1-4 |
p. 63-66 4 p. |
artikel |
32 |
A parallel program for an urban-traffic analization and its evaluation
|
Tsukamoto, Ken-ichi |
|
1994 |
27 |
1-4 |
p. 233-236 4 p. |
artikel |
33 |
Application of neuristor for character detection of spatial pattern
|
Ishizu, Seiji |
|
1994 |
27 |
1-4 |
p. 449-452 4 p. |
artikel |
34 |
Application of optimized production technology in a capacity constrained flow shop: A case study in a battery factory
|
Yenradee, Pisal |
|
1994 |
27 |
1-4 |
p. 217-220 4 p. |
artikel |
35 |
Application of RAMCOST-II simulation model to space suit (kit-inventory) during a mission
|
Park, Eui H. |
|
1994 |
27 |
1-4 |
p. 309-312 4 p. |
artikel |
36 |
Application of statistical inference for partially ordered hypotheses
|
Hoshino, Naoto |
|
1994 |
27 |
1-4 |
p. 35-38 4 p. |
artikel |
37 |
A psychophysical evaluation of interior design alternatives for a high speed train
|
Han, Sung H. |
|
1994 |
27 |
1-4 |
p. 397-400 4 p. |
artikel |
38 |
A scheme for mechanical assembly design and assembly line layout conceptualization
|
Lee, Young-Q |
|
1994 |
27 |
1-4 |
p. 261-264 4 p. |
artikel |
39 |
A sequencing problem for a mixed-model assembly line in a JIT production system
|
Xiaobo, Zhao |
|
1994 |
27 |
1-4 |
p. 71-74 4 p. |
artikel |
40 |
A simulated annealing heuristic for scheduling in a flowshop with bicriteria
|
Gangadharan, Rajesh |
|
1994 |
27 |
1-4 |
p. 473-476 4 p. |
artikel |
41 |
A solution methodolgy for optimal number of machines operated by a single worker
|
Shotaka, Sigeki |
|
1994 |
27 |
1-4 |
p. 55-58 4 p. |
artikel |
42 |
A spreadsheet approach to minimum cost tolerancing for rocket engines
|
Gerth, Richard J. |
|
1994 |
27 |
1-4 |
p. 549-552 4 p. |
artikel |
43 |
A study on a probabilistic two-echelon location system for deteriorating items
|
Hwang, Heung-Suk |
|
1994 |
27 |
1-4 |
p. 241-244 4 p. |
artikel |
44 |
A study on production planning for CIM
|
Nakagiri, Daiju |
|
1994 |
27 |
1-4 |
p. 143-146 4 p. |
artikel |
45 |
A study on sequencing method for the mixed-model assembly line in just-in-time production systems
|
Zhuqi, Xu |
|
1994 |
27 |
1-4 |
p. 225-228 4 p. |
artikel |
46 |
A study on the information organizing technique of DSS
|
Wang Yingluo, |
|
1994 |
27 |
1-4 |
p. 155-159 5 p. |
artikel |
47 |
A synchronization scheme for real and simulated events
|
Kim, S.S. |
|
1994 |
27 |
1-4 |
p. 181-184 4 p. |
artikel |
48 |
A systematic approach to business process reengineering
|
Hahm, Juho |
|
1994 |
27 |
1-4 |
p. 327-330 4 p. |
artikel |
49 |
Author index
|
|
|
1994 |
27 |
1-4 |
p. I-II nvt p. |
artikel |
50 |
Average run lengths of a control chart based on the sum of squared errors
|
Jun, Chi-hyuck |
|
1994 |
27 |
1-4 |
p. 349-352 4 p. |
artikel |
51 |
Capital budgeting model with flexible budget
|
Nam Lee, Byoung |
|
1994 |
27 |
1-4 |
p. 317-320 4 p. |
artikel |
52 |
Case-based decision support system with artificial neural network
|
Renchu Gan, |
|
1994 |
27 |
1-4 |
p. 437-440 4 p. |
artikel |
53 |
CIM — A journey to manufacturing excellence
|
Czajkiewicz, Zbigniew J. |
|
1994 |
27 |
1-4 |
p. 91-93 3 p. |
artikel |
54 |
Comparison of a full factorial experiment to fractional and taguchi designs in a lathe dry turning operation
|
Youssef, Youssef A. |
|
1994 |
27 |
1-4 |
p. 59-62 4 p. |
artikel |
55 |
Complex random sample scheduling and its application to an N/M/F/F max problem
|
Morizawa, Kazuko |
|
1994 |
27 |
1-4 |
p. 23-26 4 p. |
artikel |
56 |
Computation of quasi-stationary distributions in Markovian queues
|
Kijima, Masaaki |
|
1994 |
27 |
1-4 |
p. 429-432 4 p. |
artikel |
57 |
Computers and industrial engineering education
|
Oh, Keytack H. |
|
1994 |
27 |
1-4 |
p. 517-520 4 p. |
artikel |
58 |
Computer supported environment for common exploitation of personal information
|
Furugori, Nobuko |
|
1994 |
27 |
1-4 |
p. 189-192 4 p. |
artikel |
59 |
Concept and model experiments on automatic shoveling of rocks from the rock piles
|
Takahashi, Hiroshi |
|
1994 |
27 |
1-4 |
p. 43-46 4 p. |
artikel |
60 |
Conceptual design of a shop floor control system from IDEF0
|
Gong, Dah-Chuan |
|
1994 |
27 |
1-4 |
p. 119-122 4 p. |
artikel |
61 |
Conceptual framework for automated process planning
|
Moo Young Jung, |
|
1994 |
27 |
1-4 |
p. 115-118 4 p. |
artikel |
62 |
Conflict resolution - simulation language
|
Hosni, Yasser A. |
|
1994 |
27 |
1-4 |
p. 289-291 3 p. |
artikel |
63 |
Crossover on intensive search and traveling salesman problem
|
Cheng, Runwei |
|
1994 |
27 |
1-4 |
p. 485-488 4 p. |
artikel |
64 |
Decision making support system for house purchase by using fuzzy logic
|
Masui, Shigehiro |
|
1994 |
27 |
1-4 |
p. 281-284 4 p. |
artikel |
65 |
Design and implementation of a feature-based automated process planning (FBAPP) system
|
Dong, Jian(John) |
|
1994 |
27 |
1-4 |
p. 1-4 4 p. |
artikel |
66 |
Design of a coating system using SIMAN: a case study
|
Kim, Young-Jo |
|
1994 |
27 |
1-4 |
p. 111-114 4 p. |
artikel |
67 |
Design of a computerized scheduling system for best rule analysis and control
|
Kim, Ill-Soo |
|
1994 |
27 |
1-4 |
p. 27-30 4 p. |
artikel |
68 |
Determining the number of Kanbans for unbalanced serial production systems
|
Takahashi, Katsuhiko |
|
1994 |
27 |
1-4 |
p. 213-216 4 p. |
artikel |
69 |
Developing a generic FMS for small to medium size industries of Korea
|
Kim, J.M. |
|
1994 |
27 |
1-4 |
p. 51-54 4 p. |
artikel |
70 |
Development of a CAD-based intelligent manufacturing system
|
Li, Feng |
|
1994 |
27 |
1-4 |
p. 135-138 4 p. |
artikel |
71 |
3-Dimensional graphic image representation of holographic microscopical displacement pattern by using cubic spline function
|
Taniguchi, Masanari |
|
1994 |
27 |
1-4 |
p. 293-296 4 p. |
artikel |
72 |
Duopoly model of a congested markets
|
Oh, Hyung-Sik |
|
1994 |
27 |
1-4 |
p. 509-512 4 p. |
artikel |
73 |
Editorial Board
|
|
|
1994 |
27 |
1-4 |
p. IFC- 1 p. |
artikel |
74 |
Evolution program for bicriteria transportation problem
|
Yang, Xiaofeng |
|
1994 |
27 |
1-4 |
p. 481-484 4 p. |
artikel |
75 |
Experience-based vehicle operation
|
Sakai, Y. |
|
1994 |
27 |
1-4 |
p. 277-280 4 p. |
artikel |
76 |
Expert preference system Computer assisted system for developing expert utility functions
|
Oh, Keytack H. |
|
1994 |
27 |
1-4 |
p. 273-276 4 p. |
artikel |
77 |
Failure analysis of computer system based on fuzzy queueing theory
|
Jo, Jung Bok |
|
1994 |
27 |
1-4 |
p. 425-428 4 p. |
artikel |
78 |
FMS tool change schemes and their characteristics
|
Kayayama, Hiroshi |
|
1994 |
27 |
1-4 |
p. 75-80 6 p. |
artikel |
79 |
Focused management in military organizations: An avenue for future industrial engineering
|
Ronen, Boaz |
|
1994 |
27 |
1-4 |
p. 543-544 2 p. |
artikel |
80 |
Formalizing computational river networks
|
Shilong Ma, |
|
1994 |
27 |
1-4 |
p. 545-548 4 p. |
artikel |
81 |
Formulation and analysis of fuzzy linear programming problems by user oriented ranking criteria
|
Nakahara, Yozo |
|
1994 |
27 |
1-4 |
p. 457-460 4 p. |
artikel |
82 |
Functional Specification of a Dynamic Process Planning System
|
Ssemakula, Mukasa E. |
|
1994 |
27 |
1-4 |
p. 99-102 4 p. |
artikel |
83 |
Fuzzy shortest path problem
|
Okada, Shinkoh |
|
1994 |
27 |
1-4 |
p. 465-468 4 p. |
artikel |
84 |
Heuristic approach to allocation of trucks in a transportation system
|
Takeno, Takeo |
|
1994 |
27 |
1-4 |
p. 253-255 3 p. |
artikel |
85 |
Hierarchical representation for program control-structures by rewriting of flow graphs
|
Hattori, Norihide |
|
1994 |
27 |
1-4 |
p. 521-524 4 p. |
artikel |
86 |
Highway transportation comprehensive evaluation
|
Wan Weiwu, |
|
1994 |
27 |
1-4 |
p. 257-259 3 p. |
artikel |
87 |
How a leading heavy industries co., ltd in Korea implements JIT philosophy to its operations
|
Su, Kang Duk |
|
1994 |
27 |
1-4 |
p. 5-9 5 p. |
artikel |
88 |
Implementation of a case-based production scheduling system in C language
|
Dong, Yanwen |
|
1994 |
27 |
1-4 |
p. 265-268 4 p. |
artikel |
89 |
Improvement on the computational efficiency of inverse queueing network analysis
|
Kuroda, Mitsuru |
|
1994 |
27 |
1-4 |
p. 421-424 4 p. |
artikel |
90 |
Individual differences on diurnal variations of the task performance
|
Arakawa, Kazushige |
|
1994 |
27 |
1-4 |
p. 389-392 4 p. |
artikel |
91 |
Inductive generation of combination operations for form feature recognition using convex decomposition
|
Wang, Eric |
|
1994 |
27 |
1-4 |
p. 123-126 4 p. |
artikel |
92 |
Integration architecture of expert systems, neural networks, hypertext, and multimedia can provide competitive opportunities for industrial applications
|
Parkinson, Edward L. |
|
1994 |
27 |
1-4 |
p. 269-272 4 p. |
artikel |
93 |
Intelligential industrial management
|
Osaki, Hirokazu |
|
1994 |
27 |
1-4 |
p. 331-334 4 p. |
artikel |
94 |
Intelligent knowledge based expert inventory control system for computer integrated manufacturing
|
Ajmal, A. |
|
1994 |
27 |
1-4 |
p. 173-176 4 p. |
artikel |
95 |
Intelligent optimization method for large-scale systems with fuzzy parameters
|
Long-zhu Li, |
|
1994 |
27 |
1-4 |
p. 461-464 4 p. |
artikel |
96 |
Intelligent scheduling in the manufacturing environment
|
Ehlers, Elizabeth M. |
|
1994 |
27 |
1-4 |
p. 31-34 4 p. |
artikel |
97 |
Markov decision process: Fuzzy approach
|
Chang Eun Kim, |
|
1994 |
27 |
1-4 |
p. 161-165 5 p. |
artikel |
98 |
Mathematical programming for the scheduling problem with alternate process plans in FMS
|
Jiang, Juichin |
|
1994 |
27 |
1-4 |
p. 15-18 4 p. |
artikel |
99 |
Model-based manufacturing integration: A paradigm for virtual manufacturing systems engineering
|
Parks, Charles M. |
|
1994 |
27 |
1-4 |
p. 357-360 4 p. |
artikel |
100 |
Modeling and analysis of reliability performance for a distributed dual-processor system
|
Jin, Qun |
|
1994 |
27 |
1-4 |
p. 497-500 4 p. |
artikel |
101 |
Modeling an international co-operative global complementary production system
|
Hiraki, Shusaku |
|
1994 |
27 |
1-4 |
p. 205-208 4 p. |
artikel |
102 |
Modeling of AGV networks in flexible manufacturing systems
|
Shiizuka, Hisao |
|
1994 |
27 |
1-4 |
p. 81-86 6 p. |
artikel |
103 |
Modeling using regularity criterion based constructed neural networks
|
Bastian, Andreas |
|
1994 |
27 |
1-4 |
p. 441-444 4 p. |
artikel |
104 |
Multi-echelon inventory production system solution
|
Odanaka, Toshio |
|
1994 |
27 |
1-4 |
p. 201-204 4 p. |
artikel |
105 |
Nonsymmetric streamlined extrusion dies through computer aided engineering
|
Rao, K.P. |
|
1994 |
27 |
1-4 |
p. 103-106 4 p. |
artikel |
106 |
Numerous date in hierarchy for knowledge concentrated in decision tree
|
You, Noritomi |
|
1994 |
27 |
1-4 |
p. 535-538 4 p. |
artikel |
107 |
On a measurement method of configuration factor distributions with the help of an electronic still camera and a personal computer
|
Yamaya, Tetsuo |
|
1994 |
27 |
1-4 |
p. 305-308 4 p. |
artikel |
108 |
On pulse analysis of GX/G/∞ queues in tandem with correlated service times
|
Sumita, Ushio |
|
1994 |
27 |
1-4 |
p. 413-416 4 p. |
artikel |
109 |
On the mean random inconsistency index of analytic hierarchy process (AHP)
|
Rao Tummala, V.M. |
|
1994 |
27 |
1-4 |
p. 401-404 4 p. |
artikel |
110 |
Optimal minimal-repair and replacement problem of discrete-time Markovian deterioration system under incomplete state information
|
Ohnishi, Masamitsu |
|
1994 |
27 |
1-4 |
p. 409-412 4 p. |
artikel |
111 |
Optimal order limit policy under cost effectiveness criterion
|
Dohi, Tadashi |
|
1994 |
27 |
1-4 |
p. 197-200 4 p. |
artikel |
112 |
Optimal product-planning for new multiattribute products based on conjoint analysis
|
Yoo, Dong-il |
|
1994 |
27 |
1-4 |
p. 11-14 4 p. |
artikel |
113 |
Optimal selection of sampling locations and c-chart parameters
|
Lapinski, K.A. |
|
1994 |
27 |
1-4 |
p. 297-300 4 p. |
artikel |
114 |
Optimizing robot's service movement in a robot-centered FMC
|
Park, Yang-Byung |
|
1994 |
27 |
1-4 |
p. 47-50 4 p. |
artikel |
115 |
PASIM: A spreadsheet-based decision support system for performance analysis of production workers
|
Ntuen, Celestine A. |
|
1994 |
27 |
1-4 |
p. 193-196 4 p. |
artikel |
116 |
Petri net application in flexible process planning
|
Lee, KyungHuy |
|
1994 |
27 |
1-4 |
p. 505-508 4 p. |
artikel |
117 |
Predicting japanese corporate bankruptcy in terms of financial data using neural network
|
Tsukuda, Junsei |
|
1994 |
27 |
1-4 |
p. 445-448 4 p. |
artikel |
118 |
Prediction of human reach posture using a neural network for ergonomic man models
|
Jung, Eui S. |
|
1994 |
27 |
1-4 |
p. 369-372 4 p. |
artikel |
119 |
Preface
|
Gen, Mitsuo |
|
1994 |
27 |
1-4 |
p. xiii-xiv nvt p. |
artikel |
120 |
Problems in CIM implementation: A case study of nine CIM firms
|
Morris, John S. |
|
1994 |
27 |
1-4 |
p. 147-150 4 p. |
artikel |
121 |
Random number generator for the Birnbaum-Saunders distribution
|
Chang, Dong Shang |
|
1994 |
27 |
1-4 |
p. 345-348 4 p. |
artikel |
122 |
Reliability analysis for a two-echelon repair system considering lateral resupply, return policy and transportation times
|
Yanagi, Shigeru |
|
1994 |
27 |
1-4 |
p. 493-496 4 p. |
artikel |
123 |
Reliability of a controllable M/M/2 system with warm standbys operating under the triadic (0, Q, N, M) policy
|
Kuo-Hsiung Wang, |
|
1994 |
27 |
1-4 |
p. 417-420 4 p. |
artikel |
124 |
Required setup reductions in JIT driven MRP systems
|
Mirza, Muhammad Asim |
|
1994 |
27 |
1-4 |
p. 221-224 4 p. |
artikel |
125 |
Short run spc using dynamic control chart
|
Wasserman, Gary S. |
|
1994 |
27 |
1-4 |
p. 353-356 4 p. |
artikel |
126 |
Simulation of luminous environment in interior with windows by personal-computer
|
Oki, Masato |
|
1994 |
27 |
1-4 |
p. 301-304 4 p. |
artikel |
127 |
Sleep package model mathematical model for a sleep pattern
|
Kobayashi, Toshinori |
|
1994 |
27 |
1-4 |
p. 385-388 4 p. |
artikel |
128 |
Software for dynamic reconfigurable order picking systems
|
Landers, Thomas L. |
|
1994 |
27 |
1-4 |
p. 245-248 4 p. |
artikel |
129 |
Some dynamic measures for the economic worth of an investment
|
Park, Choon Yup |
|
1994 |
27 |
1-4 |
p. 553-556 4 p. |
artikel |
130 |
Stochastic Petri Net model of distributed process system with repair and its behavior analysis
|
Sugasawa, Yoshio |
|
1994 |
27 |
1-4 |
p. 501-504 4 p. |
artikel |
131 |
Strategic planning for CIM to enhance the competitive ability
|
Yura, Kenji |
|
1994 |
27 |
1-4 |
p. 127-130 4 p. |
artikel |
132 |
Study of individual differences in ERP by multivariate analysis of a few single trial ERPs
|
Saito, Y. |
|
1994 |
27 |
1-4 |
p. 381-384 4 p. |
artikel |
133 |
Study on the production planning of apparel products: Determining optimal production times and quantities
|
Ishikura, Hiroki |
|
1994 |
27 |
1-4 |
p. 19-22 4 p. |
artikel |
134 |
The changing manufacturing organization with CIM
|
Liwen Liu, |
|
1994 |
27 |
1-4 |
p. 131-134 4 p. |
artikel |
135 |
The development of decision support systems in China
|
Chi-Fa Ku, |
|
1994 |
27 |
1-4 |
p. 177-180 4 p. |
artikel |
136 |
The distribution free continuous review inventory system with a service level constraint
|
Moon, Ilkyeong |
|
1994 |
27 |
1-4 |
p. 209-212 4 p. |
artikel |
137 |
The effectiveness of system integration in CIMS of Japanese companies
|
Ichimura, Takaya |
|
1994 |
27 |
1-4 |
p. 139-142 4 p. |
artikel |
138 |
The establishment of standard time in die manufacturing process using standard data
|
Kang, Kyung-Sik |
|
1994 |
27 |
1-4 |
p. 539-542 4 p. |
artikel |
139 |
The evaluation of air transportation network based on multiple criteria
|
Ceha, Rakhmat |
|
1994 |
27 |
1-4 |
p. 249-252 4 p. |
artikel |
140 |
Use of the dirichlet process for reliability analysis
|
Kary Chien, Wei-Ting |
|
1994 |
27 |
1-4 |
p. 339-343 5 p. |
artikel |