nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A castability expert system
|
Kadidal, Mahendra |
|
1993 |
25 |
1-4 |
p. 99-102 4 p. |
artikel |
2 |
A computer-based method for recording three-dimensional body postures
|
Woldstad, Jeffrey C. |
|
1993 |
25 |
1-4 |
p. 405-407 3 p. |
artikel |
3 |
Active database and its utilization in the object oriented environment
|
Naquin, Bert |
|
1993 |
25 |
1-4 |
p. 313-316 4 p. |
artikel |
4 |
A decision support system for evaluating intangible investments
|
Kivijärvi, Hannu |
|
1993 |
25 |
1-4 |
p. 353-356 4 p. |
artikel |
5 |
A delay model of queueing network system based on fuzzy sets theory
|
Jo, Jung Bok |
|
1993 |
25 |
1-4 |
p. 143-146 4 p. |
artikel |
6 |
A De Novo approach for bicriteria 0–1 linear programming with interval coefficients under gub structure
|
Kim, Hyunchul |
|
1993 |
25 |
1-4 |
p. 17-20 4 p. |
artikel |
7 |
A dynamic part assignment procedure in machine cell formation
|
Seifoddini, Hamid |
|
1993 |
25 |
1-4 |
p. 473-476 4 p. |
artikel |
8 |
A fuzzy set theoretic framework for knowledge-based simulation
|
Rogers, Steven Hill |
|
1993 |
25 |
1-4 |
p. 119-122 4 p. |
artikel |
9 |
A heuristic program for reliability and maintainability allocation in complex hierachical systems
|
Ntuen, Celestine A. |
|
1993 |
25 |
1-4 |
p. 345-348 4 p. |
artikel |
10 |
A knowledge based aircraft-gate assignment advisor
|
Su, Y.Y. |
|
1993 |
25 |
1-4 |
p. 123-126 4 p. |
artikel |
11 |
A knowledge update mechanism for an adhesive advisor
|
Su, Y.Y. |
|
1993 |
25 |
1-4 |
p. 111-114 4 p. |
artikel |
12 |
A method for solving linear programming problems with triangular fuzzy coefficients using new ranking index
|
Nakahara, Yozo |
|
1993 |
25 |
1-4 |
p. 1-4 4 p. |
artikel |
13 |
A methodology for the evaluation of integrated manufacturing systems
|
Taylor, R.Bruce |
|
1993 |
25 |
1-4 |
p. 337-340 4 p. |
artikel |
14 |
A metric for consensus — Design and calibration
|
Harvey, Aubrey E. |
|
1993 |
25 |
1-4 |
p. 179-182 4 p. |
artikel |
15 |
A microcomputer-based scheduling assist system
|
Driscoll, Wade C. |
|
1993 |
25 |
1-4 |
p. 223-226 4 p. |
artikel |
16 |
A model to manage a large number of transactions: a case study
|
Gagliardi, Marco |
|
1993 |
25 |
1-4 |
p. 287-290 4 p. |
artikel |
17 |
A multi-criteria decision analysis methodology for selection of a preferred residence based on physical attributes
|
Hoepfner, George K. |
|
1993 |
25 |
1-4 |
p. 365-368 4 p. |
artikel |
18 |
Analysis of two stage sampling plan with imperfect inspection
|
Fard, Nasser S. |
|
1993 |
25 |
1-4 |
p. 453-456 4 p. |
artikel |
19 |
Analytic and empirical assessment models of on-line inspection technologies
|
Remski, Robert M. |
|
1993 |
25 |
1-4 |
p. 439-443 5 p. |
artikel |
20 |
An artificial neural network case study: Prediction versus classification in a manufacturing application
|
Sieger, David B. |
|
1993 |
25 |
1-4 |
p. 381-384 4 p. |
artikel |
21 |
An automated coding and classification system with supporting database for effective design of integrated manufacturing systems
|
Agarwal, Munish |
|
1993 |
25 |
1-4 |
p. 495-498 4 p. |
artikel |
22 |
An effective heuristic for flow shop problems with total flow time as criterion
|
Vempati, Venkateswara S. |
|
1993 |
25 |
1-4 |
p. 219-222 4 p. |
artikel |
23 |
An effective method for solving flow shop scheduling problems with fuzzy processing times
|
Tsujimura, Yasuhiro |
|
1993 |
25 |
1-4 |
p. 239-242 4 p. |
artikel |
24 |
An efficient technique for integrating voice and data in wireless communications with a cellular structured environment
|
Archibong, Godfrey I. |
|
1993 |
25 |
1-4 |
p. 159-162 4 p. |
artikel |
25 |
An electronic performance support system for organizational learning
|
Williams, Kent E. |
|
1993 |
25 |
1-4 |
p. 93-97 5 p. |
artikel |
26 |
A neural network approach to multiple-objective cutting parameter optimization based on fuzzy preference information
|
Wang, Jun |
|
1993 |
25 |
1-4 |
p. 389-392 4 p. |
artikel |
27 |
A new approach to modeling human response errors in synthetic flight simulation domain
|
Ntuen, Celestine A. |
|
1993 |
25 |
1-4 |
p. 171-174 4 p. |
artikel |
28 |
An examination of the human factors support of NASA's safety directorate on the Space Station Processing Facility (SSPF) Kennedy space center, Florida
|
Lindner, H.Greig |
|
1993 |
25 |
1-4 |
p. 413-417 5 p. |
artikel |
29 |
An extension of interactive method for solving multiple objective linear programming with fuzzy parameters
|
Sasaki, Masato |
|
1993 |
25 |
1-4 |
p. 9-12 4 p. |
artikel |
30 |
An integrated simulation model development environment for SLAM II using object-oriented paradigm
|
Gupta, Tarun |
|
1993 |
25 |
1-4 |
p. 569-572 4 p. |
artikel |
31 |
An interactive computer training programming for industry
|
Asfahl, C.Ray |
|
1993 |
25 |
1-4 |
p. 57-60 4 p. |
artikel |
32 |
An interdisciplinary laboratory for manufacturing education
|
Ram, Bala |
|
1993 |
25 |
1-4 |
p. 61-64 4 p. |
artikel |
33 |
An iterative procedure for lot streaming in job-shop scheduling
|
Dauzere-Peres, Stephane |
|
1993 |
25 |
1-4 |
p. 231-234 4 p. |
artikel |
34 |
An object-oriented approach to product modeling for manufacturing systems
|
Usher, John M. |
|
1993 |
25 |
1-4 |
p. 557-560 4 p. |
artikel |
35 |
An object-oriented DSS for strategic management
|
Waxlax, Joakim |
|
1993 |
25 |
1-4 |
p. 573-576 4 p. |
artikel |
36 |
An object-oriented modeling framework for sawmill simulation
|
Randhawa, Sabah U. |
|
1993 |
25 |
1-4 |
p. 565-568 4 p. |
artikel |
37 |
A novel congestion control strategy in ATM networks
|
Bemmel, Vincent |
|
1993 |
25 |
1-4 |
p. 549-552 4 p. |
artikel |
38 |
Application of outranking methods to economic and financial justificaton of CIM systems
|
Parsaei, Hamid R. |
|
1993 |
25 |
1-4 |
p. 357-360 4 p. |
artikel |
39 |
Application of reliability concepts in automatic identification
|
Quirogal, Luis A. |
|
1993 |
25 |
1-4 |
p. 465-468 4 p. |
artikel |
40 |
A proposed testbed for evaluating adaptive routing algorithms
|
West, Susan M. |
|
1993 |
25 |
1-4 |
p. 167-170 4 p. |
artikel |
41 |
Artificial neural networks for flexible manufacturing systems scheduling
|
Toure, Serge |
|
1993 |
25 |
1-4 |
p. 385-388 4 p. |
artikel |
42 |
A simulation study comparing GT vs. job shop manufacturing systems
|
Gupta, Tarun |
|
1993 |
25 |
1-4 |
p. 195-198 4 p. |
artikel |
43 |
A simulation study of bursty data traffic with hybrid source smoothing in an ATM node
|
Hsu, Sam |
|
1993 |
25 |
1-4 |
p. 151-154 4 p. |
artikel |
44 |
A specification technique for generating and simulating supervisory control
|
Roberts, Chell A. |
|
1993 |
25 |
1-4 |
p. 515-518 4 p. |
artikel |
45 |
A survey of design methods for manufacturing cells
|
Kamrani, Ali K. |
|
1993 |
25 |
1-4 |
p. 487-490 4 p. |
artikel |
46 |
Automated path planning for face milling of N-sided convex polygonal surfaces using staircasing strategy
|
Kompalli, Chandra |
|
1993 |
25 |
1-4 |
p. 283-286 4 p. |
artikel |
47 |
Automatic reintegration of previously machined materials
|
Coates, Eyler |
|
1993 |
25 |
1-4 |
p. 127-130 4 p. |
artikel |
48 |
Back propagation artificial neural networks for the analysis of quality control charts
|
Velasco, Tomas |
|
1993 |
25 |
1-4 |
p. 397-400 4 p. |
artikel |
49 |
Cell loading in cellular manufacturing systems
|
Süer, Gürsel A. |
|
1993 |
25 |
1-4 |
p. 247-250 4 p. |
artikel |
50 |
Cellular manufacturing system design with alternative routing consideration
|
Sundaram, R.Meenakshi |
|
1993 |
25 |
1-4 |
p. 477-480 4 p. |
artikel |
51 |
Combining ergonomics and work measurement for job analysis
|
Wygant, Robert M. |
|
1993 |
25 |
1-4 |
p. 423-426 4 p. |
artikel |
52 |
Common random numbers and multinomial selection
|
Mata, Fernando |
|
1993 |
25 |
1-4 |
p. 33-36 4 p. |
artikel |
53 |
Computer-aided tool selection for turning and boring
|
Dhage, Sunil |
|
1993 |
25 |
1-4 |
p. 207-210 4 p. |
artikel |
54 |
Computerized continuous sampling plans with finite production
|
Liu, Ming C. |
|
1993 |
25 |
1-4 |
p. 445-448 4 p. |
artikel |
55 |
Computers and industrial engineering courses: A winning combination
|
Drolet, Jocelyn |
|
1993 |
25 |
1-4 |
p. 45-48 4 p. |
artikel |
56 |
Concept mapping as a knowledge acquisition tool in the development of a fuzzy rule-based expert system
|
Bell, Pamela McCauley |
|
1993 |
25 |
1-4 |
p. 115-118 4 p. |
artikel |
57 |
Confidence bounds of the Weibull failure rate
|
Chang, Dong Shang |
|
1993 |
25 |
1-4 |
p. 5-8 4 p. |
artikel |
58 |
Control rules for tool sharing in flexible manufacturing systems
|
Kashyap, Arun S. |
|
1993 |
25 |
1-4 |
p. 507-510 4 p. |
artikel |
59 |
Critically indexing for job/task improvement at the Kennedy space center
|
Jackson, Andrew E. |
|
1993 |
25 |
1-4 |
p. 303-306 4 p. |
artikel |
60 |
Customized job shop scheduling application development
|
Thelen, Richard A. |
|
1993 |
25 |
1-4 |
p. 215-218 4 p. |
artikel |
61 |
Design and implementation of a relational data base for automated process planning
|
Shooshtarian, Farah D. |
|
1993 |
25 |
1-4 |
p. 309-312 4 p. |
artikel |
62 |
Detecting credit card fraud using expert systems
|
Leonard, Kevin J. |
|
1993 |
25 |
1-4 |
p. 103-106 4 p. |
artikel |
63 |
Determination of minimum three-dimensional cutting-tool paths in the presence of barriers
|
Williams, Robert L. |
|
1993 |
25 |
1-4 |
p. 211-214 4 p. |
artikel |
64 |
Development of a logical deductive fault diagnostic technique for real time application
|
Arfi, Tanvir |
|
1993 |
25 |
1-4 |
p. 279-282 4 p. |
artikel |
65 |
Development of an expert system for scheduling work content in a job shop environment
|
Ress, David A. |
|
1993 |
25 |
1-4 |
p. 131-134 4 p. |
artikel |
66 |
Development of a robust CIM laboratory environment using multi-criteria goal setting and evaluation
|
Taylor, R.Bruce |
|
1993 |
25 |
1-4 |
p. 523-526 4 p. |
artikel |
67 |
Development of a strategic research plan for an academic department through the use of quality function deployment
|
Chen, Chuen-lung |
|
1993 |
25 |
1-4 |
p. 49-52 4 p. |
artikel |
68 |
Development of decision support knowledge based system for tool wear diagnosis
|
Arfi, Tanvir |
|
1993 |
25 |
1-4 |
p. 361-364 4 p. |
artikel |
69 |
Distributed object management integrating distributed information in heterogeneous environment
|
Ranganathan, Vidya Sagar |
|
1993 |
25 |
1-4 |
p. 317-320 4 p. |
artikel |
70 |
Dynamic data systems models for predicting the load demand
|
Moreb, Ahmed A. |
|
1993 |
25 |
1-4 |
p. 291-294 4 p. |
artikel |
71 |
Editorial Board
|
|
|
1993 |
25 |
1-4 |
p. IFC- 1 p. |
artikel |
72 |
Effect of machining time in the duplication process of machine cells formation
|
Logendran, Rasaratnam |
|
1993 |
25 |
1-4 |
p. 29-32 4 p. |
artikel |
73 |
Effects of daytime activities on sleep qualities
|
Kobayashi, Toshinori |
|
1993 |
25 |
1-4 |
p. 431-434 4 p. |
artikel |
74 |
Effects of favorite and unfavorable odor stimulus on ERP components
|
Saito, Yasuhiko |
|
1993 |
25 |
1-4 |
p. 427-430 4 p. |
artikel |
75 |
Electronic Data Interchange (EDI)/Electronic Graphics Interchange (EGI) and bar codes: Fundamental components of your world-class manufacturing enterprise
|
Udoka, Silvanus J. |
|
1993 |
25 |
1-4 |
p. 139-142 4 p. |
artikel |
76 |
Engine system diagnosis using vibration data
|
Lai, Steven H.-Y. |
|
1993 |
25 |
1-4 |
p. 135-138 4 p. |
artikel |
77 |
Enhancing computer aided inspection through the integration of quality control and computer aided design
|
Hooks, Kevin |
|
1993 |
25 |
1-4 |
p. 511-514 4 p. |
artikel |
78 |
Ergonomic analysis of lifting tasks using computerized cinematography
|
White, Bob |
|
1993 |
25 |
1-4 |
p. 409-412 4 p. |
artikel |
79 |
Evaluation of alternative materials handling systems
|
West, Thomas M. |
|
1993 |
25 |
1-4 |
p. 187-190 4 p. |
artikel |
80 |
Exact and approximate solutions of the container ship stowage problem
|
Avriel, Mordecai |
|
1993 |
25 |
1-4 |
p. 271-274 4 p. |
artikel |
81 |
Finding the most vital edge with respect to K-terminal reliability in series-parallel networks
|
Wang, Peng-Fei |
|
1993 |
25 |
1-4 |
p. 457-460 4 p. |
artikel |
82 |
Forecasting methods for industry and business
|
Wu, Chao-Yen |
|
1993 |
25 |
1-4 |
p. 73-76 4 p. |
artikel |
83 |
Forecasting the consumption of gasoline in the U.S.
|
Morrison, Kenneth R. |
|
1993 |
25 |
1-4 |
p. 163-166 4 p. |
artikel |
84 |
Fuzzy logic controller design for spacecraft proximity operations
|
Lai, Steven H.-Y. |
|
1993 |
25 |
1-4 |
p. 13-16 4 p. |
artikel |
85 |
Genetic neuro-scheduler for job shop scheduling
|
Dagli, Cihan |
|
1993 |
25 |
1-4 |
p. 267-270 4 p. |
artikel |
86 |
Geographic information system based decision support systems for facility location, routing, and scheduling
|
Kolli, S.S. |
|
1993 |
25 |
1-4 |
p. 369-372 4 p. |
artikel |
87 |
Heuristic algorithms for solving earliness-tardiness scheduling problems with machine vacations
|
Mannur, Narasimha R. |
|
1993 |
25 |
1-4 |
p. 255-258 4 p. |
artikel |
88 |
Information process flow analysis (IPFA) for reengineering manufacturing systems
|
Manley, John H. |
|
1993 |
25 |
1-4 |
p. 275-278 4 p. |
artikel |
89 |
Integrated order release and scheduling for embedded flexible manufacturing systems
|
Hansmann, Karl-Werner |
|
1993 |
25 |
1-4 |
p. 491-494 4 p. |
artikel |
90 |
Integrating user needs by computer-supported interpretation of concept maps
|
Gomes, Marie E. |
|
1993 |
25 |
1-4 |
p. 577-579 3 p. |
artikel |
91 |
Integration of simulation modeling and computer aided production management in computer integrated enterprise
|
Persentili, Emine |
|
1993 |
25 |
1-4 |
p. 191-194 4 p. |
artikel |
92 |
Intelligent concurrent engineering environment
|
Krishnaswamy, Ganesh M. |
|
1993 |
25 |
1-4 |
p. 321-324 4 p. |
artikel |
93 |
Justification of new technologies through the use of “cause and effect” analysis: Case of tile replacement at Kennedy space center
|
Hosni, Yasser |
|
1993 |
25 |
1-4 |
p. 69-72 4 p. |
artikel |
94 |
KBDA — A knowledge based design system for assembly
|
Lai, Steven H.-Y. |
|
1993 |
25 |
1-4 |
p. 585-588 4 p. |
artikel |
95 |
Knowledge-based approach to quality control assurance using bar code identification systems
|
Nadeem, Mohammed |
|
1993 |
25 |
1-4 |
p. 41-44 4 p. |
artikel |
96 |
Logistic Planning and Control Systems (LPCS) — Fundamentals and future directions
|
Cowdrick, Robert M. |
|
1993 |
25 |
1-4 |
p. 537-540 4 p. |
artikel |
97 |
Manufacturing enterprise integration using hierarchial control and distributed database
|
Kamrani, Ali K. |
|
1993 |
25 |
1-4 |
p. 581-584 4 p. |
artikel |
98 |
Manufacturing features extraction and recognition in automated process planning
|
Dong, Jian (John) |
|
1993 |
25 |
1-4 |
p. 325-328 4 p. |
artikel |
99 |
Measurement of seating comfort
|
Motavalli, Saeid |
|
1993 |
25 |
1-4 |
p. 419-422 4 p. |
artikel |
100 |
Minimizing the number of tardy jobs in identical machine scheduling
|
Süer, Gürsel A. |
|
1993 |
25 |
1-4 |
p. 243-246 4 p. |
artikel |
101 |
Modeling, controlling, and simulation of local area networks for flexible manufacturing systems using Petri nets
|
Venkatesh, Kurapati |
|
1993 |
25 |
1-4 |
p. 155-158 4 p. |
artikel |
102 |
Modification of CAPP systems for CAPP/scheduling integration
|
Liao, T.W. |
|
1993 |
25 |
1-4 |
p. 203-206 4 p. |
artikel |
103 |
Multicriteria evaluation of the design/build process
|
West, Thomas M. |
|
1993 |
25 |
1-4 |
p. 329-332 4 p. |
artikel |
104 |
Multicriteria models for analysis of the environmental restoration and waste management program
|
Moore, Laurence J. |
|
1993 |
25 |
1-4 |
p. 21-24 4 p. |
artikel |
105 |
Network-level pavement management system in Finland—An optimization tool for improved roadkeeping
|
Kanto, Antti J. |
|
1993 |
25 |
1-4 |
p. 341-343 3 p. |
artikel |
106 |
Neural network applications for scheduling jobs on parallel machines
|
Lee, Young-Hoon |
|
1993 |
25 |
1-4 |
p. 227-230 4 p. |
artikel |
107 |
Neural network performance on the bankruptcy classification problem
|
Udo, Godwin |
|
1993 |
25 |
1-4 |
p. 377-380 4 p. |
artikel |
108 |
Object oriented random number generators
|
Fisher, Joseph A. |
|
1993 |
25 |
1-4 |
p. 561-563 3 p. |
artikel |
109 |
On some factors affecting the just-in-time production system output variability: A simulation study using Taguchi technique
|
Abdul-Nour, Georges |
|
1993 |
25 |
1-4 |
p. 461-464 4 p. |
artikel |
110 |
Operational control of multi-load vehicles in an automated guided vehicle system
|
Nayyar, Pranab |
|
1993 |
25 |
1-4 |
p. 503-506 4 p. |
artikel |
111 |
Optimal allocation of students to different departments in an engineering college
|
Bafail, Abdullah O. |
|
1993 |
25 |
1-4 |
p. 295-298 4 p. |
artikel |
112 |
Optimization of average-run-length properties of control charts using recurrent events
|
Artiles-León, Noel |
|
1993 |
25 |
1-4 |
p. 449-452 4 p. |
artikel |
113 |
Order relation between intervals and its application to shortest path problem
|
Okada, Shinkoh |
|
1993 |
25 |
1-4 |
p. 147-150 4 p. |
artikel |
114 |
Part selection, machine loading, and machining speed selection in flexible manufacturing systems
|
Liang, Ming |
|
1993 |
25 |
1-4 |
p. 259-262 4 p. |
artikel |
115 |
Pattern classification via linear programming
|
Baek, Wonjang |
|
1993 |
25 |
1-4 |
p. 393-396 4 p. |
artikel |
116 |
Performance analysis of the cellular manufacturing systems a decision support tool
|
Kamrani, A.K. |
|
1993 |
25 |
1-4 |
p. 499-502 4 p. |
artikel |
117 |
Performance comparison of two-dimensional clustering algorithms in group technology
|
Choi, Hoo-Gon |
|
1993 |
25 |
1-4 |
p. 199-202 4 p. |
artikel |
118 |
Performance - reliability - models and quality management
|
Fischer, Klaus |
|
1993 |
25 |
1-4 |
p. 469-472 4 p. |
artikel |
119 |
Pollution prevention decision support system
|
Ristroph, John H. |
|
1993 |
25 |
1-4 |
p. 349-352 4 p. |
artikel |
120 |
Principal component analysis: A tool for assembly management
|
Tadayon, Farhad |
|
1993 |
25 |
1-4 |
p. 77-80 4 p. |
artikel |
121 |
Production management of a steel manufacturing system: A hierarchical planning model
|
Nguyen, Phuong Loan |
|
1993 |
25 |
1-4 |
p. 81-84 4 p. |
artikel |
122 |
Proprinter design for manufacturability
|
George, L.J. |
|
1993 |
25 |
1-4 |
p. 481-485 5 p. |
artikel |
123 |
Quality circle activities in the Turkish establishments
|
Gozlu, Sitki |
|
1993 |
25 |
1-4 |
p. 37-40 4 p. |
artikel |
124 |
Reducing weapons systems' life cycle costs with simulation modeling
|
Henninger, Amy |
|
1993 |
25 |
1-4 |
p. 183-185 3 p. |
artikel |
125 |
Relationship between eraser node and traffic intensity in counter rotating slotted ring
|
Choi, Kwok K. |
|
1993 |
25 |
1-4 |
p. 553-556 4 p. |
artikel |
126 |
Reliability analysis for a single-area generation system
|
Wu, Chao-Yen |
|
1993 |
25 |
1-4 |
p. 85-88 4 p. |
artikel |
127 |
Reliability of information flow in a CIM system
|
Ehie, Ike C. |
|
1993 |
25 |
1-4 |
p. 519-522 4 p. |
artikel |
128 |
Replacement policy for a partially observable Markov decision process model using fuzzy data
|
Chang Eun Kim, |
|
1993 |
25 |
1-4 |
p. 435-438 4 p. |
artikel |
129 |
Required steps for successful design and implementation of simulation
|
Houshyar, Azim |
|
1993 |
25 |
1-4 |
p. 53-56 4 p. |
artikel |
130 |
Revisiting and expanding taylorism business process redesign and information technology
|
Hosseini, Jinoos |
|
1993 |
25 |
1-4 |
p. 533-535 3 p. |
artikel |
131 |
Scheduling in an MRP environment
|
Süer, Gürsel A. |
|
1993 |
25 |
1-4 |
p. 251-254 4 p. |
artikel |
132 |
Self learning for autonomous systems
|
Ali, Kamal S. |
|
1993 |
25 |
1-4 |
p. 401-404 4 p. |
artikel |
133 |
Simulation analysis with group screening
|
Murugabaskar, Swaminathan |
|
1993 |
25 |
1-4 |
p. 25-28 4 p. |
artikel |
134 |
Simulation concepts for information system
|
Mourant, Ronald R. |
|
1993 |
25 |
1-4 |
p. 541-544 4 p. |
artikel |
135 |
Smart lifts: Control design and performance evaluation
|
Benmakhlouf, Samir M. |
|
1993 |
25 |
1-4 |
p. 175-178 4 p. |
artikel |
136 |
Strategic justification of advanced automated technology systems using an expert system
|
Daugherty, Lee C |
|
1993 |
25 |
1-4 |
p. 107-110 4 p. |
artikel |
137 |
Systematic approach to new product development
|
Shipley, Thomas A. |
|
1993 |
25 |
1-4 |
p. 333-336 4 p. |
artikel |
138 |
The development of flight simulation database using handling quality studies
|
Ntuen, Celestine A. |
|
1993 |
25 |
1-4 |
p. 373-375 3 p. |
artikel |
139 |
The influence of alternate process planning in job shop scheduling
|
Jiang, Juichin |
|
1993 |
25 |
1-4 |
p. 263-266 4 p. |
artikel |
140 |
The investigation of new approaches to business data analysis
|
Damodaran, P.S. |
|
1993 |
25 |
1-4 |
p. 545-548 4 p. |
artikel |
141 |
The one-machine sequencing problem with dependent jobs
|
Dauzere-Peres, Stephane |
|
1993 |
25 |
1-4 |
p. 235-238 4 p. |
artikel |
142 |
The performance of materials management in multi-level product structures with demand uncertainty and back-ordering
|
Gupta, Surendra M. |
|
1993 |
25 |
1-4 |
p. 89-92 4 p. |
artikel |
143 |
Time standard and reject data collection system
|
Walton, Cynthia M. |
|
1993 |
25 |
1-4 |
p. 307-308 2 p. |
artikel |
144 |
TQM implementation in hospitals
|
Aly, Nael A. |
|
1993 |
25 |
1-4 |
p. 299-302 4 p. |
artikel |
145 |
Vendors selection via a spreadsheet analytical hierarchy process
|
Al-Faraj, Taqi N. |
|
1993 |
25 |
1-4 |
p. 65-68 4 p. |
artikel |
146 |
Work flow and electronic document management
|
Jones, Jim I. |
|
1993 |
25 |
1-4 |
p. 527-531 5 p. |
artikel |