nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A CAD-based layout planning procedure
|
Masud, A.S.M. |
|
1992 |
23 |
1-4 |
p. 385-388 4 p. |
artikel |
2 |
A computer application is apparel manufacturing management
|
Chen, C. |
|
1992 |
23 |
1-4 |
p. 439-442 4 p. |
artikel |
3 |
A computer-based information system for clinical engineering in hospitals
|
Wu, Chao-Yen |
|
1992 |
23 |
1-4 |
p. 323-326 4 p. |
artikel |
4 |
A computer-based model for system level reliability and maintainability allocation
|
Byrd, William |
|
1992 |
23 |
1-4 |
p. 177-180 4 p. |
artikel |
5 |
A decision support system for college selection
|
Wu, Chao-Yen |
|
1992 |
23 |
1-4 |
p. 397-400 4 p. |
artikel |
6 |
A featured-based dynamic process planning and scheduling
|
Dong, Jian |
|
1992 |
23 |
1-4 |
p. 141-144 4 p. |
artikel |
7 |
A framework for integrating manufacturing process design and analysis
|
Burhanuddin, Shiekh |
|
1992 |
23 |
1-4 |
p. 27-30 4 p. |
artikel |
8 |
A fussy-logic control language for embedded controllers
|
Yeralan, Sencer |
|
1992 |
23 |
1-4 |
p. 331-334 4 p. |
artikel |
9 |
A fuzzy linguistics model for job related injury risk assessment
|
Pamela McCauley-Bell, M.S. |
|
1992 |
23 |
1-4 |
p. 209-212 4 p. |
artikel |
10 |
A heuristic grouping procedure for component family formation in a cellular manufacturing environment
|
Amirahmadi, F. |
|
1992 |
23 |
1-4 |
p. 69-72 4 p. |
artikel |
11 |
A heuristic procedure to minimize number of tardy jobs and total tardiness in single machine scheduling
|
Suer, Gursel A. |
|
1992 |
23 |
1-4 |
p. 145-148 4 p. |
artikel |
12 |
Air quality, industrial engineers, and computers
|
Ristroph, John H. |
|
1992 |
23 |
1-4 |
p. 451-454 4 p. |
artikel |
13 |
A linear programming approach for optimizing the path of robot arm in an obstacle oriented work cell
|
Shukla, Ajay |
|
1992 |
23 |
1-4 |
p. 309-312 4 p. |
artikel |
14 |
A methodology of forming manufacturing cells using manufacturing and design attributes
|
Kamrani, Ali K. |
|
1992 |
23 |
1-4 |
p. 73-76 4 p. |
artikel |
15 |
An activity-based cost management system
|
Jackson, Denise F. |
|
1992 |
23 |
1-4 |
p. 413-416 4 p. |
artikel |
16 |
An algorithm to find the number of parallel stations for optimal cell scheduling
|
Suer, Gursel A. |
|
1992 |
23 |
1-4 |
p. 81-84 4 p. |
artikel |
17 |
An approach for development of reusable container system in large scale manufacturing
|
Mannur, Narasimha R. |
|
1992 |
23 |
1-4 |
p. 511-514 4 p. |
artikel |
18 |
Animated simulation of the robot process capability
|
Wei, Chiu-Chi |
|
1992 |
23 |
1-4 |
p. 237-240 4 p. |
artikel |
19 |
An integrated implementation for product design
|
Huang, Chien-nan |
|
1992 |
23 |
1-4 |
p. 41-44 4 p. |
artikel |
20 |
An intelligent grouping algorithm for cellular manufacturing
|
Currie, Kenneth R. |
|
1992 |
23 |
1-4 |
p. 109-112 4 p. |
artikel |
21 |
An interface for hierarchical modeling in object-oriented simulation
|
Mourant, Ronald R. |
|
1992 |
23 |
1-4 |
p. 233-235 3 p. |
artikel |
22 |
An object-oriented window scheme for representing design and manufacturing activities
|
Dong, Jian |
|
1992 |
23 |
1-4 |
p. 19-22 4 p. |
artikel |
23 |
An optimal solution to a dock door assignment problem
|
Tsui, Louis Y. |
|
1992 |
23 |
1-4 |
p. 283-286 4 p. |
artikel |
24 |
A parallel processing algorithm for nonlinear programming problems
|
Tsujimura, Y. |
|
1992 |
23 |
1-4 |
p. 305-307 3 p. |
artikel |
25 |
A partitioning gradient based (PGB) algorithm for solving nonlinear goal pogramming problems
|
Saber, Hussein M. |
|
1992 |
23 |
1-4 |
p. 291-294 4 p. |
artikel |
26 |
Application of concepts of networking animation models for synchronous assembly
|
Morrison, Kenneth R. |
|
1992 |
23 |
1-4 |
p. 257-260 4 p. |
artikel |
27 |
Applications of neural network in regression analysis
|
Wu, Fred Y. |
|
1992 |
23 |
1-4 |
p. 93-95 3 p. |
artikel |
28 |
Applying a coupled expert system to quality control charts
|
Lall, Vinod |
|
1992 |
23 |
1-4 |
p. 401-404 4 p. |
artikel |
29 |
A program for dispatching and routing AGVs
|
Smith, Tanya |
|
1992 |
23 |
1-4 |
p. 187-190 4 p. |
artikel |
30 |
A rule-based part orientation system for fixtureless assembly
|
Furtado, Dulio |
|
1992 |
23 |
1-4 |
p. 23-26 4 p. |
artikel |
31 |
A schedule verification methodology utilizing simulation
|
Taylor, R.Bruce |
|
1992 |
23 |
1-4 |
p. 435-438 4 p. |
artikel |
32 |
A scheduling system for supermarket cashiers
|
Melachrinoudis, Emanuel |
|
1992 |
23 |
1-4 |
p. 121-124 4 p. |
artikel |
33 |
A sequential block approach to the design of a cost estimation system
|
Downs, Kraig A. |
|
1992 |
23 |
1-4 |
p. 423-426 4 p. |
artikel |
34 |
A simulation system for a surface climbing robot
|
Wen, Li |
|
1992 |
23 |
1-4 |
p. 275-278 4 p. |
artikel |
35 |
A Software for Capital Investment Analysis in Manufacturing
|
MacStravic, Elin L. |
|
1992 |
23 |
1-4 |
p. 417-421 5 p. |
artikel |
36 |
A systematic supplier selection procedure
|
Houshyar, Azim |
|
1992 |
23 |
1-4 |
p. 173-176 4 p. |
artikel |
37 |
A winning strategy for managing simulation projects
|
Benjamin, Colin O. |
|
1992 |
23 |
1-4 |
p. 229-232 4 p. |
artikel |
38 |
Better safe than sorry
|
Zimmerman, Steven M. |
|
1992 |
23 |
1-4 |
p. 499-501 3 p. |
artikel |
39 |
Classifying U.S. manufacturing plant locations using an artificial neural network
|
Tarek Gaber, M. |
|
1992 |
23 |
1-4 |
p. 101-104 4 p. |
artikel |
40 |
Color spreading algorithm for the retail industry
|
Pelosi, Marilyn K. |
|
1992 |
23 |
1-4 |
p. 463-466 4 p. |
artikel |
41 |
Comparison of image processing algorithms and neural networks in machine vision inspection
|
Huang, Chien-nan |
|
1992 |
23 |
1-4 |
p. 105-108 4 p. |
artikel |
42 |
Comparison of two simulation/animation tools for synchronous manufacturing
|
Morrison, Kenneth R. |
|
1992 |
23 |
1-4 |
p. 253-255 3 p. |
artikel |
43 |
Completely synchronous manufacturing for automotive assembly — some lessons learned
|
Jacobs, Brian |
|
1992 |
23 |
1-4 |
p. 261-265 5 p. |
artikel |
44 |
Computer aided reliability modeling and applications in semiconductor manufacturing
|
Tan, Baris |
|
1992 |
23 |
1-4 |
p. 169-172 4 p. |
artikel |
45 |
Computer application of a natural-language predetermined motion time system
|
Dossett, Royal |
|
1992 |
23 |
1-4 |
p. 319-322 4 p. |
artikel |
46 |
Computer control system for a metal cutting machine
|
El Hafsi, Mohsen |
|
1992 |
23 |
1-4 |
p. 345-348 4 p. |
artikel |
47 |
Computer interface design: A user-centered approach
|
McAlindon, Peter J. |
|
1992 |
23 |
1-4 |
p. 205-207 3 p. |
artikel |
48 |
Computerized dimensional inspection
|
Asoudegi, Ehsan |
|
1992 |
23 |
1-4 |
p. 357-360 4 p. |
artikel |
49 |
Concurrent engineering deployment: An enhanced “customer product” approach
|
Krishnaswamy, Ganesh M. |
|
1992 |
23 |
1-4 |
p. 503-506 4 p. |
artikel |
50 |
Constrained multi-item inventory systeṁs an implicit approach
|
Maloney, Billy M. |
|
1992 |
23 |
1-4 |
p. 279-282 4 p. |
artikel |
51 |
DAS: a graphical computer tool for the collection of musculoskeletal discomfort information from the workforce
|
Saldaña, Norka |
|
1992 |
23 |
1-4 |
p. 215-218 4 p. |
artikel |
52 |
Database design for predictive preventive maintenance system of automated manufacturing system
|
Okogbaa, Geoffrey |
|
1992 |
23 |
1-4 |
p. 7-10 4 p. |
artikel |
53 |
Data management system development for on-line data acquisition and process control
|
Geoffrey Okogbaa, O. |
|
1992 |
23 |
1-4 |
p. 341-344 4 p. |
artikel |
54 |
Design frameworks for concurrent engineering
|
Jo, Hyeon H. |
|
1992 |
23 |
1-4 |
p. 11-14 4 p. |
artikel |
55 |
Designing for maintainability: Computerized human models
|
Deivanayagam, S. |
|
1992 |
23 |
1-4 |
p. 195-196 2 p. |
artikel |
56 |
Development of an object-oriented simulator for material handling system design
|
Drolet, Jocelyn R. |
|
1992 |
23 |
1-4 |
p. 249-252 4 p. |
artikel |
57 |
Development of a spreadsheet-based capital investment model with sensitivity analysis
|
Taylor, R.Bruce |
|
1992 |
23 |
1-4 |
p. 431-433 3 p. |
artikel |
58 |
Development of optimum scheduling strategies for test facilities
|
Meenakshi Sundaran, R. |
|
1992 |
23 |
1-4 |
p. 125-128 4 p. |
artikel |
59 |
Development procedure of a hypermedia application in support of industrial tasks
|
Hosni, Yasser A. |
|
1992 |
23 |
1-4 |
p. 313-317 5 p. |
artikel |
60 |
Distributed control of manufacturing cells
|
Ravindranath, Linga S. |
|
1992 |
23 |
1-4 |
p. 471-474 4 p. |
artikel |
61 |
Editorial Board
|
|
|
1992 |
23 |
1-4 |
p. IFC- 1 p. |
artikel |
62 |
Exact optimal solution for facility layout: deciding which pairs of locations should be adjacent
|
Houshyar, Azim |
|
1992 |
23 |
1-4 |
p. 287-290 4 p. |
artikel |
63 |
Expert system for IE student advisement
|
Fernandez, Abel |
|
1992 |
23 |
1-4 |
p. 365-367 3 p. |
artikel |
64 |
Feature based models for manufacturability assessment
|
Lai, Steven H.-Y. |
|
1992 |
23 |
1-4 |
p. 31-35 5 p. |
artikel |
65 |
Finite queuing systems with gamma distributions
|
Driscoll, Wade C. |
|
1992 |
23 |
1-4 |
p. 493-497 5 p. |
artikel |
66 |
Formation of part families to design cells with alternative routing considerations
|
Meenakshi Sundaram, R. |
|
1992 |
23 |
1-4 |
p. 59-62 4 p. |
artikel |
67 |
Fuzzy logic control of aggregate production planning
|
Ward, T.L. |
|
1992 |
23 |
1-4 |
p. 137-140 4 p. |
artikel |
68 |
Graphical control of manufacturing work cells
|
Saboo, Jai V. |
|
1992 |
23 |
1-4 |
p. 49-53 5 p. |
artikel |
69 |
Graphical representation of help knowledge for intelligent tutoring systems
|
Paz, Noemi M. |
|
1992 |
23 |
1-4 |
p. 369-372 4 p. |
artikel |
70 |
Group scheduling problem: Key to flexible manufacturing systems
|
Logendran, Rasaratnam |
|
1992 |
23 |
1-4 |
p. 113-116 4 p. |
artikel |
71 |
Hydrothermal scheduling problems with pumped-storage hydro plants
|
Tang, Jianxin |
|
1992 |
23 |
1-4 |
p. 129-132 4 p. |
artikel |
72 |
Incorporating parameter variability in multi-attribute evaluation
|
Randhawa, Sabah U. |
|
1992 |
23 |
1-4 |
p. 389-392 4 p. |
artikel |
73 |
Industrial engineering support network for small manufacturers
|
Steinberg, Luiz |
|
1992 |
23 |
1-4 |
p. 467-469 3 p. |
artikel |
74 |
Information resource matrix for production and intelligent manufacturing using genetic algorithm techniques
|
Kulkarni, Janardan |
|
1992 |
23 |
1-4 |
p. 483-485 3 p. |
artikel |
75 |
Integrating the grouping and layout problems in cellular manufacturing systems
|
Alfa, Attahiru Sule |
|
1992 |
23 |
1-4 |
p. 55-58 4 p. |
artikel |
76 |
Inter/intra process communications in ISTS
|
Sidani, Taha |
|
1992 |
23 |
1-4 |
p. 89-92 4 p. |
artikel |
77 |
Knowledge acquisition for group problem solving
|
Williams, Kent E. |
|
1992 |
23 |
1-4 |
p. 459-462 4 p. |
artikel |
78 |
Knowledge-based approach to simulation model validation
|
Waikar, Avinash |
|
1992 |
23 |
1-4 |
p. 245-248 4 p. |
artikel |
79 |
Knowledge based decision support for PCB assembly using SMT
|
Srihari, K. |
|
1992 |
23 |
1-4 |
p. 405-408 4 p. |
artikel |
80 |
Knowledge-based single machine scheduling
|
Suer, Gursel A. |
|
1992 |
23 |
1-4 |
p. 149-152 4 p. |
artikel |
81 |
Lewis Carroll's contributions to artificial intelligence
|
Okashah, Lobna A. |
|
1992 |
23 |
1-4 |
p. 377-380 4 p. |
artikel |
82 |
MAG-EX: A magnetics fabrication expert systems focusing expert systems technology on improving quality control
|
Tolar, Kyle |
|
1992 |
23 |
1-4 |
p. 165-168 4 p. |
artikel |
83 |
Managing and interpreting student actions in an intelligent simulation training system
|
Sargeant, Jenifer M. |
|
1992 |
23 |
1-4 |
p. 197-199 3 p. |
artikel |
84 |
Manufacturing applications of octrees
|
Allada, Venkata |
|
1992 |
23 |
1-4 |
p. 37-40 4 p. |
artikel |
85 |
Method for solving multiobjective aggregate production planning problem with fuzzy parameters
|
Gen, M. |
|
1992 |
23 |
1-4 |
p. 117-120 4 p. |
artikel |
86 |
Minimization of drilling costs: A closed-form solution
|
Shaikh, Muzaffar A. |
|
1992 |
23 |
1-4 |
p. 443-446 4 p. |
artikel |
87 |
Multi-criteria analysis in the evaluation of advanced manufacturing technology using promethee
|
Kolli, Sai |
|
1992 |
23 |
1-4 |
p. 455-458 4 p. |
artikel |
88 |
Multicriteria multigoal decision making - the fuzzy paradigm
|
Satyadas, Antony |
|
1992 |
23 |
1-4 |
p. 393-396 4 p. |
artikel |
89 |
Multi-objective modelling of operation-allocation problem in flexible manufacturing systems
|
Taboun, S.M. |
|
1992 |
23 |
1-4 |
p. 295-299 5 p. |
artikel |
90 |
Natural intelligence in design and manufacturing
|
Bahrami, Ali |
|
1992 |
23 |
1-4 |
p. 45-48 4 p. |
artikel |
91 |
Network management: A critical success factor for implementing computer-integrated manufacturing
|
Udo, Godwin J. |
|
1992 |
23 |
1-4 |
p. 409-412 4 p. |
artikel |
92 |
Neural networks applications in manufacturing processes
|
Udo, Godwin J. |
|
1992 |
23 |
1-4 |
p. 97-100 4 p. |
artikel |
93 |
On the design of AGV travel mechanisms
|
Lai, Steven H.-Y. |
|
1992 |
23 |
1-4 |
p. 181-185 5 p. |
artikel |
94 |
On the development of computer bases path planning strategies for Robotic Spray Glazing
|
Narayanan, Vivek |
|
1992 |
23 |
1-4 |
p. 15-18 4 p. |
artikel |
95 |
On the linear programming problems with interval coefficients
|
Nakahara, Y. |
|
1992 |
23 |
1-4 |
p. 301-304 4 p. |
artikel |
96 |
OTPM and the new manufacturing paradigm
|
Manley, John H. |
|
1992 |
23 |
1-4 |
p. 427-430 4 p. |
artikel |
97 |
Part selection and part assignment in flexible manufacturing systems with cellular layout
|
Liang, Miang |
|
1992 |
23 |
1-4 |
p. 63-67 5 p. |
artikel |
98 |
Planning facilities for elderly patients care examination room
|
Minemura, Toshihiro |
|
1992 |
23 |
1-4 |
p. 191-194 4 p. |
artikel |
99 |
Pollution prevention survey using microcomputers
|
Ristroph, John H. |
|
1992 |
23 |
1-4 |
p. 447-450 4 p. |
artikel |
100 |
Quality process modelling: An application to the continuous electrical resistance annealing of copper wire
|
Shao, Y.E. |
|
1992 |
23 |
1-4 |
p. 161-164 4 p. |
artikel |
101 |
Quantitative automated inspection of standard parts using machine vision
|
Asoudegi, Ehsan |
|
1992 |
23 |
1-4 |
p. 361-364 4 p. |
artikel |
102 |
Real-time integrated model for visual perception and fuzzy control
|
Sieger, David B. |
|
1992 |
23 |
1-4 |
p. 355- 1 p. |
artikel |
103 |
Relational database management systems and industrial engineering
|
Jackson, Denise F. |
|
1992 |
23 |
1-4 |
p. 479-482 4 p. |
artikel |
104 |
Research and development of a method for determining strategic information needs of managers
|
Jones, R.Martin |
|
1992 |
23 |
1-4 |
p. 475-478 4 p. |
artikel |
105 |
Rightsizing your computer system - fundamentals and future directions
|
Cowdrick, Robert M. |
|
1992 |
23 |
1-4 |
p. 327-330 4 p. |
artikel |
106 |
Robust scheduling for manufacturing systems
|
Velagapudi, Naveen K. |
|
1992 |
23 |
1-4 |
p. 133-136 4 p. |
artikel |
107 |
Selective assembly with components of dissimilar variance
|
Pugh, G.Allen |
|
1992 |
23 |
1-4 |
p. 487-491 5 p. |
artikel |
108 |
Simulation of programmable logic controller
|
Lu, Hongzheng |
|
1992 |
23 |
1-4 |
p. 351-354 4 p. |
artikel |
109 |
Simulation with Object Oriented Programming
|
Ward, Rodney L. |
|
1992 |
23 |
1-4 |
p. 219-222 4 p. |
artikel |
110 |
Simultaneous machine-part grouping approach in manufacturing cells
|
Logendran, Rasaratnam |
|
1992 |
23 |
1-4 |
p. 77-80 4 p. |
artikel |
111 |
SM2ILE: A heuristic simulation tool for strategic distribution planning
|
Raj, Pravin S. |
|
1992 |
23 |
1-4 |
p. 241-244 4 p. |
artikel |
112 |
Spreadsheet and dynamic schedule inputs to the SIMAN IV simulation language
|
Poock, David W. |
|
1992 |
23 |
1-4 |
p. 223-227 5 p. |
artikel |
113 |
System integrators and implementers: The tools of choice have expanded since the Gilbreths and Taylor
|
Cox, John Lew |
|
1992 |
23 |
1-4 |
p. 507-510 4 p. |
artikel |
114 |
Temporal aspects in FMS scheduling: An overview
|
an-Najjar, Mazin A. |
|
1992 |
23 |
1-4 |
p. 157-160 4 p. |
artikel |
115 |
The development of a program generator for programmable logic controllers
|
Ram, Bala |
|
1992 |
23 |
1-4 |
p. 335-339 5 p. |
artikel |
116 |
The integration of modular fixture database, fixturing knowledge base and 3-D fixture planning interface
|
Huang, Shih-huai |
|
1992 |
23 |
1-4 |
p. 381-384 4 p. |
artikel |
117 |
The role of automatic identification (Auto ID) in the computer integrated manufacturing (CIM) architecture
|
Udoka, Silvanus J. |
|
1992 |
23 |
1-4 |
p. 1-5 5 p. |
artikel |
118 |
The top architecture for multiagent task planning and scheduling
|
Ntuen, Celestine A. |
|
1992 |
23 |
1-4 |
p. 153-156 4 p. |
artikel |
119 |
The use of voice mail software to monitor self-paced training programs
|
Fischer, Bruce D. |
|
1992 |
23 |
1-4 |
p. 213-214 2 p. |
artikel |
120 |
Tutoring in a generic intelligent simulation training system
|
Jung, Namho |
|
1992 |
23 |
1-4 |
p. 373-375 3 p. |
artikel |
121 |
Using computerized cinematography to develop a predictive model relating muscle stress and wrist movement
|
White, Bob |
|
1992 |
23 |
1-4 |
p. 201-204 4 p. |
artikel |
122 |
Using simulation to improve synchronous flow in pinion manufacturing
|
Schian, Christina R. |
|
1992 |
23 |
1-4 |
p. 267-273 7 p. |
artikel |
123 |
Waiting time calculations for K machines with 2 service facilities
|
Barlach, Ziv |
|
1992 |
23 |
1-4 |
p. 85-88 4 p. |
artikel |
124 |
Will simulation survive the arrival of intelligent control systems
|
Biegel, John E. |
|
1992 |
23 |
1-4 |
p. 349-350 2 p. |
artikel |