nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A basis for the design of a multiattribute heuristic for single resource project scheduling
|
Khattab, Mostafa |
|
1992 |
22 |
2 |
p. 157-161 |
artikel |
2 |
A decomposition method for generation scheduling of hydro systems with delays and unpredictable changes in natural inflows
|
Tang, Jianxin |
|
1992 |
22 |
2 |
p. 147-155 |
artikel |
3 |
A greedy heuristic for bicriterion single machine scheduling problems
|
Chang, Pei Chann (michael) |
|
1992 |
22 |
2 |
p. 121-131 |
artikel |
4 |
Design and standardization issues in serial networking
|
Landers, Thomas L. |
|
1992 |
22 |
2 |
p. 185-194 |
artikel |
5 |
Design of a knowledge-based performance progress monitor
|
Widmer, Neal S. |
|
1992 |
22 |
2 |
p. 101-114 |
artikel |
6 |
Optimal control of jobs for production systems
|
Liao, Ching-Jong |
|
1992 |
22 |
2 |
p. 163-169 |
artikel |
7 |
Optimal single-machine sequencing and assignment of common due-dates
|
Cheng, T.C.E. |
|
1992 |
22 |
2 |
p. 115-120 |
artikel |
8 |
Quantity discounts using a joint lot size model under learning effects—single buyer case
|
Nanda, Ravinder |
|
1992 |
22 |
2 |
p. 211-221 |
artikel |
9 |
Standard bootstrap confidence interval estimates of CPK
|
Wasserman, Gary S. |
|
1992 |
22 |
2 |
p. 171-176 |
artikel |
10 |
The development of a prototype DSS for the diagnosis of casting production defects
|
Plant, Robert T. |
|
1992 |
22 |
2 |
p. 133-146 |
artikel |
11 |
Unit sized transfer batch scheduling with setup times
|
Can Çetinkaya, F. |
|
1992 |
22 |
2 |
p. 177-183 |
artikel |
12 |
Using the taguchi paradigm for manufacturing system design using simulation experiments
|
Mayer, R.J. |
|
1992 |
22 |
2 |
p. 195-209 |
artikel |