nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A distributed approach to job scheduling in a Flexible Manufacturing System
|
Ahluwalia, Rashpal S. |
|
1991 |
20 |
1 |
p. 95-103 9 p. |
artikel |
2 |
A Just-In-Time simulation model of a PCB assembly line
|
Kung, Hsiang-Kuan |
|
1991 |
20 |
1 |
p. 17-26 10 p. |
artikel |
3 |
A mixed integer programming model for operator cyclic walking pattern development in GT cells
|
Chen, Houn-Gee |
|
1991 |
20 |
1 |
p. 77-88 12 p. |
artikel |
4 |
Analysis of heuristics for job sequencing in manufacturing flow line work-cells
|
Park, Taeho |
|
1991 |
20 |
1 |
p. 129-140 12 p. |
artikel |
5 |
An experimental expert system for process planning of sheet-metal parts
|
Uzsoy, Reha |
|
1991 |
20 |
1 |
p. 59-69 11 p. |
artikel |
6 |
An inventory model for deteriorating items
|
Raafat, Feraidoon (Fred) |
|
1991 |
20 |
1 |
p. 89-94 6 p. |
artikel |
7 |
Application of assembly line balancing techniques to installment lending operations of commercial banks
|
Levary, Reuven R. |
|
1991 |
20 |
1 |
p. 105-109 5 p. |
artikel |
8 |
Approximate MVA for closed queueing network models of FMS with a block-and-wait mechanism
|
Zhuang, Li |
|
1991 |
20 |
1 |
p. 35-44 10 p. |
artikel |
9 |
A production inventory model for producing two-products at a single facility with deteriorating raw materials
|
Hwang, Hark |
|
1991 |
20 |
1 |
p. 141-147 7 p. |
artikel |
10 |
Capital tracking and project control
|
Christian, Peter H. |
|
1991 |
20 |
1 |
p. 71-75 5 p. |
artikel |
11 |
Concurrent modeling and simulation of reactive manufacturing systems using Petri nets
|
Ben-Arieh, D. |
|
1991 |
20 |
1 |
p. 45-58 14 p. |
artikel |
12 |
Development of an expert system for industrial robot selection
|
Boubekri, Nourredine |
|
1991 |
20 |
1 |
p. 119-127 9 p. |
artikel |
13 |
Editorial Board
|
|
|
1991 |
20 |
1 |
p. IFC- 1 p. |
artikel |
14 |
Flexible facility layout by simulation
|
Savsar, Mehmet |
|
1991 |
20 |
1 |
p. 155-165 11 p. |
artikel |
15 |
Reliability demonstration test and OC curves for attribute data
|
Lin, Tony |
|
1991 |
20 |
1 |
p. 1-16 16 p. |
artikel |
16 |
Selecting and generating variates for modeling service times
|
Klein, Robert W. |
|
1991 |
20 |
1 |
p. 27-33 7 p. |
artikel |
17 |
Simultaneous grouping of parts and machines in cellular manufacturing systems—an integer programming approach
|
Raja Gunasingh, K. |
|
1991 |
20 |
1 |
p. 111-117 7 p. |
artikel |
18 |
The integrated production inventory model with a powers-of-two restriction
|
Kim, Kyung Mo |
|
1991 |
20 |
1 |
p. 149-153 5 p. |
artikel |