nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Bi-objective stochastic blood type supply chain configuration and optimization considering time-dependent routing in post-disaster relief logistics
|
Entezari, Sarah |
|
|
188 |
C |
p. |
artikel |
2 |
A concise subspace projection based meta-learning method for fast modeling and monitoring in multi-grade semiconductor process
|
Liu, Jingxiang |
|
|
188 |
C |
p. |
artikel |
3 |
Advances in partial disassembly line balancing: A state-of-the-art review
|
Güler, Elif |
|
|
188 |
C |
p. |
artikel |
4 |
A math-heuristic approach for scheduling the production and delivery of a mobile additive manufacturing hub
|
Gao, Yali |
|
|
188 |
C |
p. |
artikel |
5 |
An adaptive Copula function-based framework for fault detection in semiconductor wafer fabrication
|
Xu, Hong-Wei |
|
|
188 |
C |
p. |
artikel |
6 |
An adaptive large neighborhood search algorithm for parallel assembly lines scheduling problem with complex fixture constraints
|
Mao, Zhaofang |
|
|
188 |
C |
p. |
artikel |
7 |
An exact algorithm for the multiple-choice Knapsack problem with setups
|
Boukhari, Samah |
|
|
188 |
C |
p. |
artikel |
8 |
An improved deep Q-learning algorithm for a trade-off between energy consumption and productivity in batch scheduling
|
Zheng, Xu |
|
|
188 |
C |
p. |
artikel |
9 |
An improved MOEA/D for low-carbon many-objective flexible job shop scheduling problem
|
Wang, Zhixue |
|
|
188 |
C |
p. |
artikel |
10 |
Anomaly detection for synthetic diamond grain using monocular depth estimation
|
Fujiwara, Kazuki |
|
|
188 |
C |
p. |
artikel |
11 |
A nonparametric adaptive EWMA control chart for monitoring mixed continuous and categorical data using self-starting strategy
|
Xue, Li |
|
|
188 |
C |
p. |
artikel |
12 |
A personalized bidirectional feedback mechanism by combining cooperation and trust to improve group consensus in social network
|
Jin, Weidong |
|
|
188 |
C |
p. |
artikel |
13 |
Attack graph-based stochastic modeling approach for enabling cybersecure semiconductor wafer fabrication
|
Keith, Kolton |
|
|
188 |
C |
p. |
artikel |
14 |
Berth and quay cranes allocation problem with on-shore power supply assignment in container terminals
|
Wang, Zhu |
|
|
188 |
C |
p. |
artikel |
15 |
Blockchain adoption and contract coordination of poverty alleviation supply chain considering altruistic preference
|
Yu, Tianyang |
|
|
188 |
C |
p. |
artikel |
16 |
Coarse-grained vs fine-grained optimisation in highly integrated problem environments: A case study featuring port terminal operations
|
Thanos, Emmanouil |
|
|
188 |
C |
p. |
artikel |
17 |
Common due-date assignment problems with fixed-plus-linear earliness and tardiness costs
|
Atsmony, Matan |
|
|
188 |
C |
p. |
artikel |
18 |
Condition-based maintenance considering imperfect inspection for a multi-state system subject to competing and hidden failures
|
Zhang, Yanjing |
|
|
188 |
C |
p. |
artikel |
19 |
Consumer response to adjustable price and shelf-life of fresh food products under effective preservation policy
|
Waqas Iqbal, Muhammad |
|
|
188 |
C |
p. |
artikel |
20 |
Cyber-physical systems security: A systematic review
|
Harkat, Houda |
|
|
188 |
C |
p. |
artikel |
21 |
Data-driven analysis and human-centric assignment for manual assembly production lines
|
Kim, Goo-Young |
|
|
188 |
C |
p. |
artikel |
22 |
Data-driven optimization for energy-constrained dietary supplement scheduling: A bounded cut MP-DQN approach
|
Zhao, Yaping |
|
|
188 |
C |
p. |
artikel |
23 |
Development and application of a maturity model for Industrial Agile Working
|
Cimini, Chiara |
|
|
188 |
C |
p. |
artikel |
24 |
Does blockchain technology need to be introduced in the closed-loop supply chain based on product lifecycle management?
|
Wang, Yuyan |
|
|
188 |
C |
p. |
artikel |
25 |
Dynamic optimization of blood collection strategies from different potential donors using rolling horizon planning approach under uncertainty
|
Hosseini-Motlagh, Seyyed-Mahdi |
|
|
188 |
C |
p. |
artikel |
26 |
Editorial Board
|
|
|
|
188 |
C |
p. |
artikel |
27 |
Enhancing innovativeness and performance of the manufacturing supply chain through datafication: The role of resilience
|
Tian, Shuang |
|
|
188 |
C |
p. |
artikel |
28 |
Functional health prognosis approach for multistate manufacturing systems based on quality stochastic flow manufacturing network
|
Feng, Tianyu |
|
|
188 |
C |
p. |
artikel |
29 |
How does industrial intelligence affect total-factor energy productivity? Evidence from China’s manufacturing industry
|
Huang, Ruting |
|
|
188 |
C |
p. |
artikel |
30 |
Industrial AI in condition-based maintenance: A case study in wooden piece manufacturing
|
Marti-Puig, Pere |
|
|
188 |
C |
p. |
artikel |
31 |
Integration of production–maintenance planning and monitoring simple linear profiles via Hotelling's T2 control chart and particle swarm optimization
|
Shojaee, Mohsen |
|
|
188 |
C |
p. |
artikel |
32 |
Integration of sales, inventory, and transportation resource planning by dynamic-demand joint replenishment problem with time-varying costs
|
Suemitsu, Issei |
|
|
188 |
C |
p. |
artikel |
33 |
Inventory planning for self-serve pharmacy kiosks: A fill rate maximization approach
|
Baloch, Gohram |
|
|
188 |
C |
p. |
artikel |
34 |
Is telemedicine worth the effort? A study on the impact of effort cost on healthcare platform with heterogeneous preferences
|
Jacob, Jagan |
|
|
188 |
C |
p. |
artikel |
35 |
Job rotations based on physical and psychological workloads: A proposal for the footwear industry
|
Leite, Wilza Karla dos Santos |
|
|
188 |
C |
p. |
artikel |
36 |
Joint electric vehicle routing and battery health management integrating an explicit state of charge model
|
Longhitano, Pedro Dias |
|
|
188 |
C |
p. |
artikel |
37 |
Maintenance modeling for hot rolling production lines with constraint of auxiliary resources
|
Zhou, Xiaojun |
|
|
188 |
C |
p. |
artikel |
38 |
Multi-agent deep reinforcement learning based real-time planning approach for responsive customized bus routes
|
Wu, Binglin |
|
|
188 |
C |
p. |
artikel |
39 |
Multi-neighborhood simulated annealing for the capacitated facility location problem with customer incompatibilities
|
Ceschia, Sara |
|
|
188 |
C |
p. |
artikel |
40 |
Multi-resource constrained flexible job shop scheduling problem with fixture-pallet combinatorial optimisation
|
Liu, Molin |
|
|
188 |
C |
p. |
artikel |
41 |
Network-based two-stage robust scheduling strategy for the aircraft assembly system with uncertain duration
|
Hu, Jin-Hua |
|
|
188 |
C |
p. |
artikel |
42 |
Network configuration distributed production scheduling problem: A constraint programming approach
|
Ziadlou, Ghazal |
|
|
188 |
C |
p. |
artikel |
43 |
NSGA families for solving a dual resource-constrained problem to optimize the total tardiness and labor productivity in the spirit of sustainability
|
Akbar, Muhammad |
|
|
188 |
C |
p. |
artikel |
44 |
Optimal carbon quota allocation for a capital-constrained e-commerce supply chain under the carbon rights buyback policy
|
Wang, Yuyan |
|
|
188 |
C |
p. |
artikel |
45 |
Optimal management of full train load services in the shunting yard: A comprehensive study on Shunt-In Shunt-Out policies
|
Bosi, Tommaso |
|
|
188 |
C |
p. |
artikel |
46 |
Optimisation of livestock routing on farms
|
Corcoran, Padraig |
|
|
188 |
C |
p. |
artikel |
47 |
Optimising customer retention: An AI-driven personalised pricing approach
|
Ortakci, Yasin |
|
|
188 |
C |
p. |
artikel |
48 |
Personalized tourism product design focused on tourist expectations and online reviews: An integrated MCDM method
|
Liu, Xiao |
|
|
188 |
C |
p. |
artikel |
49 |
Physiological workload assessment for highly flexible fine-motory assembly tasks using machine learning
|
Brillinger, Markus |
|
|
188 |
C |
p. |
artikel |
50 |
Predictive modeling for technology convergence: A patent data-driven approach through technology topic networks
|
Afifuddin, Mokh |
|
|
188 |
C |
p. |
artikel |
51 |
Proactive scheduling for steel plants with unrelated parallel machines and time uncertainty
|
Lian, Xiaoyuan |
|
|
188 |
C |
p. |
artikel |
52 |
Recursive signal denoising method for predictive maintenance of equipment by using deep learning based temporal masking
|
Ren, Jie |
|
|
188 |
C |
p. |
artikel |
53 |
Reliability analysis of interval-valued multi-state sliding window system for sequential tasks
|
Wang, Wei |
|
|
188 |
C |
p. |
artikel |
54 |
Remanufacturing and pricing strategies under modular architecture
|
Huang, Qiulan |
|
|
188 |
C |
p. |
artikel |
55 |
Research on the decision-making method of coal order price and coal purchase quantity based on prediction
|
Wang, Yunrui |
|
|
188 |
C |
p. |
artikel |
56 |
Sequential auction for cloud manufacturing resource trading: A deep reinforcement learning approach to the lot-sizing problem
|
Yu, Kaize |
|
|
188 |
C |
p. |
artikel |
57 |
Simulation-based optimization of workforce configuration for multi-division maintenance departments
|
Golbasi, Onur |
|
|
188 |
C |
p. |
artikel |
58 |
Solving a 3D bin packing problem with stacking constraints
|
Zhu, Weiwang |
|
|
188 |
C |
p. |
artikel |
59 |
Supplier encroachment deterrence through a target-oriented retailer
|
Cao, Erbao |
|
|
188 |
C |
p. |
artikel |
60 |
Surrogate-assisted metaheuristics for the facility location problem with distributed demands on network edges
|
Sulaman, Muhammad |
|
|
188 |
C |
p. |
artikel |
61 |
The bivariate exponentiated additive Weibull distribution and its multivariate extension with applications
|
Poonia, Neeraj |
|
|
188 |
C |
p. |
artikel |
62 |
The dilemma of introducing blockchain technology into an assembly supply chain: A double-edged sword of profit and upstream invasion
|
Zhu, Xiaoxi |
|
|
188 |
C |
p. |
artikel |
63 |
The Hampered Travelling Salesman problem with Neighbourhoods
|
Puerto, Justo |
|
|
188 |
C |
p. |
artikel |
64 |
Threshold optimization of task allocation models in human–machine collaborative scoring of subjective assignments
|
Wang, Qian |
|
|
188 |
C |
p. |
artikel |
65 |
Transforming digital value chain ecosystems for dual-carbon target: An exploration of the BDS-RAS framework
|
Dou, Runliang |
|
|
188 |
C |
p. |
artikel |
66 |
Two-stage stochastic programming approach for fleet sizing and allocating rail wagon under uncertain demand
|
Karmanesh, Yasin |
|
|
188 |
C |
p. |
artikel |
67 |
Vulnerability to geopolitical disruptions of the global electric vehicle lithium-ion battery supply chain network
|
Ren, Huanyu |
|
|
188 |
C |
p. |
artikel |