no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A branch-and-bound procedure for robot assembly planning
|
Lee, Jim |
|
1989 |
17 |
1-4 |
p. 215-220 6 p. |
article |
2 |
Acceptance sampling design by computer — Optimality concerns
|
Brooks, George H. |
|
1989 |
17 |
1-4 |
p. 508-513 6 p. |
article |
3 |
A comparison of computerized predetermined time systems
|
Wygant, Robert M. |
|
1989 |
17 |
1-4 |
p. 480-485 6 p. |
article |
4 |
A comparison of goal programming and simulation model results for a multiobjective multiperiod multiproduct manufacturing scheduling problem
|
Galbraith, Lissa |
|
1989 |
17 |
1-4 |
p. 366-371 6 p. |
article |
5 |
A complexity metric approach to software quality measurement
|
Lin, Hsin-Hui |
|
1989 |
17 |
1-4 |
p. 531-535 5 p. |
article |
6 |
A diagnostic tolerance system
|
Ioannou, Yiannakis A. |
|
1989 |
17 |
1-4 |
p. 27-30 4 p. |
article |
7 |
A form feature oriented coding scheme
|
Chen, Chin-Sheng |
|
1989 |
17 |
1-4 |
p. 227-233 7 p. |
article |
8 |
A heuristic N-jobs/M-machines scheduling algorithm
|
Alli, Ali M. |
|
1989 |
17 |
1-4 |
p. 359-365 7 p. |
article |
9 |
A knowledge-based system for sensor selection
|
Ong, Jin B. |
|
1989 |
17 |
1-4 |
p. 85-89 5 p. |
article |
10 |
A knowledge-based system for the selection of appropriate work measurement techniques
|
Jackson, Denise Ford |
|
1989 |
17 |
1-4 |
p. 474-479 6 p. |
article |
11 |
A Lagrangian relaxation technique for certain inventory models
|
Ventura, Jose A. |
|
1989 |
17 |
1-4 |
p. 436-440 5 p. |
article |
12 |
Algorithms for solving large-scale 0–1 goal programming and its application to reliability optimization problem
|
Gen, M. |
|
1989 |
17 |
1-4 |
p. 525-530 6 p. |
article |
13 |
Allocating power to schedule loads and charge batteries on the space station
|
Sheskin, Theodore J. |
|
1989 |
17 |
1-4 |
p. 469-473 5 p. |
article |
14 |
A methodology for knowledge based decision support for facilities layout planning
|
Arinze, Bay |
|
1989 |
17 |
1-4 |
p. 31-36 6 p. |
article |
15 |
A microcomputer application in engineering anthropometry
|
Lee, C.H. |
|
1989 |
17 |
1-4 |
p. 491-495 5 p. |
article |
16 |
A microcomputer cutting stock analysis and planning system
|
Driscoll, Wade C. |
|
1989 |
17 |
1-4 |
p. 555-560 6 p. |
article |
17 |
An automated method for the preparation of orthogonal arrays for use in Taguchi designed experiments
|
Lewandowski, Henry S. |
|
1989 |
17 |
1-4 |
p. 502-507 6 p. |
article |
18 |
An efficient navigational aid for road travel
|
Ram, Balasubramanian |
|
1989 |
17 |
1-4 |
p. 561-564 4 p. |
article |
19 |
An expert system for manufacturing cell control
|
Sheng-Hsien (Gary) Teng, |
|
1989 |
17 |
1-4 |
p. 18-23 6 p. |
article |
20 |
An heuristic method for tardiness scheduling problems
|
Klein, Cerry M. |
|
1989 |
17 |
1-4 |
p. 288-292 5 p. |
article |
21 |
An interactive graphical aided scheduling system
|
Rogers, Ralph V. |
|
1989 |
17 |
1-4 |
p. 113-118 6 p. |
article |
22 |
An interactive knowledge-based system for forecasting new product reliability
|
Nassar, Suheil M. |
|
1989 |
17 |
1-4 |
p. 323-326 4 p. |
article |
23 |
An interactive simulator for statistical process control
|
Chandra, M.Jeya |
|
1989 |
17 |
1-4 |
p. 186-190 5 p. |
article |
24 |
An object-oriented programming paradigm for synchronous manufacturing
|
Terry, W.Robert |
|
1989 |
17 |
1-4 |
p. 124-129 6 p. |
article |
25 |
Antithetic sequence in flow shop scheduling
|
Azim, Muhammad A. |
|
1989 |
17 |
1-4 |
p. 353-358 6 p. |
article |
26 |
Application of PDES to CAD/CAPP integration
|
Ssemakula, Mukasa E. |
|
1989 |
17 |
1-4 |
p. 234-239 6 p. |
article |
27 |
Application of quantitative methods to computer workstation support functions
|
Richerson, Michael E. |
|
1989 |
17 |
1-4 |
p. 570-574 5 p. |
article |
28 |
A prolog based expert system for the allocation of quality assurance program resources
|
Crawford, Kyle A. |
|
1989 |
17 |
1-4 |
p. 298-302 5 p. |
article |
29 |
A proposed method to use electronic spreadsheets to develop quality control charts
|
Zimmerman, Steven M. |
|
1989 |
17 |
1-4 |
p. 384-389 6 p. |
article |
30 |
A rule based dynamic prototype CAPP system
|
Srihari, K. |
|
1989 |
17 |
1-4 |
p. 240-245 6 p. |
article |
31 |
A simnet simulation model for estimating system reliability
|
Taha, Hamdy A. |
|
1989 |
17 |
1-4 |
p. 317-322 6 p. |
article |
32 |
A simulation study of sequencing and maintenance decisions in a dynamic job shop
|
Burton, Jonathan S. |
|
1989 |
17 |
1-4 |
p. 447-452 6 p. |
article |
33 |
Benefits of structured methodology utilization
|
Peterson, Susan |
|
1989 |
17 |
1-4 |
p. 142-148 7 p. |
article |
34 |
Block-processing adaptive filter for human eye movements
|
Wu, Chao-Yen |
|
1989 |
17 |
1-4 |
p. 496-501 6 p. |
article |
35 |
CIM for the process industries: A framework
|
Jackson, Terry C. |
|
1989 |
17 |
1-4 |
p. 1-6 6 p. |
article |
36 |
CLIPS — A powerful development and delivery expert system tool
|
Wygant, Robert M. |
|
1989 |
17 |
1-4 |
p. 546-549 4 p. |
article |
37 |
Combinatorial optimization in facility layout
|
Moon, Geeju |
|
1989 |
17 |
1-4 |
p. 43-48 6 p. |
article |
38 |
COMOL: Computer-aided operations and management of the lift
|
Hu, Po-Wen |
|
1989 |
17 |
1-4 |
p. 565-569 5 p. |
article |
39 |
Comparison and evaluation of cellular manufacturing design techniques
|
Taboun, S.M. |
|
1989 |
17 |
1-4 |
p. 603-608 6 p. |
article |
40 |
Comparison between the similarity coefficient method and machine-component group analysis in group technology applications
|
Seifoddini, Hamid |
|
1989 |
17 |
1-4 |
p. 609-613 5 p. |
article |
41 |
Computer aided design of unit loads
|
Daboub, Juan J. |
|
1989 |
17 |
1-4 |
p. 274-280 7 p. |
article |
42 |
Computer aided process planning with CMPP
|
Parks, Charles M. |
|
1989 |
17 |
1-4 |
p. 246-251 6 p. |
article |
43 |
Computer-aided software engineering and Ada -- The technological marriage of the decade
|
Linton, Darrell G. |
|
1989 |
17 |
1-4 |
p. 542-545 4 p. |
article |
44 |
Computer applications in machine productivity measurement
|
Florentin, H.E. |
|
1989 |
17 |
1-4 |
p. 170-174 5 p. |
article |
45 |
Computerized materials handling and facility layout design
|
Ziai, M.Reza |
|
1989 |
17 |
1-4 |
p. 55-60 6 p. |
article |
46 |
Computerizing productivity measurement for service installation companies
|
Solo, Patricia A. |
|
1989 |
17 |
1-4 |
p. 164-169 6 p. |
article |
47 |
Cost justification technique for digital imaging technology: A case study
|
Hylton, Donna G. |
|
1989 |
17 |
1-4 |
p. 620-623 4 p. |
article |
48 |
Courseware development for statistical inference
|
Goldberg, Joseph H. |
|
1989 |
17 |
1-4 |
p. 180-185 6 p. |
article |
49 |
Database Publishing: Applications, examples, and fundamental concepts
|
Keith, R. |
|
1989 |
17 |
1-4 |
p. 390-396 7 p. |
article |
50 |
Data security: A security implementation for relational database management systems
|
Nilakanta, Sree |
|
1989 |
17 |
1-4 |
p. 415-420 6 p. |
article |
51 |
Design and development of a physical simulator for robotic palletization
|
Chen, Chin-Sheng |
|
1989 |
17 |
1-4 |
p. 202-208 7 p. |
article |
52 |
Designing design tools for material flow systems
|
Goetschalckx, Marc |
|
1989 |
17 |
1-4 |
p. 265-269 5 p. |
article |
53 |
Developing and implementing CIM systems for process manufacturers and distributors
|
Cowdrick Jr, Robert M. |
|
1989 |
17 |
1-4 |
p. 7-11 5 p. |
article |
54 |
Diagnosis interval estimation in process analysis for troubleShooting tasks
|
Sylla, Cheickna |
|
1989 |
17 |
1-4 |
p. 519-524 6 p. |
article |
55 |
“Digi-code” - A micro computer program to digitize two dimensional figures and convert the data to CNC (Computer Numerical Control) Program
|
Eichner, Don W. |
|
1989 |
17 |
1-4 |
p. 258-264 7 p. |
article |
56 |
Economically-based acceptance sampling plans
|
Wall, Michael S. |
|
1989 |
17 |
1-4 |
p. 340-346 7 p. |
article |
57 |
Economic modelling and sensitivity analysis of alternative power plant designs
|
West, Thomas M. |
|
1989 |
17 |
1-4 |
p. 550-554 5 p. |
article |
58 |
Editorial Board
|
|
|
1989 |
17 |
1-4 |
p. IFC- 1 p. |
article |
59 |
Editor's note
|
Eldin, Hamed K. |
|
1989 |
17 |
1-4 |
p. xv- 1 p. |
article |
60 |
Enhancement of robot work envelope in a flexible manufacturing cell
|
Meenakshi Sundaram, R. |
|
1989 |
17 |
1-4 |
p. 209-214 6 p. |
article |
61 |
Epistemological problems in the development of intelligent information systems for industrial applications
|
Ngwenyama, Ojelanki K. |
|
1989 |
17 |
1-4 |
p. 67-72 6 p. |
article |
62 |
Ergonomic issues in quality control
|
Elshennawy, Ahmad K. |
|
1989 |
17 |
1-4 |
p. 514-518 5 p. |
article |
63 |
Essex — An intelligent advisor for expert system shell selection
|
Huffman, John E. |
|
1989 |
17 |
1-4 |
p. 12-17 6 p. |
article |
64 |
Evaluation of assembly routines with multitasking execution in a physical robotic cell
|
San Martin, Sergio |
|
1989 |
17 |
1-4 |
p. 221-226 6 p. |
article |
65 |
Expert systems can do job shop scheduling: An exploration and a proposal
|
Biegel, John E. |
|
1989 |
17 |
1-4 |
p. 347-352 6 p. |
article |
66 |
Expert systems for inventory control management
|
Sinha, Diptendu |
|
1989 |
17 |
1-4 |
p. 425-429 5 p. |
article |
67 |
Feedback approach to quality monitoring of a manufacturing process
|
English, John R. |
|
1989 |
17 |
1-4 |
p. 303-310 8 p. |
article |
68 |
Hot rolling mill optimization model
|
Liberatore, Ralph L. |
|
1989 |
17 |
1-4 |
p. 130-135 6 p. |
article |
69 |
How microcomputers and electronic spreadsheets can be used to educate industrial engineering students
|
Sitton, Randal W. |
|
1989 |
17 |
1-4 |
p. 175-179 5 p. |
article |
70 |
Incentive system for orders in medical records
|
Kumar, Arvind P. |
|
1989 |
17 |
1-4 |
p. 378-383 6 p. |
article |
71 |
Increased efficiency in local expenditure reporting through database design
|
Weeks, Janelle |
|
1989 |
17 |
1-4 |
p. 586-590 5 p. |
article |
72 |
Individual differences in human-computer interaction
|
Aykin, Nuray M. |
|
1989 |
17 |
1-4 |
p. 614-619 6 p. |
article |
73 |
Inference engine for material handling selection
|
Hosni, Yasser A. |
|
1989 |
17 |
1-4 |
p. 79-84 6 p. |
article |
74 |
Integrating scheduling and control functions in computer integrated manufacturing using artificial intelligence
|
Rabelo, Luis Carlos |
|
1989 |
17 |
1-4 |
p. 101-106 6 p. |
article |
75 |
Interactive and graphic implementations of the dedicated storage warehouse design model
|
Svestka, Joseph A. |
|
1989 |
17 |
1-4 |
p. 49-54 6 p. |
article |
76 |
Interviewer's toolbox
|
Karasz, Janice M. |
|
1989 |
17 |
1-4 |
p. 73-78 6 p. |
article |
77 |
Knowledge based approach to machine cell layout
|
Heragu, Sunderesh S. |
|
1989 |
17 |
1-4 |
p. 37-42 6 p. |
article |
78 |
Knowledge elicitation for expert systems in the law enforcement domain
|
Holloway, Bob |
|
1989 |
17 |
1-4 |
p. 90-94 5 p. |
article |
79 |
Linear programming as a tool for office automation planning
|
DePorter, Elden L. |
|
1989 |
17 |
1-4 |
p. 421-424 4 p. |
article |
80 |
Microcomputer applciations in an industrial engineering curriculum
|
Sepúlveda, JoséA. |
|
1989 |
17 |
1-4 |
p. 580-585 6 p. |
article |
81 |
Microcomputer applications in industrial engineering
|
Scott, Robert E. |
|
1989 |
17 |
1-4 |
p. 596- 1 p. |
article |
82 |
Microcomputer interactive software for optimization of (GT) machine-component group formation
|
Dao, Thien-My |
|
1989 |
17 |
1-4 |
p. 624-629 6 p. |
article |
83 |
Microlot: Inventory control system on the microcomputer
|
Moras, Rafael G. |
|
1989 |
17 |
1-4 |
p. 441-446 6 p. |
article |
84 |
Modeling a Markovian decision process by neural network
|
Sastri, T. |
|
1989 |
17 |
1-4 |
p. 464-468 5 p. |
article |
85 |
MRP decision support to resolve part shortages and machine/labor overloads
|
Chong, Philip S. |
|
1989 |
17 |
1-4 |
p. 453-458 6 p. |
article |
86 |
Multicriteria jobshop scheduling
|
Ramesh, R. |
|
1989 |
17 |
1-4 |
p. 597-602 6 p. |
article |
87 |
…On the direct programming of CNC milling equipment
|
Fenster, Douglas P. |
|
1989 |
17 |
1-4 |
p. 252-257 6 p. |
article |
88 |
Optimization of testability parameters
|
Aly, Nael A. |
|
1989 |
17 |
1-4 |
p. 333-339 7 p. |
article |
89 |
Petri net control of an automated manufacturing cell
|
Boucher, Thomas O. |
|
1989 |
17 |
1-4 |
p. 459-463 5 p. |
article |
90 |
Practical issues in designing knowledge-based expert systems
|
Hsu, Ko-Cheng |
|
1989 |
17 |
1-4 |
p. 61-66 6 p. |
article |
91 |
Quality Function Deployment (QFD) processes in an integrated quality information system
|
Chang, Chia-hao |
|
1989 |
17 |
1-4 |
p. 311-316 6 p. |
article |
92 |
Robust planning and scheduling for automated batch manufacturing systems
|
Velagapudi, Naveen K. |
|
1989 |
17 |
1-4 |
p. 119-123 5 p. |
article |
93 |
Selection of the best production environment under a given job mix with probabilistic daily demands
|
Sarper, Huseyin |
|
1989 |
17 |
1-4 |
p. 281-287 7 p. |
article |
94 |
Sequential optimization and revision of production plans over time
|
Sastri, Tep |
|
1989 |
17 |
1-4 |
p. 372-377 6 p. |
article |
95 |
Shared information processing links managers and affect productivity
|
Kurstedt Jr, Harold A. |
|
1989 |
17 |
1-4 |
p. 397-403 7 p. |
article |
96 |
Simulation and design of a dual-kanban production system
|
Potts Jr., B.Kent |
|
1989 |
17 |
1-4 |
p. 430-435 6 p. |
article |
97 |
Simulation of a PCB assembly line: A modified JIT approach
|
Kung, Hsiang-Kuan |
|
1989 |
17 |
1-4 |
p. 136-141 6 p. |
article |
98 |
Simulation system for material handling system design
|
Tabibzadeh, Kambiz |
|
1989 |
17 |
1-4 |
p. 270-273 4 p. |
article |
99 |
Smart shop floor scheduling using knowledge based simulation
|
Poshyanonda, Tatchapol |
|
1989 |
17 |
1-4 |
p. 107-112 6 p. |
article |
100 |
Spreadsheet applications in benefit/cost analysis
|
Graff, Lois |
|
1989 |
17 |
1-4 |
p. 293-297 5 p. |
article |
101 |
Standardization of work-a statistical approach using spreadsheet
|
Rehman, Syed A. |
|
1989 |
17 |
1-4 |
p. 486-490 5 p. |
article |
102 |
Synthetic neural networks for process control
|
Pugh, G.Allen |
|
1989 |
17 |
1-4 |
p. 24-26 3 p. |
article |
103 |
The design, implementation and evaluation of a diagnostic expert system for the work order procedure for small manufacturing companies
|
Kennedy, Kristin |
|
1989 |
17 |
1-4 |
p. 95-100 6 p. |
article |
104 |
The design of a user friendly statistical software package for the IBM personal computer and compatibles written in Turbo Pascal
|
Zwahlen, Helmut T. |
|
1989 |
17 |
1-4 |
p. 591-595 5 p. |
article |
105 |
The development of a university sports complex: A project management application
|
Mills, Nancy L. |
|
1989 |
17 |
1-4 |
p. 149-153 5 p. |
article |
106 |
The development of customized software for productivity improvement
|
Gustafson, Shireen |
|
1989 |
17 |
1-4 |
p. 159-163 5 p. |
article |
107 |
The good old days versus today: The changed hardware and software security requirements with automation
|
Miller, James E. |
|
1989 |
17 |
1-4 |
p. 404-409 6 p. |
article |
108 |
The Industrial Engineering Toolbox (IET)
|
Walton, H.Philip |
|
1989 |
17 |
1-4 |
p. 575-579 5 p. |
article |
109 |
The role of inspection in automated manufacturing
|
Elshennawy, Ahmad K. |
|
1989 |
17 |
1-4 |
p. 327-332 6 p. |
article |
110 |
To share data and information we must know what sharing is
|
Kurstedt Jr, Harold A. |
|
1989 |
17 |
1-4 |
p. 410-414 5 p. |
article |
111 |
Tracking projects-at-a-glance: Applying the SAS/GRAPH® as product a project management tool
|
Anderson, Brant W. |
|
1989 |
17 |
1-4 |
p. 154-158 5 p. |
article |
112 |
Transaction exchange management systems for successful systems integration
|
Stewart, Brian H. |
|
1989 |
17 |
1-4 |
p. 536-541 6 p. |
article |
113 |
Using model manufacturing systems as an aid to understanding computer integrated manufacturing systems
|
White, Bob E. |
|
1989 |
17 |
1-4 |
p. 196-201 6 p. |
article |
114 |
Using spreadsheet to teach on-line statistical process control
|
Liu, Ming C. |
|
1989 |
17 |
1-4 |
p. 191-195 5 p. |
article |