nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A bi-objective sustainable supplier selection and order allocation considering quantity discounts under disruption risks: A case study in plastic industry
|
Cheraghalipour, Armin |
|
2018 |
118 |
C |
p. 237-250 |
artikel |
2 |
A comprehensive approach for the selection of a portfolio of interdependent projects. An application to subsidized projects in Spain
|
Alvarez-García, B. |
|
2018 |
118 |
C |
p. 153-159 |
artikel |
3 |
A consensus framework with different preference ordering structures and its applications in human resource selection
|
He, Yue |
|
2018 |
118 |
C |
p. 80-88 |
artikel |
4 |
Advance selling with double marketing efforts in a newsvendor framework
|
Cheng, Yongsheng |
|
2018 |
118 |
C |
p. 352-365 |
artikel |
5 |
A least squares-based parallel hybridization of statistical and intelligent models for time series forecasting
|
Rahimi, Zahra Haji |
|
2018 |
118 |
C |
p. 44-53 |
artikel |
6 |
A multi-skilled worker assignment problem in seru production systems considering the worker heterogeneity
|
Lian, Jie |
|
2018 |
118 |
C |
p. 366-382 |
artikel |
7 |
An activity-based defect management framework for product development
|
Zheng, Huimeng |
|
2018 |
118 |
C |
p. 202-209 |
artikel |
8 |
An integrated approach for surgery scheduling under uncertainty
|
Wang, Jin |
|
2018 |
118 |
C |
p. 1-8 |
artikel |
9 |
An integrated model for production and batch shipments for ramp-up production
|
Kim, Taebok |
|
2018 |
118 |
C |
p. 138-152 |
artikel |
10 |
An integrated production and maintenance planning model under VP-T2 Hotelling chart
|
Salmasnia, Ali |
|
2018 |
118 |
C |
p. 89-103 |
artikel |
11 |
A robust and cooperative parallel tabu search algorithm for the maximum vertex weight clique problem
|
Kiziloz, Hakan Ezgi |
|
2018 |
118 |
C |
p. 54-66 |
artikel |
12 |
A stochastic closed-loop supply chain network design problem with multiple recovery options
|
Jerbia, Rim |
|
2018 |
118 |
C |
p. 23-32 |
artikel |
13 |
A tool to test and validate algorithms for the resource-constrained project scheduling problem
|
Vanhoucke, Mario |
|
2018 |
118 |
C |
p. 251-265 |
artikel |
14 |
Career incentive contract design in project management under companies’ competition and asymmetric information
|
Chen, Zhihua |
|
2018 |
118 |
C |
p. 210-225 |
artikel |
15 |
CLUS-MCDA: A novel framework based on cluster analysis and multiple criteria decision theory in a supplier selection problem
|
Ijadi Maghsoodi, Abteen |
|
2018 |
118 |
C |
p. 409-422 |
artikel |
16 |
Development and simulation analysis of a new perishable inventory model with a closing days constraint under non-stationary stochastic demand
|
Janssen, Larissa |
|
2018 |
118 |
C |
p. 9-22 |
artikel |
17 |
Dynamic cooperative promotion models with competing retailers and negative promotional effects on brand image
|
Huang, Zongsheng |
|
2018 |
118 |
C |
p. 291-308 |
artikel |
18 |
Editorial Board
|
|
|
2018 |
118 |
C |
p. ii |
artikel |
19 |
Efficiency decomposition and measurement in two-stage fuzzy DEA models using a bargaining game approach
|
Tavana, Madjid |
|
2018 |
118 |
C |
p. 394-408 |
artikel |
20 |
Evaluation of forecasting methods in aggregate production planning: A Cumulative Absolute Forecast Error (CAFE)
|
Ha, Chunghun |
|
2018 |
118 |
C |
p. 329-339 |
artikel |
21 |
Failure detection for series systems when tests are unreliable
|
Shahmoradi, Zahed |
|
2018 |
118 |
C |
p. 309-318 |
artikel |
22 |
Feature assignment in multi-release work plan: Accelerating optimization using gene clustering
|
Etgar, Ran |
|
2018 |
118 |
C |
p. 123-137 |
artikel |
23 |
Forecast of individual customer’s demand from a large and noisy dataset
|
Murray, Paul W. |
|
2018 |
118 |
C |
p. 33-43 |
artikel |
24 |
Identifying causal relationships in strategy maps using ANP and DEMATEL
|
Quezada, Luis E. |
|
2018 |
118 |
C |
p. 170-179 |
artikel |
25 |
Improved multi-variable grey forecasting model with a dynamic background-value coefficient and its application
|
Zeng, Bo |
|
2018 |
118 |
C |
p. 278-290 |
artikel |
26 |
Integrated control policy of production and preventive maintenance for a deteriorating manufacturing system
|
Kang, Kaican |
|
2018 |
118 |
C |
p. 266-277 |
artikel |
27 |
Integration of parts transportation without cross docking in a supply chain
|
Shaelaie, Mohammad-Hesam |
|
2018 |
118 |
C |
p. 67-79 |
artikel |
28 |
Investigating the effects of lead-time uncertainties and safety stocks on logistical performance in a border-crossing JIT supply chain
|
Chung, Wenming |
|
2018 |
118 |
C |
p. 440-450 |
artikel |
29 |
Mixed-model sequencing problem under capacity and machine idle time constraints in JIT production systems
|
Abdul Nazar, K.P. |
|
2018 |
118 |
C |
p. 226-236 |
artikel |
30 |
Multi-level maintenance strategy of deteriorating systems subject to two-stage inspection
|
Yang, Li |
|
2018 |
118 |
C |
p. 160-169 |
artikel |
31 |
Optimal replacement policies for a shock model with a change point
|
Zhao, Xian |
|
2018 |
118 |
C |
p. 383-393 |
artikel |
32 |
Reliability analysis for dependent competing failure processes with changing degradation rate and hard failure threshold levels
|
Hao, Songhua |
|
2018 |
118 |
C |
p. 340-351 |
artikel |
33 |
Robust parameters determination for ergonomical product design via computer musculoskeletal modeling and multi-objective optimization
|
Jeang, Angus |
|
2018 |
118 |
C |
p. 180-201 |
artikel |
34 |
Slope stability prediction using integrated metaheuristic and machine learning approaches: A comparative study
|
Qi, Chongchong |
|
2018 |
118 |
C |
p. 112-122 |
artikel |
35 |
Stochastic dynamic resource allocation for HIV prevention and treatment: An approximate dynamic programming approach
|
Coşgun, Özlem |
|
2018 |
118 |
C |
p. 423-439 |
artikel |
36 |
Supply chain coordination in Confirming Warehouse Financing
|
Lin, Qiang |
|
2018 |
118 |
C |
p. 104-111 |
artikel |
37 |
The distributed permutation flow shop to minimise the total flowtime
|
Fernandez-Viagas, Victor |
|
2018 |
118 |
C |
p. 464-477 |
artikel |
38 |
Time Cost Quality Trade-off Problems: A survey exploring the assessment of quality
|
Orm, Mayassa Bou |
|
2018 |
118 |
C |
p. 319-328 |
artikel |
39 |
Uncertain multi-item supply chain with two level trade credit under promotional cost sharing
|
Pakhira, Nilesh |
|
2018 |
118 |
C |
p. 451-463 |
artikel |