no |
title |
author |
magazine |
year |
volume |
issue |
page(s) |
type |
1 |
A preference-based interpretation of AHP
|
Lai, S-K. |
|
1995 |
23 |
4 |
p. 453-462 10 p. |
article |
2 |
A taxonomy for alternative equipment groupings in batch environments
|
Shafer, S.M. |
|
1995 |
23 |
4 |
p. 361-376 16 p. |
article |
3 |
CEO characteristics, organizational characteristics and information technology adoption in small businesses
|
Thong, J.Y.L. |
|
1995 |
23 |
4 |
p. 429-442 14 p. |
article |
4 |
Graph theoretic heuristics for unequal-sized facility layout problems
|
Kim, J.-Y. |
|
1995 |
23 |
4 |
p. 391-401 11 p. |
article |
5 |
Harmonic analysis, time series variations and the distributional properties of financial ratios
|
Fuller-Love, N. |
|
1995 |
23 |
4 |
p. 419-427 9 p. |
article |
6 |
Issues in the development of approaches to container loading
|
Bischoff, E.E. |
|
1995 |
23 |
4 |
p. 377-390 14 p. |
article |
7 |
Key words
|
|
|
1995 |
23 |
4 |
p. I- 1 p. |
article |
8 |
Links between higher education institutions and high technology firms
|
Westhead, P. |
|
1995 |
23 |
4 |
p. 345-360 16 p. |
article |
9 |
On the minimum cost project schedule
|
Kamburowski, J. |
|
1995 |
23 |
4 |
p. 463-465 3 p. |
article |
10 |
On the minimum cost project schedule— A response
|
Wu, Y. |
|
1995 |
23 |
4 |
p. 467- 1 p. |
article |
11 |
On the minimum cost project schedule—Note by the editor
|
Mitchell, George |
|
1995 |
23 |
4 |
p. 468- 1 p. |
article |
12 |
On the minimum cost project schedule—Some comments
|
Chapman, C.B. |
|
1995 |
23 |
4 |
p. 467-468 2 p. |
article |
13 |
Supply networks: Genesis, stability and logistics implications. A comparative analysis of two districts
|
De Toni, A |
|
1995 |
23 |
4 |
p. 403-418 16 p. |
article |
14 |
Using dynamic cellular manufacturing to simplify scheduling in cell based production systems
|
Kannan, V.R. |
|
1995 |
23 |
4 |
p. 443-452 10 p. |
article |