nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A constraint-based approach for the shift design personnel task scheduling problem with equity
|
Lapègue, Tanguy |
|
2013 |
40 |
10 |
p. 2450-2465 16 p. |
artikel |
2 |
A hybrid algorithm for a class of vehicle routing problems
|
Subramanian, Anand |
|
2013 |
40 |
10 |
p. 2519-2531 13 p. |
artikel |
3 |
Allocating job-shop manpower to minimize L max : Optimality criteria, search heuristics, and probabilistic quality metrics
|
Lobo, Benjamin J. |
|
2013 |
40 |
10 |
p. 2569-2584 16 p. |
artikel |
4 |
An adaptive penalty based covariance matrix adaptation–evolution strategy
|
Kusakci, Ali Osman |
|
2013 |
40 |
10 |
p. 2398-2417 20 p. |
artikel |
5 |
An EMSR-based approach for revenue management with integrated upgrade decisions
|
Gönsch, Jochen |
|
2013 |
40 |
10 |
p. 2532-2542 11 p. |
artikel |
6 |
A new lower bound for curriculum-based course timetabling
|
Cacchiani, V. |
|
2013 |
40 |
10 |
p. 2466-2477 12 p. |
artikel |
7 |
An experimental comparison of periodic timetabling models
|
Siebert, Michael |
|
2013 |
40 |
10 |
p. 2251-2259 9 p. |
artikel |
8 |
A note on “A heuristic method for two-stage hybrid flow shop with dedicated machines”
|
Hadda, Hatem |
|
2013 |
40 |
10 |
p. 2283- 1 p. |
artikel |
9 |
A note on the time travel approach for handling time windows in vehicle routing problems
|
Schneider, Michael |
|
2013 |
40 |
10 |
p. 2564-2568 5 p. |
artikel |
10 |
A parallel hybrid greedy branch and bound scheme for the maximum distance-2 matching problem
|
Christou, Ioannis T. |
|
2013 |
40 |
10 |
p. 2387-2397 11 p. |
artikel |
11 |
Applying two efficient hybrid heuristics for hub location problem with fully interconnected backbone and access networks
|
Saboury, Ali |
|
2013 |
40 |
10 |
p. 2493-2507 15 p. |
artikel |
12 |
Approximation schemes for bi-objective combinatorial optimization and their application to the TSP with profits
|
Filippi, Carlo |
|
2013 |
40 |
10 |
p. 2418-2428 11 p. |
artikel |
13 |
A reliable model for global planning of mobile networks
|
Adjarath Lemamou, Eunice |
|
2013 |
40 |
10 |
p. 2270-2282 13 p. |
artikel |
14 |
A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
|
Elmi, Atabak |
|
2013 |
40 |
10 |
p. 2543-2555 13 p. |
artikel |
15 |
Choquet optimal set in biobjective combinatorial optimization
|
Lust, Thibaut |
|
2013 |
40 |
10 |
p. 2260-2269 10 p. |
artikel |
16 |
Computational comparison of two formulations for dynamic supply chain reconfiguration with capacity expansion and contraction
|
Wilhelm, Wilbert |
|
2013 |
40 |
10 |
p. 2340-2356 17 p. |
artikel |
17 |
Coupling a memetic algorithm to simulation models for promising multi-period asset allocations
|
Yu, Tzu-Yi |
|
2013 |
40 |
10 |
p. 2585-2597 13 p. |
artikel |
18 |
Dynamic vehicle allocation control for automated material handling system in semiconductor manufacturing
|
Lin, James T. |
|
2013 |
40 |
10 |
p. 2329-2339 11 p. |
artikel |
19 |
Enhanced compact models for the connected subgraph problem and for the shortest path problem in digraphs with negative cycles
|
Haouari, Mohamed |
|
2013 |
40 |
10 |
p. 2485-2492 8 p. |
artikel |
20 |
Finding the nucleolus of any n-person cooperative game by a single linear program
|
Puerto, Justo |
|
2013 |
40 |
10 |
p. 2308-2313 6 p. |
artikel |
21 |
Maximizing for the sum of ratios of two convex functions over a convex set
|
Shen, Peiping |
|
2013 |
40 |
10 |
p. 2301-2307 7 p. |
artikel |
22 |
Metaheuristic algorithms for solving two interconnected vehicle routing problems in a hospital complex
|
Kergosien, Y. |
|
2013 |
40 |
10 |
p. 2508-2518 11 p. |
artikel |
23 |
Minimising maximum response time
|
García-Villoria, Alberto |
|
2013 |
40 |
10 |
p. 2314-2321 8 p. |
artikel |
24 |
Multi-objective discrete urban road network design
|
Miandoabchi, Elnaz |
|
2013 |
40 |
10 |
p. 2429-2449 21 p. |
artikel |
25 |
Optimal radio resources and transmission formats assignment in OFDMA systems
|
Abrardo, Andrea |
|
2013 |
40 |
10 |
p. 2284-2300 17 p. |
artikel |
26 |
Optimal versioning strategy for information products with behavior-based utility function of heterogeneous customers
|
Li, Minqiang |
|
2013 |
40 |
10 |
p. 2374-2386 13 p. |
artikel |
27 |
Scheduling the professional Ecuadorian football league by integer programming
|
Recalde, D. |
|
2013 |
40 |
10 |
p. 2478-2484 7 p. |
artikel |
28 |
Single string planning problem arising in liner shipping industries: A heuristic approach
|
Gelareh, Shahin |
|
2013 |
40 |
10 |
p. 2357-2373 17 p. |
artikel |
29 |
Static scheduling of directed acyclic data flow graphs onto multiprocessors using particle swarm optimization
|
Al Badawi, Ahmad |
|
2013 |
40 |
10 |
p. 2322-2328 7 p. |
artikel |
30 |
Title Page/Editorial Board
|
|
|
2013 |
40 |
10 |
p. i- 1 p. |
artikel |
31 |
Two approaches for solving the buffer allocation problem in unreliable production lines
|
Demir, Leyla |
|
2013 |
40 |
10 |
p. 2556-2563 8 p. |
artikel |