nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A branch-and-price algorithm for an integrated production and inventory routing problem
|
Bard, Jonathan F. |
|
2010 |
37 |
12 |
p. 2202-2217 16 p. |
artikel |
2 |
A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations
|
Klerides, E. |
|
2010 |
37 |
12 |
p. 2131-2140 10 p. |
artikel |
3 |
A general branch-and-bound algorithm for fair division problems
|
Vetschera, Rudolf |
|
2010 |
37 |
12 |
p. 2121-2130 10 p. |
artikel |
4 |
A memetic algorithm for minimizing total weighted tardiness on parallel batch machines with incompatible job families and dynamic job arrival
|
Chiang, Tsung-Che |
|
2010 |
37 |
12 |
p. 2257-2269 13 p. |
artikel |
5 |
An ant colony optimization metaheuristic for machine–part cell formation problems
|
Li, Xiangyong |
|
2010 |
37 |
12 |
p. 2071-2081 11 p. |
artikel |
6 |
A new mathematical model and a Lagrangean decomposition for the point-feature cartographic label placement problem
|
Mauri, Geraldo R. |
|
2010 |
37 |
12 |
p. 2164-2172 9 p. |
artikel |
7 |
An ILP improvement procedure for the Open Vehicle Routing Problem
|
Salari, Majid |
|
2010 |
37 |
12 |
p. 2106-2120 15 p. |
artikel |
8 |
A strategy for reducing the computational complexity of local search-based methods for the vehicle routing problem
|
Zachariadis, Emmanouil E. |
|
2010 |
37 |
12 |
p. 2089-2105 17 p. |
artikel |
9 |
Comparing three-step heuristics for the permutation flow shop problem
|
Ribas, Imma |
|
2010 |
37 |
12 |
p. 2062-2070 9 p. |
artikel |
10 |
Discrepancy search for the flexible job shop scheduling problem
|
Ben Hmida, Abir |
|
2010 |
37 |
12 |
p. 2192-2201 10 p. |
artikel |
11 |
Frequency assignment problem in satellite communications using differential evolution
|
Salman, Ayed A. |
|
2010 |
37 |
12 |
p. 2152-2163 12 p. |
artikel |
12 |
Industrial aspects and literature survey: Fleet composition and routing
|
Hoff, Arild |
|
2010 |
37 |
12 |
p. 2041-2061 21 p. |
artikel |
13 |
Integration of strategic and tactical decisions for vendor selection under capacity constraints
|
Keskin, Burcu B. |
|
2010 |
37 |
12 |
p. 2182-2191 10 p. |
artikel |
14 |
Jackson's semi-preemptive scheduling on a single machine
|
Gharbi, Anis |
|
2010 |
37 |
12 |
p. 2082-2088 7 p. |
artikel |
15 |
Load balancing in project assignment
|
Liang, Zhirong |
|
2010 |
37 |
12 |
p. 2248-2256 9 p. |
artikel |
16 |
Metaheuristics for the waste collection vehicle routing problem with time windows, driver rest period and multiple disposal facilities
|
Benjamin, A.M. |
|
2010 |
37 |
12 |
p. 2270-2280 11 p. |
artikel |
17 |
Optimal allocation of servers and processing time in a load balancing system
|
Maddah, Bacel |
|
2010 |
37 |
12 |
p. 2173-2181 9 p. |
artikel |
18 |
Optimal due date assignment and resource allocation in a group technology scheduling environment
|
Shabtay, Dvir |
|
2010 |
37 |
12 |
p. 2218-2228 11 p. |
artikel |
19 |
Optimal resource assignment to maximize multistate network reliability for a computer network
|
Lin, Yi-Kuei |
|
2010 |
37 |
12 |
p. 2229-2238 10 p. |
artikel |
20 |
Parallel machine scheduling with precedence constraints and setup times
|
Gacias, Bernat |
|
2010 |
37 |
12 |
p. 2141-2151 11 p. |
artikel |
21 |
Simple procedures of choice in multicriteria problems without precise information about the alternatives’ values
|
Sarabando, Paula |
|
2010 |
37 |
12 |
p. 2239-2247 9 p. |
artikel |
22 |
Title Page/Editorial Board
|
|
|
2010 |
37 |
12 |
p. i- 1 p. |
artikel |