nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A Bayesian Monte Carlo method for computing the Shapley value: Application to weighted voting and bin packing games
|
TOUATI, Sofiane |
|
|
125 |
C |
p. |
artikel |
2 |
A comparative study of different formulations for the capacitated discrete ordered median problem
|
Espejo, I. |
|
|
125 |
C |
p. |
artikel |
3 |
A metaheuristic based on tabu search for solving a technician routing and scheduling problem
|
Mathlouthi, Ines |
|
|
125 |
C |
p. |
artikel |
4 |
An evolutionary approach for resource constrained project scheduling with uncertain changes
|
Zaman, Forhad |
|
|
125 |
C |
p. |
artikel |
5 |
A new solution approach for multi-stage semi-open queuing networks: An application in shuttle-based compact storage systems
|
Kumawat, Govind Lal |
|
|
125 |
C |
p. |
artikel |
6 |
A scalable dynamic parking allocation framework
|
Mladenović, Marko |
|
|
125 |
C |
p. |
artikel |
7 |
A simulation-based heuristic for the electric vehicle routing problem with time windows and stochastic waiting times at recharging stations
|
Keskin, Merve |
|
|
125 |
C |
p. |
artikel |
8 |
Editorial Board
|
|
|
|
125 |
C |
p. |
artikel |
9 |
Energy aware scheduling in flexible flow shops with hybrid particle swarm optimization
|
Ding, Junwen |
|
|
125 |
C |
p. |
artikel |
10 |
Iterated greedy algorithms enhanced by hyper-heuristic based learning for hybrid flexible flowshop scheduling problem with sequence dependent setup times: A case study at a manufacturing plant
|
Burcin Ozsoydan, Fehmi |
|
|
125 |
C |
p. |
artikel |
11 |
Iterated local search with tabu search for the weighted vertex coloring problem
|
Nogueira, Bruno |
|
|
125 |
C |
p. |
artikel |
12 |
Minimizing makespan of stochastic customer orders in cellular manufacturing systems with parallel machines
|
Wu, Lang |
|
|
125 |
C |
p. |
artikel |
13 |
Order allocation, rack allocation and rack sequencing for pickers in a mobile rack environment
|
Valle, Cristiano Arbex |
|
|
125 |
C |
p. |
artikel |
14 |
Performance analysis of fixed assignment policies for stochastic online scheduling on uniform parallel machines
|
Buchem, Moritz |
|
|
125 |
C |
p. |
artikel |
15 |
Solving longest common subsequence problems via a transformation to the maximum clique problem
|
Blum, Christian |
|
|
125 |
C |
p. |
artikel |
16 |
Spatial and temporal optimization for smart warehouses with fast turnover
|
Jiang, Zhong-Zhong |
|
|
125 |
C |
p. |
artikel |
17 |
Synchronizing transportation of people with reduced mobility through airport terminals
|
van Twist, René |
|
|
125 |
C |
p. |
artikel |
18 |
The Multi-period Multi-trip Container Drayage Problem with Release and Due Dates
|
Bruglieri, M. |
|
|
125 |
C |
p. |
artikel |
19 |
Two-stage matching-and-scheduling algorithm for real-time private parking-sharing programs
|
Yan, Pengyu |
|
|
125 |
C |
p. |
artikel |