nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A knowledge-based approach for expediting in manufacturing facilities
|
Fink, RossLawrence |
|
1990 |
9 |
3 |
p. 429- 1 p. |
artikel |
2 |
Analysis of multi-echelon multi-indentured repairable item inventory system
|
Gupta, Amit |
|
1990 |
9 |
3 |
p. 431-432 2 p. |
artikel |
3 |
An analysis of customer satisfaction with waiting times in a two-stage service process
|
Davis, Mark M. |
|
1990 |
9 |
3 |
p. 324-334 11 p. |
artikel |
4 |
An empirical analysis of the effects of structure, behavior, and communication in a just-in-time relationship
|
Winkler, LeslieAnnRicheson |
|
1990 |
9 |
3 |
p. 427- 1 p. |
artikel |
5 |
An empirical investigation of consensus as a measure of manufacturing strategy
|
Hanna, MarkDavid |
|
1990 |
9 |
3 |
p. 423- 1 p. |
artikel |
6 |
Announcement on empirical/field-based methodologies in JOM
|
|
|
1990 |
9 |
3 |
p. 447-449 3 p. |
artikel |
7 |
Approximations for multiclass single server queues with applications to the parametric decomposition approach for solving queueing networks
|
Bhat, VasanthakumarNarasimha |
|
1990 |
9 |
3 |
p. 427-428 2 p. |
artikel |
8 |
A simulation study of dynamic planned lead times in material requirements planning systems
|
Smith, SuzanneJones |
|
1990 |
9 |
3 |
p. 430-431 2 p. |
artikel |
9 |
A stochastic model for determination of the optimal number of tools for the machine group in a flexible manufacturing system
|
Bramorski, Tomasz |
|
1990 |
9 |
3 |
p. 428-429 2 p. |
artikel |
10 |
A study of an enlarged JIT and its impact on JIT implementation and performance of the production system
|
Paek, JunHo |
|
1990 |
9 |
3 |
p. 438-439 2 p. |
artikel |
11 |
A study of quality improvement in U.K. manufacturing industry
|
Lascelles, D.M. |
|
1990 |
9 |
3 |
p. 435- 1 p. |
artikel |
12 |
Author profiles
|
|
|
1990 |
9 |
3 |
p. 441-443 3 p. |
artikel |
13 |
Back issues of the journal of operations management
|
|
|
1990 |
9 |
3 |
p. 453- 1 p. |
artikel |
14 |
Editorial philosophy
|
|
|
1990 |
9 |
3 |
p. 444-446 3 p. |
artikel |
15 |
Enhancing the customer contact model
|
Mersha, Tigineh |
|
1990 |
9 |
3 |
p. 391-405 15 p. |
artikel |
16 |
Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems
|
Sumichrast, Robert T. |
|
1990 |
9 |
3 |
p. 371-390 20 p. |
artikel |
17 |
Impact of seed machines on the cell formation decision in cellular manufacturing
|
Frazier, GregoryVincent |
|
1990 |
9 |
3 |
p. 433-434 2 p. |
artikel |
18 |
Instructions to authors
|
|
|
1990 |
9 |
3 |
p. 450-451 2 p. |
artikel |
19 |
Interfacing the loading and routing decisions for flexibility and productivity of flexible manufacturing systems
|
Chen, In-Jazz |
|
1990 |
9 |
3 |
p. 421- 1 p. |
artikel |
20 |
International manufacturing configuration and competitive priorities: Case studies in four industries
|
DuBois, FrankLatta |
|
1990 |
9 |
3 |
p. 436- 1 p. |
artikel |
21 |
Management and quality circles: Case studies in direct participation
|
Brennan, MaireCaitrionaBrighid |
|
1990 |
9 |
3 |
p. 426-427 2 p. |
artikel |
22 |
Manufacturing strategy and the environment: An analytical study
|
Kim, Jongsung |
|
1990 |
9 |
3 |
p. 434- 1 p. |
artikel |
23 |
Master production scheduling in uncertain environments
|
Lin, Neng-Pai |
|
1990 |
9 |
3 |
p. 432- 1 p. |
artikel |
24 |
On solving production scheduling problems with changeover costs using lagrangean relaxation
|
de Matta, RenatoEsteban |
|
1990 |
9 |
3 |
p. 433- 1 p. |
artikel |
25 |
On the stochastic sequential and non-sequential production planning problem
|
Rao, Shivaji |
|
1990 |
9 |
3 |
p. 424- 1 p. |
artikel |
26 |
Optimization of production systems
|
Salstrom, RogerLee |
|
1990 |
9 |
3 |
p. 425- 1 p. |
artikel |
27 |
Performance evaluation of printed circuit board manufacturing maquiladoras: A return on investment approach
|
Mailvahanan, Raju |
|
1990 |
9 |
3 |
p. 437-438 2 p. |
artikel |
28 |
Purchasing performance measurements—Views of purchasing managers, buyers and internal customers from different industries
|
Chao, Chiang-nan |
|
1990 |
9 |
3 |
p. 435-436 2 p. |
artikel |
29 |
Real time MRP with optimization of manufacturing capacity utilization
|
Sinulingga, Sukaria |
|
1990 |
9 |
3 |
p. 422- 1 p. |
artikel |
30 |
Scheduling of job shops with buffer restrictions
|
Khosla, InderSheelKumar |
|
1990 |
9 |
3 |
p. 437- 1 p. |
artikel |
31 |
Scheduling of jobs on computerized document processors in a bank check processing system
|
Paul, JyotiPrakash |
|
1990 |
9 |
3 |
p. 430- 1 p. |
artikel |
32 |
Scheduling random flexible manufacturing systems with dynamic environments
|
Hutchison, Jim |
|
1990 |
9 |
3 |
p. 335-351 17 p. |
artikel |
33 |
Setup time reduction in batch manufacturing under stochastic demand
|
Jha, Shailendra |
|
1990 |
9 |
3 |
p. 423-424 2 p. |
artikel |
34 |
Shift scheduling in services when employees have limited availability: An L.P. approach
|
Thompson, Gary M. |
|
1990 |
9 |
3 |
p. 352-370 19 p. |
artikel |
35 |
Status and structure of quality and reliability management systems: Investigations of the organization and structure of reliability and quality management systems in UK and European industries to establish benefits of such programs and the interrelationship between them
|
Abed, MahfoudHamdoon |
|
1990 |
9 |
3 |
p. 425-426 2 p. |
artikel |
36 |
Subscription renewal journal of operations management
|
|
|
1990 |
9 |
3 |
p. 452- 1 p. |
artikel |
37 |
The amoebic matrix and one-dimensional machine location problems
|
Sarker, BhabaR. |
|
1990 |
9 |
3 |
p. 439-440 2 p. |
artikel |
38 |
The effect of inventory decisions and parameters on the opportunity cost of capital
|
Singhal, Vinod R. |
|
1990 |
9 |
3 |
p. 406-420 15 p. |
artikel |