nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A dispute on James R. Evans' “an efficient implementation of the Wagner Whitin algorithm for dynamic lot-sizing,” journal of operations management, vol. 5, no. 2, February 1985
|
Chong, Philip S. |
|
1987 |
7 |
1-2 |
p. 27-31 5 p. |
artikel |
2 |
Alternative master production scheduling techniques in an assemble-to-order environment
|
King, Barry E. |
|
1987 |
7 |
1-2 |
p. 179-201 23 p. |
artikel |
3 |
A natural starting strategy for Aronson's heuristic 1 for solving the deterministic, single operator, multiple machine, multiple run cyclic scheduling
|
Aronson, Jay E. |
|
1987 |
7 |
1-2 |
p. 87-90 4 p. |
artikel |
4 |
An experimental investigation of FMS scheduling rules under uncertainty
|
Denzler, David R. |
|
1987 |
7 |
1-2 |
p. 139-151 13 p. |
artikel |
5 |
An optimal algorithm for the quantity discount problem
|
Chung, Chia-Shin |
|
1987 |
7 |
1-2 |
p. 165-177 13 p. |
artikel |
6 |
A simple and robust model for computing the service level impact of lot sizes in continuous and lumpy demand contexts
|
Etienne, Eisenhower C. |
|
1987 |
7 |
1-2 |
p. 1-9 9 p. |
artikel |
7 |
A table for the calculation of safety stock
|
Aucamp, Donald C. |
|
1987 |
7 |
1-2 |
p. 153-163 11 p. |
artikel |
8 |
Choosing optimal buffering strategies for dealing with uncertainty in MRP
|
Etienne, Eisenhower C. |
|
1987 |
7 |
1-2 |
p. 107-120 14 p. |
artikel |
9 |
Decision support systems (DSS) design for operations managers: an empirical study of the impact of report design and decision style on effective choice
|
Davis, Donald L. |
|
1987 |
7 |
1-2 |
p. 47-62 16 p. |
artikel |
10 |
Editorial Board
|
|
|
1987 |
7 |
1-2 |
p. i- 1 p. |
artikel |
11 |
Implementing multiple criteria ABC analysis
|
Flores, Benito E. |
|
1987 |
7 |
1-2 |
p. 79-85 7 p. |
artikel |
12 |
Maximizing the net present value of a project subject to materials and capital constraints
|
Smith-Daniels, Dwight E. |
|
1987 |
7 |
1-2 |
p. 33-45 13 p. |
artikel |
13 |
Operations management taxonomy
|
Prentis, Eric L. |
|
1987 |
7 |
1-2 |
p. 63-78 16 p. |
artikel |
14 |
Repetitive lots: The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops
|
Flynn, Barbara B. |
|
1987 |
7 |
1-2 |
p. 203-216 14 p. |
artikel |
15 |
The complementary nature of manufacturing goals by their relationship to throughput time: A theory of internal variability of production systems
|
Wacker, John G. |
|
1987 |
7 |
1-2 |
p. 91-106 16 p. |
artikel |
16 |
The sources, measurements, and managerial implications of process commonality
|
Treleven, Mark |
|
1987 |
7 |
1-2 |
p. 11-25 15 p. |
artikel |
17 |
The use of cost-based priorities in random and flow shops
|
Scudder, Gary D. |
|
1987 |
7 |
1-2 |
p. 217-232 16 p. |
artikel |
18 |
Towards a theory of manufacturing overhead cost behavior: A conceptual and empirical analysis
|
Raffi, Farshad |
|
1987 |
7 |
1-2 |
p. 121-137 17 p. |
artikel |