nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Applications of decision support and expert systems in flexible manufacturing systems
|
Turban, Efraim |
|
1986 |
6 |
3-4 |
p. 433-448 16 p. |
artikel |
2 |
A reformulation of the aggregate planning problem
|
Schroeder, Roger G. |
|
1986 |
6 |
3-4 |
p. 245-256 12 p. |
artikel |
3 |
Developing maintenance craft labor efficiency through an integrated planning and control system: A prescriptive model
|
Finch, Byron J. |
|
1986 |
6 |
3-4 |
p. 449-459 11 p. |
artikel |
4 |
Expert systems in production management: An assessment
|
Mertens, Peter |
|
1986 |
6 |
3-4 |
p. 393-404 12 p. |
artikel |
5 |
Exponentially smoothed regression analysis for demand forecasting
|
Roodman, Gary M. |
|
1986 |
6 |
3-4 |
p. 485-497 13 p. |
artikel |
6 |
Getting from “just-in-case” to “just-in-time”: Insights from a simple model
|
Suri, Rajan |
|
1986 |
6 |
3-4 |
p. 295-304 10 p. |
artikel |
7 |
Manufacturing strategy: Its assessment and practice
|
Swamidass, Paul M. |
|
1986 |
6 |
3-4 |
p. 471-484 14 p. |
artikel |
8 |
Methods of cell formation in group technology: A framework for evaluation
|
Vakharia, Asoo J. |
|
1986 |
6 |
3-4 |
p. 257-271 15 p. |
artikel |
9 |
Optimal technology choice in a dynamic-stochastic environment
|
Cohen, Morris A. |
|
1986 |
6 |
3-4 |
p. 317-331 15 p. |
artikel |
10 |
Overlapping operations in material requirements planning
|
Graves, S.C. |
|
1986 |
6 |
3-4 |
p. 283-294 12 p. |
artikel |
11 |
Production lot sizing for deterministic rolling schedules
|
Bookbinder, James H. |
|
1986 |
6 |
3-4 |
p. 349-362 14 p. |
artikel |
12 |
Production scheduling with capacity-constrained transportation activities
|
Truscott, William G. |
|
1986 |
6 |
3-4 |
p. 333-348 16 p. |
artikel |
13 |
Reducing vendor delivery uncertainties in a JIT environment
|
Hill, Arthur V. |
|
1986 |
6 |
3-4 |
p. 381-392 12 p. |
artikel |
14 |
Staffing and equipment decisions for services: An experimental analysis
|
Mabert, Vincent A. |
|
1986 |
6 |
3-4 |
p. 273-281 9 p. |
artikel |
15 |
The content of manufacturing strategy: An empirical study
|
Schroeder, Roger G. |
|
1986 |
6 |
3-4 |
p. 405-415 11 p. |
artikel |
16 |
The retail inventory method: The third major costing system
|
Wayne Corcoran, A. |
|
1986 |
6 |
3-4 |
p. 417-431 15 p. |
artikel |
17 |
The trade-off between the net present cost of a project and the probability to complete it on schedule
|
Shtub, Avraham |
|
1986 |
6 |
3-4 |
p. 461-470 10 p. |
artikel |
18 |
The use of simulation in system design: A case study using the precision location strike system
|
Clark Jr., Thomas D. |
|
1986 |
6 |
3-4 |
p. 363-379 17 p. |
artikel |
19 |
Toward a better understanding of lead times in MRP systems
|
Kanet, John J. |
|
1986 |
6 |
3-4 |
p. 305-315 11 p. |
artikel |