nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Acknowledgements
|
|
|
1989 |
47-48 |
4 |
p. 395-400 6 p. |
artikel |
2 |
Acknowledgments
|
|
|
1991 |
47-48 |
4 |
p. 555-561 7 p. |
artikel |
3 |
Acknowledgments
|
|
|
1981 |
47-48 |
4 |
p. iii- 1 p. |
artikel |
4 |
Acknowledgments
|
|
|
1990 |
47-48 |
4 |
p. 615-622 8 p. |
artikel |
5 |
A clarification on conceptual and methodological issues related to the Job Characteristics Model
|
Rungtusanatham, Manus |
|
1996 |
47-48 |
4 |
p. 357-367 11 p. |
artikel |
6 |
A clarification on conceptual and methodological issues related to the Job Characteristics Model: A reply
|
Tepper, Bennett J. |
|
1996 |
47-48 |
4 |
p. 369-372 4 p. |
artikel |
7 |
A conceptual framework for tackling knowable unknown unknowns in project management
|
Ramasesh, Ranga V. |
|
2014 |
47-48 |
4 |
p. 190-204 15 p. |
artikel |
8 |
A critical evaluation of alternative methods and paradigms for conducting mediation analysis in operations management research
|
Malhotra, Manoj K. |
|
2014 |
47-48 |
4 |
p. 127-137 11 p. |
artikel |
9 |
Activity summary for 1990
|
|
|
1990 |
47-48 |
4 |
p. 623-625 3 p. |
artikel |
10 |
Activity summary for 1989
|
|
|
1989 |
47-48 |
4 |
p. 401-403 3 p. |
artikel |
11 |
A definition of theory: research guidelines for different theory-building research methods in operations management
|
Wacker, John G |
|
1998 |
47-48 |
4 |
p. 361-385 25 p. |
artikel |
12 |
Advanced manufacturing technology: Implementation policy and performance
|
Small, Michael H. |
|
1997 |
47-48 |
4 |
p. 349-370 22 p. |
artikel |
13 |
A framework for quality management research and an associated measurement instrument
|
Flynn, Barbara B. |
|
1994 |
47-48 |
4 |
p. 339-366 28 p. |
artikel |
14 |
A framework for strategic service management
|
Kellogg, Deborah L. |
|
1995 |
47-48 |
4 |
p. 323-337 15 p. |
artikel |
15 |
Agent-system co-development in supply chain research: Propositions and demonstrative findings
|
Tangpong, Chanchai |
|
2014 |
47-48 |
4 |
p. 154-174 21 p. |
artikel |
16 |
Agile manufacturing: Relation to JIT, operational performance and firm performance
|
Inman, R. Anthony |
|
2011 |
47-48 |
4 |
p. 343-355 13 p. |
artikel |
17 |
Alternative research paradigms in operations
|
Meredith, Jack R. |
|
1989 |
47-48 |
4 |
p. 297-326 30 p. |
artikel |
18 |
A meta-analysis model of manufacturing capabilities
|
White, Gregory P. |
|
1996 |
47-48 |
4 |
p. 315-331 17 p. |
artikel |
19 |
A methodology for predicting single-stage lot-sizing performance: Analysis and experiments
|
Blackburn, Joseph D. |
|
1985 |
47-48 |
4 |
p. 433-448 16 p. |
artikel |
20 |
Analysis and improvement of delivery operations at the San Francisco Public Library
|
Apte, Uday M. |
|
2006 |
47-48 |
4 |
p. 325-346 |
artikel |
21 |
Analyzing the priorities of JIT activities
|
|
|
1989 |
47-48 |
4 |
p. 388- 1 p. |
artikel |
22 |
An analysis of facilitators for JIT production in a job shop: An empirical study
|
|
|
1989 |
47-48 |
4 |
p. 387- 1 p. |
artikel |
23 |
An assessment of survey research in POM: from constructs to theory
|
Malhotra, Manoj K |
|
1998 |
47-48 |
4 |
p. 407-425 19 p. |
artikel |
24 |
An empirical analysis of job shop dispatch rule selection
|
Green, Gary I. |
|
1981 |
47-48 |
4 |
p. 197-203 7 p. |
artikel |
25 |
An empirical study of buyer/seller relationships in U.S. manufacturing firms
|
|
|
1989 |
47-48 |
4 |
p. 394- 1 p. |
artikel |
26 |
An empirical test of the causal relationships in the Baldrige Health Care Pilot Criteria
|
Meyer, Susan M |
|
2001 |
47-48 |
4 |
p. 403-426 24 p. |
artikel |
27 |
An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system
|
Mahmoodi, Farzad |
|
1990 |
47-48 |
4 |
p. 548-573 26 p. |
artikel |
28 |
An examination of ISO 9000:2000 and supply chain quality assurance
|
Sroufe, Robert |
|
2008 |
47-48 |
4 |
p. 503-520 18 p. |
artikel |
29 |
An examination of quality management in Japan: Implications for management in the United States
|
Ebrahimpour, Maling |
|
1985 |
47-48 |
4 |
p. 419-431 13 p. |
artikel |
30 |
An examination of the relationships between JIT and financial performance
|
Fullerton, Rosemary R. |
|
2003 |
47-48 |
4 |
p. 383-404 22 p. |
artikel |
31 |
An experimental comparison of human schedulers and heuristic algorithms for the traveling salesman problem
|
Hill, Arthur V. |
|
1982 |
47-48 |
4 |
p. 215-223 9 p. |
artikel |
32 |
An exploration of supplier selection practices across the supply chain
|
Choi, Thomas Y. |
|
1996 |
47-48 |
4 |
p. 333-343 11 p. |
artikel |
33 |
An investigation of multi-echelon inventory control systems
|
|
|
1989 |
47-48 |
4 |
p. 389- 1 p. |
artikel |
34 |
ANNOUNCEMENT
|
|
|
2001 |
47-48 |
4 |
p. 395- 1 p. |
artikel |
35 |
Announcement
|
|
|
2006 |
47-48 |
4 |
p. v-vi |
artikel |
36 |
Announcement on empirical/field-based methodologies in JOM
|
|
|
1991 |
47-48 |
4 |
p. 565-567 3 p. |
artikel |
37 |
Announcement on empirical/field-based methodologies in JOM
|
|
|
1989 |
47-48 |
4 |
p. 294-296 3 p. |
artikel |
38 |
A note on using the lot-sizing index for comparing discrete lot-sizing techniques
|
Jesse Jr., Richard R. |
|
1985 |
47-48 |
4 |
p. 461-464 4 p. |
artikel |
39 |
A note on workload-dependent due date assignment rules
|
Ragatz, Gary L. |
|
1989 |
47-48 |
4 |
p. 377-384 8 p. |
artikel |
40 |
Applying operations management logic and tools to save lives: A case study of the World Health Organization's Global Drug Facility
|
de Treville, Suzanne |
|
2006 |
47-48 |
4 |
p. 397-406 |
artikel |
41 |
Applying survival analysis to operations management: Analyzing the differences in donor classes in the blood donation process
|
Melnyk, Steven A. |
|
1995 |
47-48 |
4 |
p. 339-356 18 p. |
artikel |
42 |
Approaches to the factory of the future. An empirical taxonomy
|
Boyer, Kenneth K. |
|
1996 |
47-48 |
4 |
p. 297-313 17 p. |
artikel |
43 |
A procedure for dealing with multiple objectives in cell formation decisions
|
Frazier, Gregory V. |
|
1990 |
47-48 |
4 |
p. 465-480 16 p. |
artikel |
44 |
A replication and extension of quality management into the supply chain
|
Kaynak, Hale |
|
2008 |
47-48 |
4 |
p. 468-489 22 p. |
artikel |
45 |
A resource allocation problem with the aid of an integer zero-one programming model in the plastics industry
|
Mehrez, Abraham |
|
1985 |
47-48 |
4 |
p. 455-460 6 p. |
artikel |
46 |
A revenue management approach to demand management and order booking in assemble-to-order manufacturing
|
deB. Harris, Frederick H. |
|
1995 |
47-48 |
4 |
p. 299-309 11 p. |
artikel |
47 |
A review of empirical research on manufacturing flexibility
|
Vokurka, Robert J |
|
2000 |
47-48 |
4 |
p. 485-501 17 p. |
artikel |
48 |
Assemble-to-order manufacturing: Implications for materials management
|
Wemmerlöv, Urban |
|
1984 |
47-48 |
4 |
p. 347-368 22 p. |
artikel |
49 |
Assembly line design with incompatible task assignments
|
Rachamadugu, Ram |
|
1991 |
47-48 |
4 |
p. 469-487 19 p. |
artikel |
50 |
Assessing the impact of alternative manufacturing layouts in a service setting
|
Pagell, Mark |
|
2004 |
47-48 |
4 |
p. 413-429 17 p. |
artikel |
51 |
Assessing the impact of JIT using economic theory
|
Brox, James A. |
|
1997 |
47-48 |
4 |
p. 371-388 18 p. |
artikel |
52 |
A theory of purchasing's contribution to business performance
|
González-Benito, Javier |
|
2007 |
47-48 |
4 |
p. 901-917 17 p. |
artikel |
53 |
Author index of volume 13
|
|
|
1995 |
47-48 |
4 |
p. 363-364 2 p. |
artikel |
54 |
Author index of volume 14
|
|
|
1996 |
47-48 |
4 |
p. 377-378 2 p. |
artikel |
55 |
Author index of volume 15
|
|
|
1997 |
47-48 |
4 |
p. 411-412 2 p. |
artikel |
56 |
Author index volume 11
|
|
|
1994 |
47-48 |
4 |
p. 419-420 2 p. |
artikel |
57 |
Author profiles
|
|
|
1991 |
47-48 |
4 |
p. 552-554 3 p. |
artikel |
58 |
Author profiles
|
|
|
1990 |
47-48 |
4 |
p. 612-614 3 p. |
artikel |
59 |
A volume and material handling cost based heuristic for designing cellular manufacturing cells
|
Ahmed, Mesbah U. |
|
1991 |
47-48 |
4 |
p. 488-511 24 p. |
artikel |
60 |
Back issues of Journal of Operations Management
|
|
|
1990 |
47-48 |
4 |
p. 642-644 3 p. |
artikel |
61 |
Barriers to the management of international operations
|
Klassen, Robert D. |
|
1994 |
47-48 |
4 |
p. 385-396 12 p. |
artikel |
62 |
Batch production scheduling
|
|
|
1989 |
47-48 |
4 |
p. 390- 1 p. |
artikel |
63 |
“Black-box” and “gray-box” supplier integration in product development: Antecedents, consequences and the moderating role of firm size
|
Koufteros, Xenophon A. |
|
2007 |
47-48 |
4 |
p. 847-870 24 p. |
artikel |
64 |
Bracing for demand shocks: An experimental investigation
|
Tokar, Travis |
|
2014 |
47-48 |
4 |
p. 205-216 12 p. |
artikel |
65 |
Bringing judgment into combination forecasts
|
Sanders, Nada R. |
|
1995 |
47-48 |
4 |
p. 311-321 11 p. |
artikel |
66 |
Building operations management theory through case and field research
|
Meredith, Jack |
|
1998 |
47-48 |
4 |
p. 441-454 14 p. |
artikel |
67 |
CALL FOR PAPERS
|
|
|
2001 |
47-48 |
4 |
p. 513-514 2 p. |
artikel |
68 |
Call for papers
|
|
|
1995 |
47-48 |
4 |
p. 357- 1 p. |
artikel |
69 |
Call for papers
|
|
|
1997 |
47-48 |
4 |
p. 405-406 2 p. |
artikel |
70 |
Call for Papers
|
|
|
2008 |
47-48 |
4 |
p. 555-556 2 p. |
artikel |
71 |
Call for Papers
|
|
|
2011 |
47-48 |
4 |
p. I- 1 p. |
artikel |
72 |
Call for papers
|
|
|
1981 |
47-48 |
4 |
p. v- 1 p. |
artikel |
73 |
Call for papers: Empirical studies in service operations management
|
|
|
1990 |
47-48 |
4 |
p. 462-463 2 p. |
artikel |
74 |
Call for Papers: Offshoring of Service and Knowledge Work
|
|
|
2004 |
47-48 |
4 |
p. 431-432 2 p. |
artikel |
75 |
Call for Papers: OM Replication Research
|
|
|
2003 |
47-48 |
4 |
p. 491-492 2 p. |
artikel |
76 |
Call for Papers: Operations Managemant in Not-for-Profit Public and Government Services
|
|
|
2003 |
47-48 |
4 |
p. 493-494 2 p. |
artikel |
77 |
Call for papers—special issue on economics of operations management
|
|
|
1994 |
47-48 |
4 |
p. 411- 1 p. |
artikel |
78 |
Capacitated heuristic program for multiactivity, multi-facility system designs
|
Khumawala, Basheer M. |
|
1984 |
47-48 |
4 |
p. 295-304 10 p. |
artikel |
79 |
Configurations in manufacturing strategy: a review and directions for future research
|
Bozarth, Cecil |
|
1998 |
47-48 |
4 |
p. 427-439 13 p. |
artikel |
80 |
Constrained resource project scheduling subject to material constraints
|
Smith-Daniels, Dwight E. |
|
1984 |
47-48 |
4 |
p. 369-387 19 p. |
artikel |
81 |
Contents volume 11
|
|
|
1994 |
47-48 |
4 |
p. 421-422 2 p. |
artikel |
82 |
Contingency relationships of firm size, TQM duration, unionization, and industry context on TQM implementation—A focus on total effects
|
Jayaram, Jayanth |
|
2010 |
47-48 |
4 |
p. 345-356 12 p. |
artikel |
83 |
Coordinating two suppliers with offsetting lead time and price performance
|
Lau, Hon-Shiang |
|
1994 |
47-48 |
4 |
p. 327-337 11 p. |
artikel |
84 |
Corrigendum to “Alignment of strategic priorities and performance: an integration of operations and strategic management perspective”
|
Joshi, Maheshkumar P. |
|
2003 |
47-48 |
4 |
p. 489- 1 p. |
artikel |
85 |
Cumulative contents of volume 13
|
|
|
1995 |
47-48 |
4 |
p. 365-366 2 p. |
artikel |
86 |
Cumulative contents of volume 14
|
|
|
1996 |
47-48 |
4 |
p. 379-380 2 p. |
artikel |
87 |
Cumulative contents of volume 15
|
|
|
1997 |
47-48 |
4 |
p. 413-414 2 p. |
artikel |
88 |
Currently practiced formulations for the assembly line balance problem
|
Gunther, Richard E |
|
1983 |
47-48 |
4 |
p. 209-221 13 p. |
artikel |
89 |
Customer-facing supply chain practices—The impact of demand and distribution management on supply chain success
|
Rexhausen, Daniel |
|
2012 |
47-48 |
4 |
p. 269-281 13 p. |
artikel |
90 |
Defining and developing measures of lean production
|
Shah, Rachna |
|
2007 |
47-48 |
4 |
p. 785-805 21 p. |
artikel |
91 |
Design of an interrelated quality system for a single product manufacturing process with assembly
|
Knowles, Thomas W. |
|
1981 |
47-48 |
4 |
p. 225-235 11 p. |
artikel |
92 |
Dimensions of manufacturing strength in the furniture industry
|
Vickery, Shawnee K. |
|
1997 |
47-48 |
4 |
p. 317-330 14 p. |
artikel |
93 |
Dissertation abstracts
|
|
|
1990 |
47-48 |
4 |
p. 599-611 13 p. |
artikel |
94 |
Economic analysis of flexible manufacturing systems
|
|
|
1989 |
47-48 |
4 |
p. 393- 1 p. |
artikel |
95 |
Economic justification of group technology software: Documentation and analysis of current practices
|
Wemmerlöv, Urban |
|
1990 |
47-48 |
4 |
p. 500-525 26 p. |
artikel |
96 |
Editorial
|
|
|
1999 |
47-48 |
4 |
p. 369-376 8 p. |
artikel |
97 |
Editorial advisory board
|
|
|
1991 |
47-48 |
4 |
p. 438-439 2 p. |
artikel |
98 |
Editorial advisory board
|
|
|
1990 |
47-48 |
4 |
p. 456-457 2 p. |
artikel |
99 |
Editorial Board
|
|
|
2010 |
47-48 |
4 |
p. CO2- 1 p. |
artikel |
100 |
Editorial Board
|
|
|
2013 |
47-48 |
4 |
p. iii- 1 p. |
artikel |
101 |
Editorial Board
|
|
|
2013 |
47-48 |
4 |
p. CO2- 1 p. |
artikel |
102 |
Editorial Board
|
|
|
2014 |
47-48 |
4 |
p. CO2- 1 p. |
artikel |
103 |
Editorial Board
|
|
|
2009 |
47-48 |
4 |
p. CO2- 1 p. |
artikel |
104 |
Editorial Board
|
|
|
2007 |
47-48 |
4 |
p. CO2- 1 p. |
artikel |
105 |
Editorial Board
|
|
|
2008 |
47-48 |
4 |
p. CO2- 1 p. |
artikel |
106 |
Editorial Board
|
|
|
2006 |
47-48 |
4 |
p. CO2 |
artikel |
107 |
Editorial Board
|
|
|
2011 |
47-48 |
4 |
p. CO2- 1 p. |
artikel |
108 |
Editorial Board
|
|
|
2012 |
47-48 |
4 |
p. CO2- 1 p. |
artikel |
109 |
Editorial Philosophy
|
|
|
2003 |
47-48 |
4 |
p. 495-496 2 p. |
artikel |
110 |
Editorial Philosophy
|
|
|
2002 |
47-48 |
4 |
p. 409-410 2 p. |
artikel |
111 |
Editorial philosophy
|
|
|
1991 |
47-48 |
4 |
p. 562-564 3 p. |
artikel |
112 |
Editorial philosophy
|
|
|
1994 |
47-48 |
4 |
p. 413-414 2 p. |
artikel |
113 |
Editorial philosophy
|
|
|
1995 |
47-48 |
4 |
p. 359-360 2 p. |
artikel |
114 |
Editorial philosophy
|
|
|
1996 |
47-48 |
4 |
p. 373-374 2 p. |
artikel |
115 |
Editorial philosophy
|
|
|
1997 |
47-48 |
4 |
p. 407-408 2 p. |
artikel |
116 |
Editorial philosophy
|
|
|
1990 |
47-48 |
4 |
p. 626-628 3 p. |
artikel |
117 |
Editorial philosophy
|
|
|
1989 |
47-48 |
4 |
p. 404-406 3 p. |
artikel |
118 |
Editorial Philosphy
|
|
|
2004 |
47-48 |
4 |
p. 433-434 2 p. |
artikel |
119 |
Editorial Review Board
|
|
|
2014 |
47-48 |
4 |
p. iii- 1 p. |
artikel |
120 |
Editorial review board
|
|
|
1991 |
47-48 |
4 |
p. 440-443 4 p. |
artikel |
121 |
Editorial review board
|
|
|
1990 |
47-48 |
4 |
p. 456-461 6 p. |
artikel |
122 |
Editor's comment
|
Ebert, Ronald J. |
|
1991 |
47-48 |
4 |
p. 444- 1 p. |
artikel |
123 |
ED.PHILOSOPHY
|
|
|
2001 |
47-48 |
4 |
p. 515-516 2 p. |
artikel |
124 |
Effect of service supplier performance on satisfaction and loyalty of store managers in the fast food industry
|
Stank, Theodore P |
|
1999 |
47-48 |
4 |
p. 429-447 19 p. |
artikel |
125 |
Effects of operating characteristics on work-in-progress in batch manufacturing systems
|
|
|
1989 |
47-48 |
4 |
p. 385- 1 p. |
artikel |
126 |
Emergency ambulance location using the contiguous zone search routine
|
Fitzsimmons, James A. |
|
1982 |
47-48 |
4 |
p. 225-237 13 p. |
artikel |
127 |
Empirical simulation studies in operations management: context, trends, and research opportunities
|
Shafer, Scott M |
|
2004 |
47-48 |
4 |
p. 345-354 10 p. |
artikel |
128 |
Estimating service level impacts from changes in cycle count, buffer stock, or corrective action
|
Morey, Richard C. |
|
1985 |
47-48 |
4 |
p. 411-418 8 p. |
artikel |
129 |
Examining the impact of information technology and patient flow on healthcare performance: A Theory of Swift and Even Flow (TSEF) perspective
|
Devaraj, Sarv |
|
2013 |
47-48 |
4 |
p. 181-192 12 p. |
artikel |
130 |
Factors affecting supplier quality performance
|
Forker, L.B. |
|
1997 |
47-48 |
4 |
p. 243-269 27 p. |
artikel |
131 |
Flexible bed allocation and performance in the intensive care unit
|
Seung-Chul, Kim |
|
2000 |
47-48 |
4 |
p. 427-443 17 p. |
artikel |
132 |
Forecasting for solid wastes operations
|
Westerman, Robert R. |
|
1981 |
47-48 |
4 |
p. 183-195 13 p. |
artikel |
133 |
Formal control and social control in domestic and international buyer–supplier relationships
|
Li, Yuan |
|
2010 |
47-48 |
4 |
p. 333-344 12 p. |
artikel |
134 |
Generic manufacturing strategies: an empirical test of two configurational typologies
|
Devaraj, Sarv |
|
2001 |
47-48 |
4 |
p. 427-452 26 p. |
artikel |
135 |
Goal programming applied to police patrol allocation
|
Saladin, Brooke A. |
|
1982 |
47-48 |
4 |
p. 239-249 11 p. |
artikel |
136 |
Governing buyer–supplier relationships through transactional and relational mechanisms: Evidence from China
|
Liu, Yi |
|
2009 |
47-48 |
4 |
p. 294-309 16 p. |
artikel |
137 |
‘Green’ value chain practices in the furniture industry
|
Handfield, Robert B |
|
1997 |
47-48 |
4 |
p. 293-315 23 p. |
artikel |
138 |
Guide for Authors
|
|
|
2003 |
47-48 |
4 |
p. 497-499 3 p. |
artikel |
139 |
Guide for Authors
|
|
|
2002 |
47-48 |
4 |
p. 411-413 3 p. |
artikel |
140 |
GUIDE FOR AUTHORS
|
|
|
2001 |
47-48 |
4 |
p. 517-519 3 p. |
artikel |
141 |
Guide for authors
|
|
|
1994 |
47-48 |
4 |
p. 415-417 3 p. |
artikel |
142 |
Guide for Authors
|
|
|
2004 |
47-48 |
4 |
p. 435-437 3 p. |
artikel |
143 |
Hopes for the future of operations management
|
Meredith, Jack R. |
|
2001 |
47-48 |
4 |
p. 397-402 6 p. |
artikel |
144 |
IFC-Editorial Board
|
|
|
2003 |
47-48 |
4 |
p. IFC- 1 p. |
artikel |
145 |
IFC- Editorial Board
|
|
|
2004 |
47-48 |
4 |
p. IFC- 1 p. |
artikel |
146 |
Impact of role in the decision to fail: An exploratory study of terminated projects
|
Dilts, David M. |
|
2006 |
47-48 |
4 |
p. 378-396 |
artikel |
147 |
Improved implementation of inventory control models through equivalent formulations
|
Oral, Muhittin |
|
1981 |
47-48 |
4 |
p. 173-181 9 p. |
artikel |
148 |
Index to volume 9 (1990)
|
|
|
1990 |
47-48 |
4 |
p. 634-636 3 p. |
artikel |
149 |
Index to volume 9 (1990)
|
|
|
1990 |
47-48 |
4 |
p. 637-640 4 p. |
artikel |
150 |
Index to volume 10 (1991), author listing
|
|
|
1991 |
47-48 |
4 |
p. 570-573 4 p. |
artikel |
151 |
Index to volumes 1–8 (1980–1989)
|
|
|
1989 |
47-48 |
4 |
p. 421-448 28 p. |
artikel |
152 |
Index to volumes 1–8 (1980–1989) Author listing
|
|
|
1989 |
47-48 |
4 |
p. 409-420 12 p. |
artikel |
153 |
Index to volume 10 (1991), subject listing
|
|
|
1991 |
47-48 |
4 |
p. 574-578 5 p. |
artikel |
154 |
Infrastructure and flexible manufacturing technology: Theory development
|
Maffei, Mary Jo |
|
1995 |
47-48 |
4 |
p. 273-298 26 p. |
artikel |
155 |
Innovation implementation in high technology manufacturing: A chaos-theoretic empirical analysis
|
Jayanthi, Shekhar |
|
1998 |
47-48 |
4 |
p. 471-494 24 p. |
artikel |
156 |
Innovation-supportive culture: The impact of organizational values on process innovation
|
Khazanchi, Shalini |
|
2007 |
47-48 |
4 |
p. 871-884 14 p. |
artikel |
157 |
I@nnovative operations management applications in not-for-profit, public and government services
|
Verma, Rohit |
|
2006 |
47-48 |
4 |
p. 301-303 |
artikel |
158 |
Insights into factors affecting Production and Operations Management (POM) journal evaluation
|
Theoharakis, Vasilis |
|
2007 |
47-48 |
4 |
p. 932-955 24 p. |
artikel |
159 |
Instructions to authors
|
Mertens, Charles |
|
1991 |
47-48 |
4 |
p. 568-569 2 p. |
artikel |
160 |
Instructions to authors
|
Krajewski, Lee |
|
1981 |
47-48 |
4 |
p. vii- 1 p. |
artikel |
161 |
Instructions to authors
|
|
|
1989 |
47-48 |
4 |
p. 407-408 2 p. |
artikel |
162 |
Instructions to authors
|
|
|
1990 |
47-48 |
4 |
p. 632-633 2 p. |
artikel |
163 |
Integrated product development practices and competitive capabilities: the effects of uncertainty, equivocality, and platform strategy
|
Koufteros, Xenophon A. |
|
2002 |
47-48 |
4 |
p. 331-355 25 p. |
artikel |
164 |
Integrating manufacturing strategy and technology choice
|
|
|
1989 |
47-48 |
4 |
p. 392- 1 p. |
artikel |
165 |
Integrating service design principles and information technology to improve delivery and productivity in public sector operations: The case of the South Carolina DMV
|
Karwan, Kirk R. |
|
2006 |
47-48 |
4 |
p. 347-362 |
artikel |
166 |
Interfaces in service modularity: A typology developed in modular health care provision
|
de Blok, Carolien |
|
2014 |
47-48 |
4 |
p. 175-189 15 p. |
artikel |
167 |
International diversification of manufacturing operations: Performance implications and moderating forces
|
Lampel, Joseph |
|
2013 |
47-48 |
4 |
p. 213-227 15 p. |
artikel |
168 |
Introduction to special issue
|
Shafer, Scott M |
|
2004 |
47-48 |
4 |
p. 341-343 3 p. |
artikel |
169 |
In union lies strength: Collaborative competence in new product development and its performance effects
|
Mishra, Anant A. |
|
2009 |
47-48 |
4 |
p. 324-338 15 p. |
artikel |
170 |
Irregular workloads with MRP systems: Some causes and consequences
|
N. Bott, Kevin |
|
1983 |
47-48 |
4 |
p. 169-182 14 p. |
artikel |
171 |
Iterative triangulation: a theory development process using existing case studies
|
Lewis, Marianne W |
|
1998 |
47-48 |
4 |
p. 455-469 15 p. |
artikel |
172 |
JIT purchasing and performance: an exploratory analysis of buyer and supplier perspectives
|
Dong, Yan |
|
2001 |
47-48 |
4 |
p. 471-483 13 p. |
artikel |
173 |
Lean, leaner, too lean? The inventory-performance link revisited
|
Eroglu, Cuneyt |
|
2011 |
47-48 |
4 |
p. 356-369 14 p. |
artikel |
174 |
Letter from the editors
|
Hill, Arthur V. |
|
1994 |
47-48 |
4 |
p. 323- 1 p. |
artikel |
175 |
Linking performance drivers in production planning and inventory control to process choice
|
Safizadeh, M.Hossein |
|
1997 |
47-48 |
4 |
p. 389-403 15 p. |
artikel |
176 |
Linking the customer contact model to service quality
|
Soteriou, Andreas C |
|
1998 |
47-48 |
4 |
p. 495-508 14 p. |
artikel |
177 |
Load smoothing by the planning and order review/release systems: A simulation experiment
|
Melnyk, Steven A. |
|
1991 |
47-48 |
4 |
p. 512-523 12 p. |
artikel |
178 |
Management initiatives and just-in-time manufacturing
|
McLachlin, Ron |
|
1997 |
47-48 |
4 |
p. 271-292 22 p. |
artikel |
179 |
Manufacturing technology and strategy formulation: keys to enhancing competitiveness and improving performance
|
Tracey, Michael |
|
1999 |
47-48 |
4 |
p. 411-428 18 p. |
artikel |
180 |
May you live in interesting times…the emergence of theory-driven empirical research
|
Melnyk, Steven A |
|
1998 |
47-48 |
4 |
p. 311-319 9 p. |
artikel |
181 |
Measurement of manufacturing flexibility: A value based approach
|
Ramasesh, Ranga V. |
|
1991 |
47-48 |
4 |
p. 446-468 23 p. |
artikel |
182 |
Method and context perspectives on learning and knowledge creation in quality management
|
Choo, Adrian S. |
|
2007 |
47-48 |
4 |
p. 918-931 14 p. |
artikel |
183 |
Monitoring and improving the productivity of semi-autonomous human service units
|
Talukdar, Rahim B. |
|
1985 |
47-48 |
4 |
p. 375-393 19 p. |
artikel |
184 |
MRP strategies: Effects on cash flow
|
Veral, Emre A. |
|
1989 |
47-48 |
4 |
p. 364-376 13 p. |
artikel |
185 |
MRP with high uncertain yield losses
|
New, Colin |
|
1984 |
47-48 |
4 |
p. 315-330 16 p. |
artikel |
186 |
New service development competence in retail banking: Construct development and measurement validation
|
Menor, Larry J. |
|
2007 |
47-48 |
4 |
p. 825-846 22 p. |
artikel |
187 |
On apportioning costs to customers in centralized continuous review inventory systems
|
Gerchak, Yigal |
|
1991 |
47-48 |
4 |
p. 546-551 6 p. |
artikel |
188 |
On “Currently Practiced Formulations of the Assembly Line Balance Problem”
|
Baybars, Ilker |
|
1985 |
47-48 |
4 |
p. 449-453 5 p. |
artikel |
189 |
On the alignment of the purposes and views of process models in project management
|
Browning, Tyson R. |
|
2010 |
47-48 |
4 |
p. 316-332 17 p. |
artikel |
190 |
Operations related groups (ORGs): A clustering procedure for production/inventory systems
|
Ernst, Ricardo |
|
1990 |
47-48 |
4 |
p. 574-598 25 p. |
artikel |
191 |
Optimization of volunteer labor assignments
|
Sampson, Scott E. |
|
2006 |
47-48 |
4 |
p. 363-377 |
artikel |
192 |
Order form/subscription renewal form
|
|
|
1991 |
47-48 |
4 |
p. 579- 1 p. |
artikel |
193 |
Outsourcing impact on manufacturing firms’ value: Evidence from Japan
|
Jiang, Bin |
|
2007 |
47-48 |
4 |
p. 885-900 16 p. |
artikel |
194 |
Performance evaluation of the LDR and the PSH with forecast errors
|
Barman, Samir |
|
1990 |
47-48 |
4 |
p. 481-499 19 p. |
artikel |
195 |
Performance implications of assembly work teams
|
McCreery, John K. |
|
2004 |
47-48 |
4 |
p. 387-412 26 p. |
artikel |
196 |
Planning effort as an effective risk management tool
|
Zwikael, Ofer |
|
2007 |
47-48 |
4 |
p. 755-767 13 p. |
artikel |
197 |
Planning horizons for master production scheduling
|
Chung, Chen-Hua |
|
1984 |
47-48 |
4 |
p. 389-406 18 p. |
artikel |
198 |
Predicting safe employee behavior in the steel industry: Development and test of a sociotechnical model
|
Brown, Karen A |
|
2000 |
47-48 |
4 |
p. 445-465 21 p. |
artikel |
199 |
Print versus electronic surveys: a comparison of two data collection methodologies
|
Boyer, Kenneth K. |
|
2002 |
47-48 |
4 |
p. 357-373 17 p. |
artikel |
200 |
Processes with nearly-sequential routings: a comparative analysis
|
Monahan, George E |
|
1999 |
47-48 |
4 |
p. 449-466 18 p. |
artikel |
201 |
Process quality improvement: An examination of general vs. outcome-specific climate and practices in hospitals
|
Boyer, Kenneth K. |
|
2012 |
47-48 |
4 |
p. 325-339 15 p. |
artikel |
202 |
Product configuration, ambidexterity and firm performance in the context of industrial equipment manufacturing
|
Salvador, Fabrizio |
|
2014 |
47-48 |
4 |
p. 138-153 16 p. |
artikel |
203 |
Production planning and control for remanufacturing: industry practice and research needs
|
Guide Jr., V.Daniel R |
|
2000 |
47-48 |
4 |
p. 467-483 17 p. |
artikel |
204 |
Publishers Note
|
|
|
2007 |
47-48 |
4 |
p. 956- 1 p. |
artikel |
205 |
Qualitative case studies in operations management: Trends, research outcomes, and future research implications
|
Barratt, Mark |
|
2011 |
47-48 |
4 |
p. 329-342 14 p. |
artikel |
206 |
Recent topics in manufacturing
|
Erenguc, S.Selcuk |
|
1991 |
47-48 |
4 |
p. 445- 1 p. |
artikel |
207 |
Relationship between just-in-time manufacturing practices and performance: A meta-analytic investigation
|
Mackelprang, Alan W. |
|
2010 |
47-48 |
4 |
p. 283-302 20 p. |
artikel |
208 |
Relationship between quality management practices and innovation
|
Kim, Dong-Young |
|
2012 |
47-48 |
4 |
p. 295-315 21 p. |
artikel |
209 |
Relationships among information technology, inventory, and profitability: An investigation of level invariance using sector level data
|
Shah, Rachna |
|
2007 |
47-48 |
4 |
p. 768-784 17 p. |
artikel |
210 |
Relationships between theory-driven empirical research in operations management and other disciplines
|
Amundson, Susan D |
|
1998 |
47-48 |
4 |
p. 341-359 19 p. |
artikel |
211 |
Relearning from the old masters: Lessons of the American System of Manufacturing
|
Abernathy, William J. |
|
1983 |
47-48 |
4 |
p. 155-167 13 p. |
artikel |
212 |
Requirements planning systems in the health care environment
|
Steinberg, Earle |
|
1982 |
47-48 |
4 |
p. 251-259 9 p. |
artikel |
213 |
Resolving uncertainty in manufacturing systems
|
Schmitt, Thomas G. |
|
1984 |
47-48 |
4 |
p. 331-345 15 p. |
artikel |
214 |
Retail stocking decisions with order and stock sales
|
Rajagopalan, S. |
|
1994 |
47-48 |
4 |
p. 397-410 14 p. |
artikel |
215 |
Risk considerations in operations management
|
|
|
1989 |
47-48 |
4 |
p. 386- 1 p. |
artikel |
216 |
Role of explicit and tacit knowledge in Six Sigma projects: An empirical examination of differential project success
|
Anand, Gopesh |
|
2010 |
47-48 |
4 |
p. 303-315 13 p. |
artikel |
217 |
Scheduling independent jobs on nonuniform, unequal processors
|
Bernardo, John J. |
|
1984 |
47-48 |
4 |
p. 305-313 9 p. |
artikel |
218 |
Scheduling of re-entrant flow shops
|
Graves, Stephen C. |
|
1983 |
47-48 |
4 |
p. 197-207 11 p. |
artikel |
219 |
Sequencing rules and due date setting procedures in flow line cells with family setups
|
Russell, Gregory R. |
|
1991 |
47-48 |
4 |
p. 524-545 22 p. |
artikel |
220 |
Sequential facility location with distance dependent demand
|
Oded, Berman |
|
1982 |
47-48 |
4 |
p. 261-268 8 p. |
artikel |
221 |
Service operations management: Research and application
|
Mabert, Vincent A. |
|
1982 |
47-48 |
4 |
p. 203-209 7 p. |
artikel |
222 |
Service recovery: a framework and empirical investigation
|
Miller, Janis L |
|
2000 |
47-48 |
4 |
p. 387-400 14 p. |
artikel |
223 |
Servitization: Disentangling the impact of service business model innovation on manufacturing firm performance
|
Kastalli, Ivanka Visnjic |
|
2013 |
47-48 |
4 |
p. 169-180 12 p. |
artikel |
224 |
Simple methods for uncapacitated facility location/allocation problems
|
Sule, Dileep R. |
|
1981 |
47-48 |
4 |
p. 215-223 9 p. |
artikel |
225 |
Six Sigma: Definition and underlying theory
|
Schroeder, Roger G. |
|
2008 |
47-48 |
4 |
p. 536-554 19 p. |
artikel |
226 |
Social capital configuration, legal bonds and performance in buyer–supplier relationships
|
Carey, Sinéad |
|
2011 |
47-48 |
4 |
p. 277-288 12 p. |
artikel |
227 |
Special issue on group technology and cellular manufacturing
|
|
|
1990 |
47-48 |
4 |
p. 464- 1 p. |
artikel |
228 |
Statement on empirical/field-based methodologies in JOM
|
|
|
1990 |
47-48 |
4 |
p. 629-631 3 p. |
artikel |
229 |
Strategic operations management decisions and professional performance in U.S. HMOs
|
Heineke, Janelle |
|
1995 |
47-48 |
4 |
p. 255-272 18 p. |
artikel |
230 |
Strategic supply management, quality initiatives, and organizational performance
|
Yeung, Andy C.L. |
|
2008 |
47-48 |
4 |
p. 490-502 13 p. |
artikel |
231 |
Subscription renewal Journal of Operations Management
|
|
|
1990 |
47-48 |
4 |
p. 641- 1 p. |
artikel |
232 |
Successful execution of product development projects: Balancing firmness and flexibility in the innovation process
|
Tatikonda, Mohan V |
|
2000 |
47-48 |
4 |
p. 401-425 25 p. |
artikel |
233 |
Survey research in operations management: historical analyses
|
Rungtusanatham, M.Johnny |
|
2003 |
47-48 |
4 |
p. 475-488 14 p. |
artikel |
234 |
Testing a model of pull production: a paradigm for manufacturing research using structural equation modeling
|
Koufteros, Xenophon A |
|
1999 |
47-48 |
4 |
p. 467-488 22 p. |
artikel |
235 |
Testing and classifying vehicle dispatching rules in three real-world settings
|
de Koster, René (M.)B.M |
|
2004 |
47-48 |
4 |
p. 369-386 18 p. |
artikel |
236 |
Thanks ... to our volunteers
|
|
|
1994 |
47-48 |
4 |
p. 325-326 2 p. |
artikel |
237 |
The boundary spanning capabilities of purchasing agents in buyer–supplier trust development
|
Zhang, Chun |
|
2011 |
47-48 |
4 |
p. 318-328 11 p. |
artikel |
238 |
The concept of fit business strategy, manufacturing structure and choices in CIM technology—An exploratory study
|
|
|
1989 |
47-48 |
4 |
p. 391- 1 p. |
artikel |
239 |
The customer consequences of returns in online retailing: An empirical analysis
|
Griffis, Stanley E. |
|
2012 |
47-48 |
4 |
p. 282-294 13 p. |
artikel |
240 |
The effect of environmental complexity and environmental dynamism on lean practices
|
Azadegan, Arash |
|
2013 |
47-48 |
4 |
p. 193-212 20 p. |
artikel |
241 |
The effect of information technology on learning in professional service organizations
|
Boone, Tonya |
|
2001 |
47-48 |
4 |
p. 485-495 11 p. |
artikel |
242 |
The effect of unethical behavior on trust in a buyer–supplier relationship: The mediating role of psychological contract violation
|
Hill, James A. |
|
2009 |
47-48 |
4 |
p. 281-293 13 p. |
artikel |
243 |
The effect of various production strategies on product structures with commonality
|
Guerrero, Hector H. |
|
1985 |
47-48 |
4 |
p. 395-410 16 p. |
artikel |
244 |
The effects of environmental factors on the design of master production scheduling systems
|
Lin, Neng-Pai |
|
1994 |
47-48 |
4 |
p. 367-384 18 p. |
artikel |
245 |
The effects of interorganizational governance on supplier's compliance with SCC: An empirical examination of compliant and non-compliant suppliers
|
Jiang, Bin |
|
2009 |
47-48 |
4 |
p. 267-280 14 p. |
artikel |
246 |
The effects of workforce strategies on manufacturing operations
|
Mangiameli, Paul M. |
|
1983 |
47-48 |
4 |
p. 183-196 14 p. |
artikel |
247 |
The efficient use of enterprise information for strategic advantage: A data envelopment analysis
|
Bendoly, Elliot |
|
2009 |
47-48 |
4 |
p. 310-323 14 p. |
artikel |
248 |
The empirical assessment of construct validity
|
O'Leary-Kelly, Scott W |
|
1998 |
47-48 |
4 |
p. 387-405 19 p. |
artikel |
249 |
The financial performance effects of IT-based supply chain management systems in manufacturing firms
|
Dehning, Bruce |
|
2007 |
47-48 |
4 |
p. 806-824 19 p. |
artikel |
250 |
The impact of a firm's make, pseudo-make, or buy strategy on product performance
|
Park, Jin-Kyu |
|
2011 |
47-48 |
4 |
p. 289-304 16 p. |
artikel |
251 |
The impact of safety stock on schedule instability, cost and service
|
Sridharan, V. |
|
1989 |
47-48 |
4 |
p. 327-347 21 p. |
artikel |
252 |
The impact of strategic operations management decisions on community hospital performance
|
Li, Ling X. |
|
2002 |
47-48 |
4 |
p. 389-408 20 p. |
artikel |
253 |
The influence of an integration strategy on competitive capabilities and business performance: An exploratory study of consumer products manufacturers
|
Rosenzweig, Eve D |
|
2003 |
47-48 |
4 |
p. 437-456 20 p. |
artikel |
254 |
The link between supply chain fit and financial performance of the firm
|
Wagner, Stephan M. |
|
2012 |
47-48 |
4 |
p. 340-353 14 p. |
artikel |
255 |
The manufacturing strategy formulation process: Linking multifunctional viewpoints
|
Menda, Rafael |
|
1997 |
47-48 |
4 |
p. 223-241 19 p. |
artikel |
256 |
The mediating role of operations knowledge in the relationship of context with performance
|
Germain, Richard |
|
2001 |
47-48 |
4 |
p. 453-469 17 p. |
artikel |
257 |
The relationship between product customization and organizational structure
|
Vickery, Shawnee |
|
1999 |
47-48 |
4 |
p. 377-391 15 p. |
artikel |
258 |
The relationship between total quality management practices and operational performance
|
Samson, Danny |
|
1999 |
47-48 |
4 |
p. 393-409 17 p. |
artikel |
259 |
The relationship between total quality management practices and their effects on firm performance
|
Kaynak, Hale |
|
2003 |
47-48 |
4 |
p. 405-435 31 p. |
artikel |
260 |
The relative importance of journals used in operations management research A citation analysis
|
Vokurka, Robert J. |
|
1996 |
47-48 |
4 |
p. 345-355 11 p. |
artikel |
261 |
The scholarly exchange of knowledge in Operations Management
|
Linderman, Kevin |
|
2010 |
47-48 |
4 |
p. 357-366 10 p. |
artikel |
262 |
The scientific theory-building process: a primer using the case of TQM
|
Handfield, Robert B |
|
1998 |
47-48 |
4 |
p. 321-339 19 p. |
artikel |
263 |
The service sector: Challenges and imperatives for research in operations management
|
Sullivan, Robert S. |
|
1982 |
47-48 |
4 |
p. 211-214 4 p. |
artikel |
264 |
The use of electronic data interchange for supply chain coordination in the food industry
|
Hill, Craig A. |
|
2002 |
47-48 |
4 |
p. 375-387 13 p. |
artikel |
265 |
Too much of a good thing: The impact of product variety on operations and sales performance
|
Wan, Xiang |
|
2012 |
47-48 |
4 |
p. 316-324 9 p. |
artikel |
266 |
Toward a measure of competitive priorities for purchasing
|
Krause, Daniel R |
|
2001 |
47-48 |
4 |
p. 497-512 16 p. |
artikel |
267 |
Toward a theory of the linkages between safety and quality
|
Das, Ajay |
|
2008 |
47-48 |
4 |
p. 521-535 15 p. |
artikel |
268 |
Towards an understanding of supply chain quality management
|
Foster Jr., S. Thomas |
|
2008 |
47-48 |
4 |
p. 461-467 7 p. |
artikel |
269 |
Transaction cost framework in operations and supply chain management research: theory and measurement
|
Grover, Varun |
|
2003 |
47-48 |
4 |
p. 457-473 17 p. |
artikel |
270 |
Understanding service experience in non-profit performing arts: Implications for operations and service management
|
Hume, Margee |
|
2006 |
47-48 |
4 |
p. 304-324 |
artikel |
271 |
Unlimited shelf space in Internet supply chains: Treasure trove or wasteland?
|
Rabinovich, Elliot |
|
2011 |
47-48 |
4 |
p. 305-317 13 p. |
artikel |
272 |
Unlocking the potential of advanced manufacturing technologies
|
Boyer, Kenneth K. |
|
1997 |
47-48 |
4 |
p. 331-347 17 p. |
artikel |
273 |
Use of the net present value criterion in a random job shop where early shipments are forbidden
|
Scudder, Gary D. |
|
1990 |
47-48 |
4 |
p. 526-547 22 p. |
artikel |
274 |
Using a market-utility-based approach to designing public services: A case illustration from United States Forest Service
|
Verma, Rohit |
|
2006 |
47-48 |
4 |
p. 407-416 |
artikel |
275 |
Using worker personality and demographic information to improve system performance prediction
|
Juran, David C. |
|
2004 |
47-48 |
4 |
p. 355-367 13 p. |
artikel |
276 |
Work force scheduling for arbitrary cyclic demands
|
Bechtold, Stephen E. |
|
1981 |
47-48 |
4 |
p. 205-214 10 p. |
artikel |
277 |
Yield management: A tool for capacity-considered service firms
|
Kimes, Sheryl E. |
|
1989 |
47-48 |
4 |
p. 348-363 16 p. |
artikel |