nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A cost-effective approach to stochastic line balancing with off-line repairs
|
Carter, John C. |
|
1984 |
4 |
2 |
p. 145-157 13 p. |
artikel |
2 |
A heuristic programming approach to the employee scheduling problem and some thoughts on “managerial robots”
|
Glover, Fred |
|
1984 |
4 |
2 |
p. 113-128 16 p. |
artikel |
3 |
A review of cellular manufacturing assumptions, advantages and design techniques
|
Greene, Timothy J. |
|
1984 |
4 |
2 |
p. 85-97 13 p. |
artikel |
4 |
Instructions to authors
|
|
|
1984 |
4 |
2 |
p. iii-iv nvt p. |
artikel |
5 |
Optimal maintenance center inventories for fault-tolerant repairable systems
|
Lawrence, Sidney H. |
|
1984 |
4 |
2 |
p. 175-181 7 p. |
artikel |
6 |
Scheduling and resource allocation in a food service system
|
Guley, Helen M. |
|
1984 |
4 |
2 |
p. 129-144 16 p. |
artikel |
7 |
The effects of input control in a simple scheduling model
|
Baker, Kenneth R. |
|
1984 |
4 |
2 |
p. 99-112 14 p. |
artikel |
8 |
Two heuristics for the deterministic, single operator, multiple machine, multiple run cyclic scheduling problem
|
Aronson, Jay E. |
|
1984 |
4 |
2 |
p. 159-173 15 p. |
artikel |