Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             30 results found
no title author magazine year volume issue page(s) type
1 API 675 test bed for process pumps 2011
2011 9 p. 10-
1 p.
article
2 Automated stroke length adjustment 2011
2011 9 p. 7-
1 p.
article
3 Bearing friction calculator improved 2011
2011 9 p. 7-
1 p.
article
4 Energy Recovery consolidates manufacturing 2011
2011 9 p. 2-
1 p.
article
5 Enhanced safety for nuclear power Patrick, Ranald
2011
2011 9 p. 24-26
3 p.
article
6 Flowserve expands in India 2011
2011 9 p. 2-
1 p.
article
7 Flushing system to clean lifting station 2011
2011 9 p. 6-
1 p.
article
8 Garlock buys pump diaphragm line 2011
2011 9 p. 2-
1 p.
article
9 23,000 hours running with almost no wear 2011
2011 9 p. 22-23
2 p.
article
10 Improved online condition monitoring 2011
2011 9 p. 4-
1 p.
article
11 Improving efficiency and cutting downtime 2011
2011 9 p. 14-
1 p.
article
12 Improving flow measurement Nwaoha, Chikezie
2011
2011 9 p. 44-47
4 p.
article
13 Integral PTFE diaphragm 2011
2011 9 p. 9-
1 p.
article
14 ITT spins off water company Loria, Keith
2011
2011 9 p. 28-31
4 p.
article
15 ITT's water spinoff company to be called Xylem 2011
2011 9 p. 2-
1 p.
article
16 JDA Global opens facility in China 2011
2011 9 p. 2-
1 p.
article
17 Monitoring safety on the Eiffel Tower 2011
2011 9 p. 12-
1 p.
article
18 Oil-less piston pumps 2011
2011 9 p. 4-
1 p.
article
19 Pressure gauges improve performance 2011
2011 9 p. 4-
1 p.
article
20 Products improve diaphragm efficiency 2011
2011 9 p. 4-
1 p.
article
21 Pump FAQs® 2011
2011 9 p. 48-
1 p.
article
22 Safe drinking water from natural energy 2011
2011 9 p. 16-
1 p.
article
23 Selection of gas compressors: part 2 Larralde, Eduardo
2011
2011 9 p. 36-43
8 p.
article
24 Sensing down to the operating point Pauly, Christoph P.
2011
2011 9 p. 32-35
4 p.
article
25 ‘Smart Platform’ monitors centrifugal range 2011
2011 9 p. 8-
1 p.
article
26 Solenoid valve actuator technology 2011
2011 9 p. 7-
1 p.
article
27 Sulzer completes Cardo Flow acquisition 2011
2011 9 p. 2-
1 p.
article
28 Turbo pumping station suits laboratories 2011
2011 9 p. 9-
1 p.
article
29 Valves for mining duties 2011
2011 9 p. 8-
1 p.
article
30 Wastewater works technology upgrade 2011
2011 9 p. 18-20
3 p.
article
                             30 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands