Digital Library
Close Browse articles from a journal
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
                                       All articles of the corresponding issues
 
                             143 results found
no title author magazine year volume issue page(s) type
1 A behavioral scene graph for rule enforcement in interactive virtual assembly sequence planning Banerjee, A.
2000
92-93 2-3 p. 147-157
11 p.
article
2 A computer-aided design and manufacturing system for metal forming Tisza, M.
1991
92-93 2-3 p. 301-308
8 p.
article
3 A concept for maintaining quality in flexible production Andersson, Paul H.
1991
92-93 2-3 p. 247-255
9 p.
article
4 A distributed change control workflow for collaborative design network Shiau, Jiun-Yan
2008
92-93 2-3 p. 119-127
9 p.
article
5 A dynamic-zone strategy for vehicle-collision prevention and load balancing in an AGV system with a single-loop guide path Ho, Ying-Chin
2000
92-93 2-3 p. 159-176
18 p.
article
6 A framework for classifying flexibility types in manufacturing Shewchuk, John P.
1997
92-93 2-3 p. 261-269
9 p.
article
7 Agility of networked enterprises — parallelism, error recovery and conflict resolution Huang, Chin-Yin
2000
92-93 2-3 p. 275-287
13 p.
article
8 AI and machine learning research within the framework of a CIM pilot system Erdèlyi, Ferenc
1991
92-93 2-3 p. 237-245
9 p.
article
9 A macro cell array automatic layout system and its placement algorithm Yu, Hongtao
1987
92-93 2-3 p. 255-263
article
10 An application of CIMOSA concepts in the development of change capable manufacturing cells Monfared, R.P
1999
92-93 2-3 p. 243-257
15 p.
article
11 An evaluation of CIM modelling constructs evaluation report of constructs for views according to ENV 40 003 Shorter, David
1994
92-93 2-3 p. 159-236
78 p.
article
12 An infrastructure to support concurrent engineering in bid preparation Krömker, M.
1997
92-93 2-3 p. 201-208
8 p.
article
13 An integration of bidding-oriented product conceptualization and supply chain formation Yan, Wei
2008
92-93 2-3 p. 128-144
17 p.
article
14 An Orders Release reference model as a link between production management and shop floor control software Tatsiopoulos, I.P.
1997
92-93 2-3 p. 335-344
10 p.
article
15 Applying collaborative design and modularized assembly for automotive ODM supply chain integration Trappey, Amy J.C.
2008
92-93 2-3 p. 277-287
11 p.
article
16 A QFD based performance measurement tool Jagdev, H.
1997
92-93 2-3 p. 357-366
10 p.
article
17 Architectures for integrating manufacturing activities and enterprises Williams, T.J.
1994
92-93 2-3 p. 111-139
29 p.
article
18 Architectures for product families Erens, Freek
1997
92-93 2-3 p. 165-178
14 p.
article
19 Assembly-oriented design process Eversheim, W.
1991
92-93 2-3 p. 287-300
14 p.
article
20 A strategic framework for networked manufacturing Montreuil, Benoit
2000
92-93 2-3 p. 299-317
19 p.
article
21 A system for case-based process planning Humm, B.
1991
92-93 2-3 p. 169-180
12 p.
article
22 A timed colored Petri nets modeling for dynamic workflow in product development process Ha, Seungchul
2008
92-93 2-3 p. 193-209
17 p.
article
23 A tool for object-oriented modelling and analysis of business processes Mertins, K.
1997
92-93 2-3 p. 345-356
12 p.
article
24 A tribute to a distinguished scholar: in honor of Professor Colin L. Moodie's retirement Nof, Shimon Y
2000
92-93 2-3 p. 73-78
6 p.
article
25 Author index to volume 33 1997
92-93 2-3 p. 411-413
3 p.
article
26 Author index volume 24 1994
92-93 2-3 p. 263-264
2 p.
article
27 Automatic inspection in a CIM system Szélig, K.
1991
92-93 2-3 p. 159-167
9 p.
article
28 A web-based machining parameter selection system for life cycle cost reduction and product quality enhancement Zheng, L.
2008
92-93 2-3 p. 254-261
8 p.
article
29 Bottom-up planning approaches in enterprise modelling—the need and the state of the art Reithofer, Walter
1997
92-93 2-3 p. 223-235
13 p.
article
30 Building a production planning process with an approach based on CIMOSA and workflow management systems Ortiz, Angel
1999
92-93 2-3 p. 207-219
13 p.
article
31 CAD/CAM in the electronic manufacturing industry Tomljanovich, Marco
1987
92-93 2-3 p. 215-225
article
32 CAD technology: A survey on cad systems and applications Encarnação, J.
1987
92-93 2-3 p. 145-150
article
33 Calendar 1994
92-93 2-3 p. 253-260
8 p.
article
34 Calendar 1987
92-93 2-3 p. 271-276
article
35 Capturing and assessing formal interaction at task level in product development Oehlmann, Roland
1997
92-93 2-3 p. 179-189
11 p.
article
36 CEN standardization activities related to CIMOSA Shorter, David
1999
92-93 2-3 p. 305-310
6 p.
article
37 Change propagation algorithm in a unified feature modeling scheme Ma, Yongsheng
2008
92-93 2-3 p. 110-118
9 p.
article
38 CIMOSA: enterprise engineering and integration Kosanke, K
1999
92-93 2-3 p. 83-97
15 p.
article
39 CIMOSA model creation and execution for a casting process and a manufacturing cell Didic, Milena
1994
92-93 2-3 p. 237-247
11 p.
article
40 CIMOSA modelling processes Kosanke, K.
1999
92-93 2-3 p. 141-153
13 p.
article
41 Collaborative process planning and manufacturing in product lifecycle management Ming, X.G.
2008
92-93 2-3 p. 154-166
13 p.
article
42 Communications aspects in business and industrial systems Karlmark, Gloria Ray
1987
92-93 2-3 p. 265-269
article
43 Computer aided geometric modelling system — CAGMS Tang, Zesheng
1987
92-93 2-3 p. 129-136
article
44 Computer aided rapid tooling process selection and manufacturability evaluation for injection mold development Nagahanumaiah,
2008
92-93 2-3 p. 262-276
15 p.
article
45 Computer integrated manufacturing Yoshikawa, Hiroyuki
1987
92-93 2-3 p. 181-196
article
46 Computers in Chinese industry Sun, Qiangnan
1987
92-93 2-3 p. 111-112
article
47 Concurrent design of automated manufacturing systems using knowledge processing technology Kovács, George
1991
92-93 2-3 p. 257-267
11 p.
article
48 Concurrent engineering and virtual reality for human resource planning Duffy, Vincent G
2000
92-93 2-3 p. 109-125
17 p.
article
49 Contents of volume 33 1997
92-93 2-3 p. 416-418
3 p.
article
50 Contents volume 24 1994
92-93 2-3 p. 265-266
2 p.
article
51 Context sensitive provision and visualisation of enterprise information with a hypermedia based system Sternemann, K.-H
1999
92-93 2-3 p. 173-184
12 p.
article
52 Co-ordination in manufacturing: CIM at work Jagdev, H.S.
1997
92-93 2-3 p. 151-153
3 p.
article
53 Data model for quality in product lifecycle Tang, Xiaoqing
2008
92-93 2-3 p. 167-179
13 p.
article
54 Designer support for assembly decisions Willemse, Michiel A.
1997
92-93 2-3 p. 245-252
8 p.
article
55 Designer support for product structuring—development of a DFX tool within the design coordination framework Tichem, Marcel
1997
92-93 2-3 p. 155-163
9 p.
article
56 Design of a tooling database implementation for an existing facility Anumolu, Bharat
2000
92-93 2-3 p. 221-229
9 p.
article
57 Design principles for open and reusable shop-floor control software Andersson, Niklas
1997
92-93 2-3 p. 285-293
9 p.
article
58 Developing new products with knowledge management methods and process development management in a network Chen, Hsing Hung
2008
92-93 2-3 p. 242-253
12 p.
article
59 Development of a printed circuit board design for in-circuit test advisory system Lawlor-Wright, Therese
1997
92-93 2-3 p. 253-259
7 p.
article
60 Editorial 1999
92-93 2-3 p. 79-81
3 p.
article
61 Editorial Wortmann, H.
1994
92-93 2-3 p. 109-110
2 p.
article
62 Editorial Board 2008
92-93 2-3 p. CO2-
1 p.
article
63 Electronic CAD/CAM in China Fang, Jia-Qi
1987
92-93 2-3 p. 227-231
article
64 Embedding enterprise software in extended enterprise models Wortmann, J.C.
2000
92-93 2-3 p. 231-243
13 p.
article
65 Engineer co-operation in the specification of a flexible assembly system—a pilot study Nelson, K.J.
1997
92-93 2-3 p. 237-243
7 p.
article
66 Enterprise Integration—Business Processes Integrated Management: a proposal for a methodology to develop Enterprise Integration Programs Ortiz, Angel
1999
92-93 2-3 p. 155-171
17 p.
article
67 Evaluation and comparison of production schedules Kempf, Karl
2000
92-93 2-3 p. 203-220
18 p.
article
68 Evolutionary development in shop floor control Bongaerts, L.
1997
92-93 2-3 p. 295-304
10 p.
article
69 Exploration methods in business process re-engineering Rajala, Mikko
1997
92-93 2-3 p. 367-385
19 p.
article
70 Features of production planning and control in China Jiang, Mingwei
1987
92-93 2-3 p. 157-160
article
71 FirstSTEP process modeler — a CIMOSA-compliant modeling tool Levi, Meir H
1999
92-93 2-3 p. 267-277
11 p.
article
72 Flexibility in manufacturing: an architectural point of view Pels, H.J.
1997
92-93 2-3 p. 271-283
13 p.
article
73 Flexible manufacturing and CAD/CAM — Evaluation and selection of systems Kochan, D.
1987
92-93 2-3 p. 201-207
article
74 From integrated enterprises to regional clusters: the changing basis of competition Carrie, Allan S
2000
92-93 2-3 p. 289-298
10 p.
article
75 General review of computer technology and application in China Guo, Pingxin
1987
92-93 2-3 p. 113-117
article
76 Genetic algorithms in process planning Váncza, József
1991
92-93 2-3 p. 181-194
14 p.
article
77 GRAI integrated methodology and its mapping onto generic enterprise reference architecture and methodology Chen, D.
1997
92-93 2-3 p. 387-394
8 p.
article
78 Hierarchical and heterarchical behaviour in agent-based manufacturing systems Cantamessa, Marco
1997
92-93 2-3 p. 305-316
12 p.
article
79 Holonic machine controller: A study and implementation of holonic behaviour to current NC controller Tanaya, Prianggada Indra
1997
92-93 2-3 p. 323-333
11 p.
article
80 ICCIM/AUTOFACT-ASIA '95 1994
92-93 2-3 p. 251-
1 p.
article
81 Identifying the grinding process by means of inductive machine learning Junkar, Mihael
1991
92-93 2-3 p. 147-153
7 p.
article
82 Improving the PAC shop-floor control architecture to better support implementation Maglica, Robert
1997
92-93 2-3 p. 317-322
6 p.
article
83 Index 2000
92-93 2-3 p. 321-322
2 p.
article
84 Index 2000
92-93 2-3 p. 319-320
2 p.
article
85 Index 1999
92-93 2-3 p. 347-348
2 p.
article
86 Index 1999
92-93 2-3 p. 345-346
2 p.
article
87 Integration of a CIM tool management system to an intelligent feature-based process planning system Torvinen, Seppo J.
1991
92-93 2-3 p. 207-216
10 p.
article
88 Integration of learning approaches for maintenance tasks Spur, Günter
1991
92-93 2-3 p. 269-277
9 p.
article
89 Intelligent learning aid for an intelligent FMS-monitoring process Pun, L.
1991
92-93 2-3 p. 225-235
11 p.
article
90 Introduction to the project of computer aided production management of Shenyang no. 1 machine tool works Niu, Mengyu
1987
92-93 2-3 p. 173-180
article
91 Learning in an expert system for maintenance in flexible manufacturing systems Majstorović, Vidosav D.
1991
92-93 2-3 p. 279-285
7 p.
article
92 Low cost control system for a painting robot with a teaching function Meng, Zhengan
1987
92-93 2-3 p. 197-200
article
93 Machine learning in engineering automation —The present and the future Whitehall, Bradley L.
1991
92-93 2-3 p. 91-100
10 p.
article
94 Making CIMOSA operational: the experience with the PrimeObjects tool Bruno, Giorgio
1999
92-93 2-3 p. 279-291
13 p.
article
95 Mesh generation expert system for engineering analyses with FEM Dolšak, Bojan
1991
92-93 2-3 p. 309-315
7 p.
article
96 Model-based analysis of the health, safety and environment domain in the process industry Gaches, R
1999
92-93 2-3 p. 231-242
12 p.
article
97 Multiprocessor systems for connectionist diagnosis of technical processes Barschdorff, D.
1991
92-93 2-3 p. 131-145
15 p.
article
98 Multi-sensor integration—An automatic feature selection and state identification methodology for tool wear estimation Guinea, D.
1991
92-93 2-3 p. 121-130
10 p.
article
99 Negotiation for transportation tasks with stochastic payoffs Satapathy, Goutam
2000
92-93 2-3 p. 193-202
10 p.
article
100 Neural networks—Their applications and perspectives in intelligent machining Barschdorff, D.
1991
92-93 2-3 p. 101-119
19 p.
article
101 New developments in enterprise modelling using CIMOSA Berio, G.
1999
92-93 2-3 p. 99-114
16 p.
article
102 Only people learn: organisations and systems can adapt Bolk, H.
1997
92-93 2-3 p. 209-216
8 p.
article
103 Operational building blocks for business process modelling Reyneri, Carla
1999
92-93 2-3 p. 115-123
9 p.
article
104 Planning and controlling production systems combining simulation and expert systems Falster, Peter
1987
92-93 2-3 p. 161-172
article
105 P4LM: A methodology for product lifecycle management Danesi, Frédéric
2008
92-93 2-3 p. 304-317
14 p.
article
106 ppXML: A generic and extensible language for lifecycle modelling of platform products Huang, George Q.
2008
92-93 2-3 p. 219-230
12 p.
article
107 Preface Monostori, László
1991
92-93 2-3 p. 89-90
2 p.
article
108 Presentation and exchange of business models with CIMOSA-XML Salvato, G
1999
92-93 2-3 p. 125-139
15 p.
article
109 Process oriented framework to support PLM implementation Schuh, Günther
2008
92-93 2-3 p. 210-218
9 p.
article
110 Production management and enterprise modelling Doumeingts, G
2000
92-93 2-3 p. 245-263
19 p.
article
111 Production planning in a cellular manufacturing environment Rolstadås, Asbjørn
1987
92-93 2-3 p. 151-156
article
112 Product lifecycle management for automotive development focusing on supplier integration Tang, Dunbing
2008
92-93 2-3 p. 288-295
8 p.
article
113 Product lifecycle management in aviation maintenance, repair and overhaul Lee, S.G.
2008
92-93 2-3 p. 296-303
8 p.
article
114 Product lifecycle modelling, analysis and management Ma, Yongsheng
2008
92-93 2-3 p. 107-109
3 p.
article
115 Product lifecycle oriented digitization agile process preparation system Tong, Yifei
2008
92-93 2-3 p. 145-153
9 p.
article
116 Product lifecycle-oriented quality and productivity improvement based on stream of variation methodology Du, Shichang
2008
92-93 2-3 p. 180-192
13 p.
article
117 PRoduct ONTOlogy: Defining product-related concepts for logistics planning activities Giménez, Diego M.
2008
92-93 2-3 p. 231-241
11 p.
article
118 Railway operating procedures: regulating a safety-critical enterprise Kotsiopoulos, I.L
1999
92-93 2-3 p. 221-230
10 p.
article
119 Rapid product development — an overview Bullinger, H.-J
2000
92-93 2-3 p. 99-108
10 p.
article
120 Recent developments in the application of plant-wide computer control Williams, Theodore J.
1987
92-93 2-3 p. 233-254
article
121 Reconfigurable, component-based systems and the role of enterprise engineering concepts Weston, R.H
1999
92-93 2-3 p. 321-343
23 p.
article
122 Research and development of CAD/CAM in the Chinese shipbuilding industry Zhou, Hongjun
1987
92-93 2-3 p. 209-213
article
123 Simulation games in CIM and the learning organisation Savolainen, Tapani
1997
92-93 2-3 p. 217-221
5 p.
article
124 Simulation of a torque converter production considering quality attributes Sternemann, K.-H
1999
92-93 2-3 p. 259-265
7 p.
article
125 Some strategies related to the development of a CAD / CAM system for mechanical products based on solid modeling techniques Tang, Rongxi
1987
92-93 2-3 p. 137-144
article
126 Standardisation in ISO for enterprise engineering and integration Kosanke, K
1999
92-93 2-3 p. 311-319
9 p.
article
127 Subject index to volume 33 1997
92-93 2-3 p. 414-415
2 p.
article
128 Subject index volume 24 1994
92-93 2-3 p. 261-
1 p.
article
129 The advanced information technology innovation roadmap Segarra, G
1999
92-93 2-3 p. 185-195
11 p.
article
130 The application of computerized production control systems in job shop environments McKay, Kenneth N
2000
92-93 2-3 p. 79-97
19 p.
article
131 The dynamic competitive learning method Rácz, János
1991
92-93 2-3 p. 155-158
4 p.
article
132 The interconnected chain of enterprises as presented by the Purdue Enterprise Reference Architecture Li, Hong
2000
92-93 2-3 p. 265-274
10 p.
article
133 The OPAL platform—a CIMOSA compliant execution environment 1 Correspondence of the CIMOSA-Integrating Infrastructure and the OPAL Platform, implemented by FAW. 1 Solte, D
1999
92-93 2-3 p. 293-303
11 p.
article
134 The penetration of cadcam in the UK Warman, E.A.
1987
92-93 2-3 p. 119-127
article
135 The prediction of cotton yarn properties using artificial intelligence Stjepanovič, Zoran
1991
92-93 2-3 p. 217-223
7 p.
article
136 The Purdue enterprise reference architecture Williams, Theodore J.
1994
92-93 2-3 p. 141-158
18 p.
article
137 Three kinds of case-based learning in sheet metal manufacturing Cser, L.
1991
92-93 2-3 p. 195-206
12 p.
article
138 Towards a taxonomy of resource recovery from end-of-life products Goggin, Kate
2000
92-93 2-3 p. 177-191
15 p.
article
139 Towards a typology of electronic product information distribution Jansen, M.H.
1997
92-93 2-3 p. 395-409
15 p.
article
140 Unsupervised video segmentation and object tracking Sista, Srinivas
2000
92-93 2-3 p. 127-146
20 p.
article
141 Using dependency records to generate design coordination advice in a constraint-based approach to concurrent engineering Bowen, James
1997
92-93 2-3 p. 191-199
9 p.
article
142 Workflow and CIMOSA—background and case study Dickerhof, Markus
1999
92-93 2-3 p. 197-205
9 p.
article
143 Workshop on electronic design processes 1994
92-93 2-3 p. 249-250
2 p.
article
                             143 results found
 
 Koninklijke Bibliotheek - National Library of the Netherlands