nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A microrobot-based automated micromanipulation station for assembly of microsystems
|
Fatikow, Sergej |
|
1998 |
36 |
1-2 |
p. 155-162 8 p. |
artikel |
2 |
An architecture for control and monitoring of discrete events systems
|
Zamaı̈, E |
|
1998 |
36 |
1-2 |
p. 95-100 6 p. |
artikel |
3 |
An integrated approach for the design of multi-product assembly systems
|
Stadzisz, P.C. |
|
1998 |
36 |
1-2 |
p. 21-29 9 p. |
artikel |
4 |
A predictive reference governor for constrained control systems
|
Bemporad, Alberto |
|
1998 |
36 |
1-2 |
p. 55-64 10 p. |
artikel |
5 |
Architecture of a multimedia communication system for technical documentation in a modern factory
|
Papandreou, Constantine A |
|
1998 |
36 |
1-2 |
p. 83-93 11 p. |
artikel |
6 |
A solution to the facility layout problem using simulated annealing
|
Chwif, Leonardo |
|
1998 |
36 |
1-2 |
p. 125-132 8 p. |
artikel |
7 |
A two-level structural model for large scale systems
|
Groumpos, Peter P. |
|
1998 |
36 |
1-2 |
p. 147-154 8 p. |
artikel |
8 |
Characterisation by decomposition in scheduling
|
Lopez, Pierre |
|
1998 |
36 |
1-2 |
p. 113-116 4 p. |
artikel |
9 |
Decision support for blend monitoring in process industries
|
Filip, Florin Gheorghe |
|
1998 |
36 |
1-2 |
p. 13-19 7 p. |
artikel |
10 |
Development of a hybrid simulator for manufacturing processes
|
Petropoulakis, L. |
|
1998 |
36 |
1-2 |
p. 117-124 8 p. |
artikel |
11 |
Editorial
|
|
|
1998 |
36 |
1-2 |
p. 1-4 4 p. |
artikel |
12 |
Electronic products recovery—PAWS, a BRITE-EURAM project
|
Goggin, Kate |
|
1998 |
36 |
1-2 |
p. 65-74 10 p. |
artikel |
13 |
Life cycle model of the grinding process
|
Chen, X |
|
1998 |
36 |
1-2 |
p. 5-11 7 p. |
artikel |
14 |
Logistics simulation of recycling networks
|
Hirsch, Bernd E |
|
1998 |
36 |
1-2 |
p. 31-38 8 p. |
artikel |
15 |
Modular control system with intelligent scheduling
|
Heikkilä, Ari |
|
1998 |
36 |
1-2 |
p. 75-81 7 p. |
artikel |
16 |
Neural networks in manufacturing cell design
|
Christodoulou, Manolis |
|
1998 |
36 |
1-2 |
p. 133-138 6 p. |
artikel |
17 |
On the complexity of precedence graphs for assembly and task planning
|
Ramos, Carlos |
|
1998 |
36 |
1-2 |
p. 101-111 11 p. |
artikel |
18 |
Petri net based modeling of hybrid systems
|
Champagnat, R |
|
1998 |
36 |
1-2 |
p. 139-146 8 p. |
artikel |
19 |
Requirements upon human competencies in globally distributed manufacturing
|
Hirsch, B.E |
|
1998 |
36 |
1-2 |
p. 49-54 6 p. |
artikel |
20 |
The human factor in CIM systems: worker empowerment and control within a high-volume production environment
|
McEwan, Anne Marie |
|
1998 |
36 |
1-2 |
p. 39-47 9 p. |
artikel |