nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Activated roller cutters as a means of rock breaking. Initial test results and future applications
|
|
|
1982 |
19 |
2 |
p. 47- 1 p. |
artikel |
2 |
Advances in general effective stress method for prediction of axial capacity for driven piles in clay
|
|
|
1982 |
19 |
2 |
p. 42- 1 p. |
artikel |
3 |
American gilsonite: Mining solid hydrocarbon
|
|
|
1982 |
19 |
2 |
p. 34- 1 p. |
artikel |
4 |
Analyses for soil-structure interaction effects for nuclear power plants. Report by the ad-hoc group on soil-structure interaction of the committee on nuclear structures and materials of the structural division of ASCE
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
5 |
Analysing displacement measurements in gravity dams
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
6 |
Analysis of rigid rafts supported by granular piles
|
|
|
1982 |
19 |
2 |
p. 42- 1 p. |
artikel |
7 |
Analysis of the influence of the experimental set-up on the settlement observed in a pile load test (in Italian)
|
|
|
1982 |
19 |
2 |
p. 42- 1 p. |
artikel |
8 |
Anisotropy of Vp Vs in rock-forming minerals. Review article
|
|
|
1982 |
19 |
2 |
p. 30- 1 p. |
artikel |
9 |
Application of finite element method (FE) for estimate of stress in stratified anisotropic rock masses (in Serbo-Croat)
|
|
|
1982 |
19 |
2 |
p. 26- 1 p. |
artikel |
10 |
Applications for polycrystalline diamond compact bits from analysis of carbide insert and steel tooth bit performance
|
|
|
1982 |
19 |
2 |
p. 45- 1 p. |
artikel |
11 |
Approach to complete limit equilibrium analysis for rock wedges - the method of ‘artificial supports’
|
|
|
1982 |
19 |
2 |
p. 43- 1 p. |
artikel |
12 |
Assessment of soils and soft rocks for embankment construction
|
|
|
1982 |
19 |
2 |
p. 22- 1 p. |
artikel |
13 |
Aughinish jetty
|
|
|
1982 |
19 |
2 |
p. 41- 1 p. |
artikel |
14 |
Bank failure and erosion on the Ohio river
|
|
|
1982 |
19 |
2 |
p. 30- 1 p. |
artikel |
15 |
Bart - influence of geology on construction conditions and costs
|
|
|
1982 |
19 |
2 |
p. 37- 1 p. |
artikel |
16 |
Bearing capacity of eccentrically loaded surface footings on sand. Technical note
|
|
|
1982 |
19 |
2 |
p. 42- 1 p. |
artikel |
17 |
Bearing capacity of strip footing on anisotropic and nonhomogeneous clays
|
|
|
1982 |
19 |
2 |
p. 42- 1 p. |
artikel |
18 |
Belchatow, Poland, earthquakes of 1979 and 1980 induced by surface mining
|
|
|
1982 |
19 |
2 |
p. 31- 1 p. |
artikel |
19 |
Blasting vibration and structural damage
|
|
|
1982 |
19 |
2 |
p. 46- 1 p. |
artikel |
20 |
Breakage parameters of some materials in smooth roll crushers
|
|
|
1982 |
19 |
2 |
p. 46- 1 p. |
artikel |
21 |
Breakage properties of some materials in a laboratory ball mill
|
|
|
1982 |
19 |
2 |
p. 46- 1 p. |
artikel |
22 |
Building the tunnel and reservoir plan using the contracting practices of the metropolitan sanitary district of greater Chicago
|
|
|
1982 |
19 |
2 |
p. 38- 1 p. |
artikel |
23 |
Cardiff cable tunnel
|
|
|
1982 |
19 |
2 |
p. 38- 1 p. |
artikel |
24 |
Case for planned roof bolting
|
|
|
1982 |
19 |
2 |
p. 47- 1 p. |
artikel |
25 |
Caves for the safe long-term storage of nuclear wastes
|
|
|
1982 |
19 |
2 |
p. 31- 1 p. |
artikel |
26 |
Centrifuge modeling of fault propagation through alluvial soils
|
|
|
1982 |
19 |
2 |
p. 30- 1 p. |
artikel |
27 |
Chalk slope failure at Gainsville Lock, Alabama
|
|
|
1982 |
19 |
2 |
p. 44-45 2 p. |
artikel |
28 |
Characterization of expansive soils
|
|
|
1982 |
19 |
2 |
p. 30- 1 p. |
artikel |
29 |
Choosing the number and lengths of adits for a long tunnel
|
|
|
1982 |
19 |
2 |
p. 37- 1 p. |
artikel |
30 |
Circular underground powerhouse for USA's kerckhoff 2
|
|
|
1982 |
19 |
2 |
p. 37- 1 p. |
artikel |
31 |
Civil engineering in mining
|
|
|
1982 |
19 |
2 |
p. 34- 1 p. |
artikel |
32 |
Classification of microstructures of loess in China and their collapsibility
|
|
|
1982 |
19 |
2 |
p. 24- 1 p. |
artikel |
33 |
Code of practice for earthworks. British Standard BS 6031:1981
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
34 |
Compactive prestress in shales
|
|
|
1982 |
19 |
2 |
p. 28- 1 p. |
artikel |
35 |
Comparison of results from air-acceptance and hydrogeological tests associated with underground coal gasification. Technical note
|
|
|
1982 |
19 |
2 |
p. 28- 1 p. |
artikel |
36 |
Comparison of zero-stress contours to surface erosion for excavated slopes of stratified rock
|
|
|
1982 |
19 |
2 |
p. 30- 1 p. |
artikel |
37 |
Composite model for the anisotropic elastic moduli of lean oil shale
|
|
|
1982 |
19 |
2 |
p. 26- 1 p. |
artikel |
38 |
Compression-percolation test for mine tailings backfill
|
|
|
1982 |
19 |
2 |
p. 28- 1 p. |
artikel |
39 |
Concrete lining of the kielder water tunnels
|
|
|
1982 |
19 |
2 |
p. 37- 1 p. |
artikel |
40 |
Considerations on the dynamic interaction of soil and multiples foundation system (in Japanese)
|
|
|
1982 |
19 |
2 |
p. 43- 1 p. |
artikel |
41 |
Consolidation of a soil stratum, including self-weight effects and large strains
|
|
|
1982 |
19 |
2 |
p. 28- 1 p. |
artikel |
42 |
Construction and performance of a mixed face tunnel excavation
|
|
|
1982 |
19 |
2 |
p. 33- 1 p. |
artikel |
43 |
Correlation between magnetic and mineralogical properties of some tertiary basaltic rocks from qatrani-fayum area, Egypt
|
|
|
1982 |
19 |
2 |
p. 24- 1 p. |
artikel |
44 |
Correlation of rock mass classification parameters obtained from borecore and in-situ observations
|
|
|
1982 |
19 |
2 |
p. 30- 1 p. |
artikel |
45 |
Coupled finite element-boundary element method of stress analysis
|
|
|
1982 |
19 |
2 |
p. 24- 1 p. |
artikel |
46 |
Crushing characteristics
|
|
|
1982 |
19 |
2 |
p. 46- 1 p. |
artikel |
47 |
Current research in earthquake prediction 1 (developments in earth and planetary sciences 02)
|
|
|
1982 |
19 |
2 |
p. 31- 1 p. |
artikel |
48 |
Current tailings dam design and construction methods
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
49 |
Cyclic strength characteristics of tailings materials
|
|
|
1982 |
19 |
2 |
p. 25-26 2 p. |
artikel |
50 |
Deep-vertical-fabric moisture barriers in swelling soils
|
|
|
1982 |
19 |
2 |
p. 45- 1 p. |
artikel |
51 |
Deep vibratory compaction provides foundations for two major overseas projects
|
|
|
1982 |
19 |
2 |
p. 41- 1 p. |
artikel |
52 |
Description of pillar behaviour at heath steele mines
|
|
|
1982 |
19 |
2 |
p. 34- 1 p. |
artikel |
53 |
Design and construction of shafts by the wet method
|
|
|
1982 |
19 |
2 |
p. 35- 1 p. |
artikel |
54 |
Design and installation of large diameter subsea connecting shafts for the seabrook station cooling water system
|
|
|
1982 |
19 |
2 |
p. 35- 1 p. |
artikel |
55 |
Design and operation of three metre extraction faces with heavy duty equipement at daw mill colliery
|
|
|
1982 |
19 |
2 |
p. 33- 1 p. |
artikel |
56 |
Designing roadheader cutting heads
|
|
|
1982 |
19 |
2 |
p. 45- 1 p. |
artikel |
57 |
Design method for stabilizing piles against landslide - one row of piles
|
|
|
1982 |
19 |
2 |
p. 44- 1 p. |
artikel |
58 |
Design problems for underground nuclear waste disposal in basalt
|
|
|
1982 |
19 |
2 |
p. 23- 1 p. |
artikel |
59 |
Determination of some important geotechnical joint properties by means of integral geometry (in German)
|
|
|
1982 |
19 |
2 |
p. 23- 1 p. |
artikel |
60 |
Development of a laboratory compaction-degradation test for shales
|
|
|
1982 |
19 |
2 |
p. 29- 1 p. |
artikel |
61 |
Development of an extruded tunnel lining system
|
|
|
1982 |
19 |
2 |
p. 38- 1 p. |
artikel |
62 |
Development of high-pressure abrasive-jet drilling
|
|
|
1982 |
19 |
2 |
p. 45- 1 p. |
artikel |
63 |
Direct pressure readings in underground rooms by nomograms in order to determine the appropriate supports (in Sebo-Croat)
|
|
|
1982 |
19 |
2 |
p. 32- 1 p. |
artikel |
64 |
Dual life roadway at abernant colliery
|
|
|
1982 |
19 |
2 |
p. 34- 1 p. |
artikel |
65 |
Dynamic and static moduli
|
|
|
1982 |
19 |
2 |
p. 27- 1 p. |
artikel |
66 |
Dynamic consolidation and vibro compaction used for soil stabilisation at filled quarry site
|
|
|
1982 |
19 |
2 |
p. 47- 1 p. |
artikel |
67 |
Dynamic deformation and failure characteristics of rockfill material subjected to cyclic shear loading under vertical vibration
|
|
|
1982 |
19 |
2 |
p. 41- 1 p. |
artikel |
68 |
Dynamic properties of some cohesive soils of Ontario
|
|
|
1982 |
19 |
2 |
p. 29- 1 p. |
artikel |
69 |
Dynamic response of raw and stabilized Oklahoma shales
|
|
|
1982 |
19 |
2 |
p. 30- 1 p. |
artikel |
70 |
Earthquakes and dams
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
71 |
Eastern scheldt design has changed
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
72 |
Effects of bit hydraulics on full-scale laboratory drilled shale
|
|
|
1982 |
19 |
2 |
p. 45- 1 p. |
artikel |
73 |
Effects of moisture on strata control in coal mines
|
|
|
1982 |
19 |
2 |
p. 34- 1 p. |
artikel |
74 |
Effects of saturant salinity and pressure on the electrical resistivity of Hawaiian basalts
|
|
|
1982 |
19 |
2 |
p. 27- 1 p. |
artikel |
75 |
Effects of soluble salts on the threshold shear velocity of fine sand
|
|
|
1982 |
19 |
2 |
p. 25- 1 p. |
artikel |
76 |
Effects of various parameters on hydraulic fracturing geometry
|
|
|
1982 |
19 |
2 |
p. 24- 1 p. |
artikel |
77 |
Elements of foundation design
|
|
|
1982 |
19 |
2 |
p. 41- 1 p. |
artikel |
78 |
Empirical evaluation of pressuremeter test data
|
|
|
1982 |
19 |
2 |
p. 26- 1 p. |
artikel |
79 |
Engineering geology of the tropical volcanic soils of la Laguna, Tenerife
|
|
|
1982 |
19 |
2 |
p. 22- 1 p. |
artikel |
80 |
Engineering properties of Sabkha soils in the Benghazi plain and construction problems
|
|
|
1982 |
19 |
2 |
p. 22- 1 p. |
artikel |
81 |
Erosion of road batters in chim shale, Papua New Guinea
|
|
|
1982 |
19 |
2 |
p. 31- 1 p. |
artikel |
82 |
Evolution in design of longhole open stoping at Zinc corporation Limited/New Broken Hill Consolidated Limited Mines with particular reference to sloped wall mining
|
|
|
1982 |
19 |
2 |
p. 35- 1 p. |
artikel |
83 |
Excavation and support of undergound crusher facility at carr fork mine
|
|
|
1982 |
19 |
2 |
p. 32- 1 p. |
artikel |
84 |
Experience in the construction and the use of rock caverns for oil storage
|
|
|
1982 |
19 |
2 |
p. 32- 1 p. |
artikel |
85 |
Experiences of the utilization of geomechanics classifications in the construction of tunnels (in Spanish)
|
|
|
1982 |
19 |
2 |
p. 38- 1 p. |
artikel |
86 |
Experimental high temperature and high pressure faults
|
|
|
1982 |
19 |
2 |
p. 27- 1 p. |
artikel |
87 |
Experimental stooping on the no 5 seam, greenside colliery
|
|
|
1982 |
19 |
2 |
p. 34- 1 p. |
artikel |
88 |
Face operation at Rheinland colliery
|
|
|
1982 |
19 |
2 |
p. 33- 1 p. |
artikel |
89 |
Failure of a partially submerged rock slope with particular references to the Vajont rock slide
|
Corbyn, J.A. |
|
1982 |
19 |
2 |
p. 99-102 4 p. |
artikel |
90 |
Feasibility study - selection of a mining method integrating rock mechanics and mine planning
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
91 |
Finite element analysis of mine spoil slopes using slip elements to simulate strain softening yield behavior
|
|
|
1982 |
19 |
2 |
p. 44- 1 p. |
artikel |
92 |
Finite element analysis of problems with infinitely distant boundaries
|
|
|
1982 |
19 |
2 |
p. 21- 1 p. |
artikel |
93 |
Fluid-flow monitoring using electromagnetic probing
|
|
|
1982 |
19 |
2 |
p. 31- 1 p. |
artikel |
94 |
20-foot-diameter blind shaft drilling
|
|
|
1982 |
19 |
2 |
p. 34- 1 p. |
artikel |
95 |
Formula for estimating fissure transmissivities from steady-state injection test data
|
|
|
1982 |
19 |
2 |
p. 31- 1 p. |
artikel |
96 |
Formwork for Dinorwic's hydraulic tunnels
|
|
|
1982 |
19 |
2 |
p. 38- 1 p. |
artikel |
97 |
Foundations of London bridge
|
|
|
1982 |
19 |
2 |
p. 42- 1 p. |
artikel |
98 |
Fourth Canadian geotechnical colloquium: Strength and slope stability in Canadian soft clay deposits
|
|
|
1982 |
19 |
2 |
p. 25- 1 p. |
artikel |
99 |
Fracture evaluation with pressure transient testing in low-permeability gas reservoirs
|
|
|
1982 |
19 |
2 |
p. 22- 1 p. |
artikel |
100 |
Frequency dependence of seismic dissipation in saturated rocks
|
|
|
1982 |
19 |
2 |
p. 30- 1 p. |
artikel |
101 |
Fundamental considerations on undrained strength characteristics of alluvial marine clays
|
|
|
1982 |
19 |
2 |
p. 25- 1 p. |
artikel |
102 |
Geohydrologic models of the Houston district, Texas
|
|
|
1982 |
19 |
2 |
p. 31- 1 p. |
artikel |
103 |
Geometric and dynamic analysis of some faults in the western coalfield of New South Wales
|
|
|
1982 |
19 |
2 |
p. 35- 1 p. |
artikel |
104 |
Geotechnical design of large openings at depth
|
|
|
1982 |
19 |
2 |
p. 39- 1 p. |
artikel |
105 |
Geotechnical investigation for a cement factory in boulder deposit
|
|
|
1982 |
19 |
2 |
p. 43- 1 p. |
artikel |
106 |
Geotechnical performance of a large machine-bored precast concrete lined tunnel
|
|
|
1982 |
19 |
2 |
p. 38- 1 p. |
artikel |
107 |
Groove deepening with disc cutters
|
|
|
1982 |
19 |
2 |
p. 47- 1 p. |
artikel |
108 |
Ground control system in near vertical rock excavation
|
|
|
1982 |
19 |
2 |
p. 32- 1 p. |
artikel |
109 |
Ground control techniques compared in three Brazilian water tunnels (in 3 parts)
|
|
|
1982 |
19 |
2 |
p. 37- 1 p. |
artikel |
110 |
Ground motion near causative fault of Kita-tango earthquake of 1927
|
|
|
1982 |
19 |
2 |
p. 31- 1 p. |
artikel |
111 |
Helms underground pumped storage project shaft development
|
|
|
1982 |
19 |
2 |
p. 39- 1 p. |
artikel |
112 |
High-head underground power project presents design/construction challenges
|
|
|
1982 |
19 |
2 |
p. 32- 1 p. |
artikel |
113 |
House foundations for the builder and building designer
|
|
|
1982 |
19 |
2 |
p. 41- 1 p. |
artikel |
114 |
Inexpensive but technically sound mine pillar design analysis
|
|
|
1982 |
19 |
2 |
p. 34- 1 p. |
artikel |
115 |
Influence of coal rib pillar width on the stability of strata around the face-end and gatehead in longwall mining
|
|
|
1982 |
19 |
2 |
p. 35- 1 p. |
artikel |
116 |
Influence of shear velocity on the frictional resistance of rock discontinuities
|
|
|
1982 |
19 |
2 |
p. 29- 1 p. |
artikel |
117 |
Innovations in tunnel construction and support techniques
|
|
|
1982 |
19 |
2 |
p. 37- 1 p. |
artikel |
118 |
Instrumentation used to control excavation and rock bolting for underground subway station
|
|
|
1982 |
19 |
2 |
p. 32- 1 p. |
artikel |
119 |
Instrumented triaxial cell for cyclic loading of clays
|
|
|
1982 |
19 |
2 |
p. 26- 1 p. |
artikel |
120 |
Interpretation of fracturing pressures
|
|
|
1982 |
19 |
2 |
p. 24- 1 p. |
artikel |
121 |
Interpreting relative permeability and wettability from unsteady-state displacement measurements
|
|
|
1982 |
19 |
2 |
p. 28- 1 p. |
artikel |
122 |
Interrelationship of geologic conditions with construction methods and costs, Washington metro
|
|
|
1982 |
19 |
2 |
p. 37- 1 p. |
artikel |
123 |
In the wake of NZ's canal failure
|
|
|
1982 |
19 |
2 |
p. 44- 1 p. |
artikel |
124 |
Inverse problem approach to settlement prediction
|
|
|
1982 |
19 |
2 |
p. 28- 1 p. |
artikel |
125 |
Investigation of stand-up time of tunnels in squeezing ground
|
|
|
1982 |
19 |
2 |
p. 38- 1 p. |
artikel |
126 |
Japanese TBM moves into Europe
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
127 |
Laboratory measurements of reservoir rock from the Geysers geothermal field, California
|
Lockner, D.A. |
|
1982 |
19 |
2 |
p. 65-80 16 p. |
artikel |
128 |
Laboratory studies of the stabilization of nondurable shales
|
|
|
1982 |
19 |
2 |
p. 27- 1 p. |
artikel |
129 |
Laboratory techniques for demonstrating rock mass behaviour. Technical note
|
|
|
1982 |
19 |
2 |
p. 22- 1 p. |
artikel |
130 |
Lambert coal beats sandstone parting
|
|
|
1982 |
19 |
2 |
p. 34- 1 p. |
artikel |
131 |
Landslide problems in Winnipeg
|
|
|
1982 |
19 |
2 |
p. 44- 1 p. |
artikel |
132 |
Large underground opening measured versus predicted rock deformations
|
|
|
1982 |
19 |
2 |
p. 39- 1 p. |
artikel |
133 |
Lateral load-deflection relationships of piles subjected to dynamic loadings
|
|
|
1982 |
19 |
2 |
p. 42-43 2 p. |
artikel |
134 |
Longwall coalface roof supports for the 1980's
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
135 |
Machine stiffness appropriate for experimental simulation of earthquake processes
|
|
|
1982 |
19 |
2 |
p. 31- 1 p. |
artikel |
136 |
Measurement of detonation stability and gap tests for ANFO (in Swedish)
|
|
|
1982 |
19 |
2 |
p. 46- 1 p. |
artikel |
137 |
Method for estimating the consolidation of a normally consolidated clay of some age
|
|
|
1982 |
19 |
2 |
p. 28-29 2 p. |
artikel |
138 |
Method of calculating the undrained strength ratio of normally consolidated clay measured in the simple shear test. Technical note
|
|
|
1982 |
19 |
2 |
p. 25- 1 p. |
artikel |
139 |
Method of modelling the effect of traffic on undermined buried pipelines
|
|
|
1982 |
19 |
2 |
p. 33- 1 p. |
artikel |
140 |
Metrorail's dual chamber rock tunnel station - two can be simpler than one
|
|
|
1982 |
19 |
2 |
p. 37-38 2 p. |
artikel |
141 |
Micromechanics of faulting in westerly granite
|
Wong, T.-F. |
|
1982 |
19 |
2 |
p. 49-64 16 p. |
artikel |
142 |
Mining induced cleavage, cleats and instantaneous outbursts in the gemini seam at Leichhardt Colliery, Blackwater, Queensland
|
|
|
1982 |
19 |
2 |
p. 35- 1 p. |
artikel |
143 |
Model studies of an overtopped rockfill dam
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
144 |
Modern electronics for geotechnical engineers. 6. process control applications
|
|
|
1982 |
19 |
2 |
p. 21- 1 p. |
artikel |
145 |
Modulus and damping of asphaltic concrete using the resonant column. Technical note
|
|
|
1982 |
19 |
2 |
p. 29- 1 p. |
artikel |
146 |
Much infilling at Falkirk
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
147 |
Mudslide plug flow within channels
|
|
|
1982 |
19 |
2 |
p. 27- 1 p. |
artikel |
148 |
Multi-dimensional elasto-plastic consolidation analysis by finite element method
|
|
|
1982 |
19 |
2 |
p. 28- 1 p. |
artikel |
149 |
Multilayer soil load bearing capacity (in serbo-croat)
|
|
|
1982 |
19 |
2 |
p. 43- 1 p. |
artikel |
150 |
Neotectonic stresses in the region of the mine at Bleiberg, Carinthia (in German)
|
|
|
1982 |
19 |
2 |
p. 39- 1 p. |
artikel |
151 |
New closure rate instrument for retreat mining operations
|
|
|
1982 |
19 |
2 |
p. 34- 1 p. |
artikel |
152 |
New developments in laser-numerical analysis instrumentation
|
|
|
1982 |
19 |
2 |
p. 38- 1 p. |
artikel |
153 |
New device of a hydraulic drill for anchors
|
|
|
1982 |
19 |
2 |
p. 45-46 2 p. |
artikel |
154 |
New dynamic model for earth dams evaluated through case histories
|
|
|
1982 |
19 |
2 |
p. 41- 1 p. |
artikel |
155 |
New generation alternative energy gets down to earth
|
|
|
1982 |
19 |
2 |
p. 45- 1 p. |
artikel |
156 |
New polymer offers effective, permanent clay stabilization treatment
|
|
|
1982 |
19 |
2 |
p. 47- 1 p. |
artikel |
157 |
New techniques in deep pre-sinking of mine shafts
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
158 |
Non-linear elastic finite element analysis of lateral earth pressures against basement wall
|
|
|
1982 |
19 |
2 |
p. 45- 1 p. |
artikel |
159 |
Open-pit and underground blasting techniques
|
|
|
1982 |
19 |
2 |
p. 46- 1 p. |
artikel |
160 |
Optimization of pyrite in mine waste backfill Underground excavation Mines
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
161 |
Orchard valley mine
|
|
|
1982 |
19 |
2 |
p. 33- 1 p. |
artikel |
162 |
Oriental support for grouting and the NATM
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
163 |
Overview of acoustic emission monitoring of rock structures
|
|
|
1982 |
19 |
2 |
p. 25- 1 p. |
artikel |
164 |
Partial re-lining of the falkirk high tunnel, Scotland
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
165 |
Pavement roughness on expansive clays
|
|
|
1982 |
19 |
2 |
p. 45- 1 p. |
artikel |
166 |
Pennsylvania's subsidence-control guidelines: Should they be adopted by other states?
|
|
|
1982 |
19 |
2 |
p. 39- 1 p. |
artikel |
167 |
Permeability and frictional properties of San Andreas fault gouges
|
|
|
1982 |
19 |
2 |
p. 27- 1 p. |
artikel |
168 |
Permeability and strength of San Andreas fault gouge under high pressure
|
|
|
1982 |
19 |
2 |
p. 27-28 2 p. |
artikel |
169 |
Piezoelectric effects in quartz-rich rocks
|
|
|
1982 |
19 |
2 |
p. 27- 1 p. |
artikel |
170 |
Pile design in permafrost
|
|
|
1982 |
19 |
2 |
p. 42- 1 p. |
artikel |
171 |
Pillar recovery at Ozark Lead Company
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
172 |
Planned reinforcement of the strata
|
|
|
1982 |
19 |
2 |
p. 47- 1 p. |
artikel |
173 |
Plant nightmare racks victoria tunnel
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
174 |
Pore water pressure in natural slopes. Short communication
|
|
|
1982 |
19 |
2 |
p. 44- 1 p. |
artikel |
175 |
Practical approach to vertical crater retreat mining in soft ground at whitehorse copper
|
|
|
1982 |
19 |
2 |
p. 35- 1 p. |
artikel |
176 |
Precast concrete liners for blind-drilled shafts
|
|
|
1982 |
19 |
2 |
p. 35- 1 p. |
artikel |
177 |
Prediction of vertical displacement in a subsiding elastic layer
|
|
|
1982 |
19 |
2 |
p. 39- 1 p. |
artikel |
178 |
Pregrouting in a full-face bored tunnel
|
|
|
1982 |
19 |
2 |
p. 47- 1 p. |
artikel |
179 |
Probability theory in geotechnics - an introduction
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
180 |
Problems related to protection of underground constructions from groundwater pressures (in serbo-croat)
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
181 |
Proceedings of the 1981 rapid excavation and tunnelling conference, San Francisco, California, 3–7 May 1981 (in 2 vols)
|
|
|
1982 |
19 |
2 |
p. 32- 1 p. |
artikel |
182 |
Progress towards establishing relationships between the mineralogy and physical properties of coal measures rocks
|
Smart, B.G.D. |
|
1982 |
19 |
2 |
p. 81-89 9 p. |
artikel |
183 |
Putting the NATM into perspective
|
|
|
1982 |
19 |
2 |
p. 36-37 2 p. |
artikel |
184 |
Recent development in laboratory testing
|
|
|
1982 |
19 |
2 |
p. 21- 1 p. |
artikel |
185 |
Reciprocal character of Rayleigh-waves and cracks
|
|
|
1982 |
19 |
2 |
p. 29- 1 p. |
artikel |
186 |
Reexamination of the values used as constants in calculating rock density from borehole gravity data. Short note
|
|
|
1982 |
19 |
2 |
p. 23- 1 p. |
artikel |
187 |
Relationship between fracture spacing and bed thickness
|
|
|
1982 |
19 |
2 |
p. 23- 1 p. |
artikel |
188 |
Relic slip in West Northamptonshire
|
|
|
1982 |
19 |
2 |
p. 43- 1 p. |
artikel |
189 |
Report on the symposium on the development of undergound space
|
|
|
1982 |
19 |
2 |
p. 32- 1 p. |
artikel |
190 |
Representative poisson's ratio for coal. Technical note
|
|
|
1982 |
19 |
2 |
p. 22- 1 p. |
artikel |
191 |
Resonant column technique for dynamic testing of cohesive soils. Technical note
|
|
|
1982 |
19 |
2 |
p. 29- 1 p. |
artikel |
192 |
Rock magnetism of fine particles. Special issue
|
|
|
1982 |
19 |
2 |
p. 27- 1 p. |
artikel |
193 |
Rock mechanics from research to application. Proceedings of the 22nd US symposium on rock mechanics, Cambridge, Mass, 29 June–2 July 1981
|
|
|
1982 |
19 |
2 |
p. 21- 1 p. |
artikel |
194 |
Rock slope stability and remedial measures for a residential development at Tsuen Wan, Hong Kong
|
|
|
1982 |
19 |
2 |
p. 43- 1 p. |
artikel |
195 |
Rock strength predictions from wireline logs
|
Elkington, P.A.S. |
|
1982 |
19 |
2 |
p. 91-97 7 p. |
artikel |
196 |
Roof bolt developments
|
|
|
1982 |
19 |
2 |
p. 47- 1 p. |
artikel |
197 |
Roof control with resin anchored rockbolts, dowels and injection systems
|
|
|
1982 |
19 |
2 |
p. 47- 1 p. |
artikel |
198 |
Royston drift: New mine - new techniques
|
|
|
1982 |
19 |
2 |
p. 33- 1 p. |
artikel |
199 |
Salt weathering in deserts
|
|
|
1982 |
19 |
2 |
p. 30-31 2 p. |
artikel |
200 |
Sealing of shafts, tunnels and boreholes for waste repositories
|
|
|
1982 |
19 |
2 |
p. 32- 1 p. |
artikel |
201 |
Seismic design of bridges. Section 4 - bridge foundations
|
|
|
1982 |
19 |
2 |
p. 43- 1 p. |
artikel |
202 |
Shaft sinking at nose rock
|
|
|
1982 |
19 |
2 |
p. 35- 1 p. |
artikel |
203 |
Shaft sinking at selby
|
|
|
1982 |
19 |
2 |
p. 33- 1 p. |
artikel |
204 |
Shaft sinking concepts and two independent systems of concurrent development through the shafts being sunk
|
|
|
1982 |
19 |
2 |
p. 35- 1 p. |
artikel |
205 |
Shale rating system and tentative applications to shale performance
|
|
|
1982 |
19 |
2 |
p. 22-23 2 p. |
artikel |
206 |
Shear strength anisotropy of clay (in Italian)
|
|
|
1982 |
19 |
2 |
p. 26- 1 p. |
artikel |
207 |
Shear strength of planes of weakness in biotite schist with simulated blast damages
|
|
|
1982 |
19 |
2 |
p. 26- 1 p. |
artikel |
208 |
Simple extension strain criterion for fracture of brittle rock
|
|
|
1982 |
19 |
2 |
p. 24- 1 p. |
artikel |
209 |
Simple methods to analyze buckling of rock slopes
|
|
|
1982 |
19 |
2 |
p. 44- 1 p. |
artikel |
210 |
Single plane of weakness theory applied in tensile stress field. Technical note
|
|
|
1982 |
19 |
2 |
p. 24-25 2 p. |
artikel |
211 |
Size distributions of rock blocks from measurements on rock faces (in German)
|
|
|
1982 |
19 |
2 |
p. 23- 1 p. |
artikel |
212 |
Slope protection along St Lawerence seaway canals
|
|
|
1982 |
19 |
2 |
p. 44- 1 p. |
artikel |
213 |
Slope stability and quarry planning
|
|
|
1982 |
19 |
2 |
p. 44- 1 p. |
artikel |
214 |
Soil consolidation behavior assessed by seismic velocity measurements
|
|
|
1982 |
19 |
2 |
p. 28- 1 p. |
artikel |
215 |
Soil-moisture properties of subgrade soils
|
|
|
1982 |
19 |
2 |
p. 23- 1 p. |
artikel |
216 |
Soil plasticity and strength - A new approach using extrusion
|
|
|
1982 |
19 |
2 |
p. 24- 1 p. |
artikel |
217 |
Soil slumps and debris flows: Prediction and protection
|
|
|
1982 |
19 |
2 |
p. 43- 1 p. |
artikel |
218 |
Soil-suction approach for evaluation of swelling potential
|
|
|
1982 |
19 |
2 |
p. 29- 1 p. |
artikel |
219 |
Solution to problems with roadheader installation in tunnelling projects
|
|
|
1982 |
19 |
2 |
p. 37- 1 p. |
artikel |
220 |
Some aspects of ‘characterization’ problems in geomechanics
|
|
|
1982 |
19 |
2 |
p. 21-22 2 p. |
artikel |
221 |
Some geotechnical properties of a lime-stabilized laterite containing a high proportion of aluminium oxide
|
|
|
1982 |
19 |
2 |
p. 22- 1 p. |
artikel |
222 |
Stabilisation of Craig-Y-Dref, Tremadog
|
|
|
1982 |
19 |
2 |
p. 47- 1 p. |
artikel |
223 |
Stability analysis of slopes by means of a mini-computer (in Italian)
|
|
|
1982 |
19 |
2 |
p. 44- 1 p. |
artikel |
224 |
Stability assessment of a wide stope excavation in a lead-zinc mine
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
225 |
Stability of cuts on the M4 North of Cardiff
|
|
|
1982 |
19 |
2 |
p. 44- 1 p. |
artikel |
226 |
Stability of the strata overlying the mined-out areas of the central witwatersrand
|
|
|
1982 |
19 |
2 |
p. 39- 1 p. |
artikel |
227 |
Stability of undersea working at lynemouth and ellington collieries
|
|
|
1982 |
19 |
2 |
p. 33- 1 p. |
artikel |
228 |
Stability of waste-shale embankments
|
|
|
1982 |
19 |
2 |
p. 41- 1 p. |
artikel |
229 |
Standard penetration tests and soil liquefaction potential evaluation
|
|
|
1982 |
19 |
2 |
p. 25- 1 p. |
artikel |
230 |
Strata Reinforcement with bolting and wire-rope systems—a comparative study
|
Raju, N.M. |
|
1982 |
19 |
2 |
p. 103-106 4 p. |
artikel |
231 |
Strength criterion of rocks
|
|
|
1982 |
19 |
2 |
p. 25- 1 p. |
artikel |
232 |
Stress analysis of multilayered anisotropic elastic systems subject to rectangular loads
|
|
|
1982 |
19 |
2 |
p. 21- 1 p. |
artikel |
233 |
Stress concentrations in the uniaxial tensile strength test
|
|
|
1982 |
19 |
2 |
p. 26- 1 p. |
artikel |
234 |
Stress corrosion cracking of quartz: A note on the influence of chemical environment
|
|
|
1982 |
19 |
2 |
p. 24- 1 p. |
artikel |
235 |
Stress path, strength and dilatancy of rocks
|
|
|
1982 |
19 |
2 |
p. 26- 1 p. |
artikel |
236 |
Study of relative density in some dune and beach sands
|
|
|
1982 |
19 |
2 |
p. 23- 1 p. |
artikel |
237 |
Swelling shale and collapsing soil
|
|
|
1982 |
19 |
2 |
p. 29- 1 p. |
artikel |
238 |
Synthetic fabrics for reinforced embankments
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
239 |
Technical guidelines for the design and construction fo shale embankments
|
|
|
1982 |
19 |
2 |
p. 41- 1 p. |
artikel |
240 |
Theoretical estimate of the tilt of a surface foundation due to an inclined anchor load applied at the interior of the soil medium
|
|
|
1982 |
19 |
2 |
p. 42- 1 p. |
artikel |
241 |
Theory of base friction models
|
|
|
1982 |
19 |
2 |
p. 21- 1 p. |
artikel |
242 |
Thermomechanical behavior of backfilled disposal rooms for waste retrieval considerations in a salt dome repository
|
|
|
1982 |
19 |
2 |
p. 23- 1 p. |
artikel |
243 |
4th international congress on rock mechanics (in Italian)
|
|
|
1982 |
19 |
2 |
p. 21- 1 p. |
artikel |
244 |
Three-dimensional solutions for displacement discontinuities in cross-anisotropic elastic media
|
|
|
1982 |
19 |
2 |
p. 33- 1 p. |
artikel |
245 |
17th supplement to bibliography of Canadian contributions in the field of rock mechanics
|
|
|
1982 |
19 |
2 |
p. 21- 1 p. |
artikel |
246 |
Towards a European code for foundation engineering
|
|
|
1982 |
19 |
2 |
p. 41- 1 p. |
artikel |
247 |
Transient pressure analysis for fractured wells
|
|
|
1982 |
19 |
2 |
p. 24- 1 p. |
artikel |
248 |
Transmission electron microscopic observation of plastic deformation in experimentally deformed pyrite
|
|
|
1982 |
19 |
2 |
p. 27- 1 p. |
artikel |
249 |
True in-situ fracturing experiment - final results
|
|
|
1982 |
19 |
2 |
p. 46- 1 p. |
artikel |
250 |
Tunnel boring machine performance as a function of local geology
|
|
|
1982 |
19 |
2 |
p. 37- 1 p. |
artikel |
251 |
Tunnel boring with hydraulic debris disposal
|
|
|
1982 |
19 |
2 |
p. 38- 1 p. |
artikel |
252 |
Tunneling and excavation in soft rock and soil
|
|
|
1982 |
19 |
2 |
p. 32- 1 p. |
artikel |
253 |
Tunnel instrumentation: why and how?
|
|
|
1982 |
19 |
2 |
p. 38- 1 p. |
artikel |
254 |
Tunnels: Planning, design, construction. Vol 1
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
255 |
Tyre retaining wall on the M62
|
|
|
1982 |
19 |
2 |
p. 45- 1 p. |
artikel |
256 |
Undrained deformation characteristics of loose sand under three-dimensional stress conditions
|
|
|
1982 |
19 |
2 |
p. 27- 1 p. |
artikel |
257 |
Undrained stress-strain behaviour of sand under irregular loading
|
|
|
1982 |
19 |
2 |
p. 25- 1 p. |
artikel |
258 |
Uprating ventilation at a mine with new shafts sunk by blind drilling
|
|
|
1982 |
19 |
2 |
p. 33- 1 p. |
artikel |
259 |
Vardo tunnel - an undersea unlined road tunnel norwegian style
|
|
|
1982 |
19 |
2 |
p. 36- 1 p. |
artikel |
260 |
Vertical retreat mining
|
|
|
1982 |
19 |
2 |
p. 46- 1 p. |
artikel |
261 |
Victoria dam catches up on lost time
|
|
|
1982 |
19 |
2 |
p. 40- 1 p. |
artikel |
262 |
Volume changes in compacted clays and shales on saturation
|
|
|
1982 |
19 |
2 |
p. 29- 1 p. |
artikel |
263 |
Way ahead - with chock shields
|
|
|
1982 |
19 |
2 |
p. 39-40 2 p. |
artikel |
264 |
West European stress field: New data and interpretation
|
|
|
1982 |
19 |
2 |
p. 30- 1 p. |
artikel |
265 |
Working close to the track
|
|
|
1982 |
19 |
2 |
p. 41- 1 p. |
artikel |
266 |
Xth ICSMFE
|
|
|
1982 |
19 |
2 |
p. 21- 1 p. |
artikel |