Digital Library
Close Browse articles from a journal
 
<< previous    next >>
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
           All articles of the corresponding issues
                                       Details for article 81 of 195 found articles
 
 
  DETERMINATION OF OPTIMAL TOTAL-WORK-CONTENT DUE-DATES FOR A SINGLE MACHINE SEQUENCING PROBLEM
 
 
Title: DETERMINATION OF OPTIMAL TOTAL-WORK-CONTENT DUE-DATES FOR A SINGLE MACHINE SEQUENCING PROBLEM
Author: Cheng, T. C. E.
Appeared in: Engineering optimization
Paging: Volume 14 (1988) nr. 2 pages 121-125
Year: 1988-11-01
Contents: This paper considers sequencing of n jobs on a single machine. The total-work-content (TWK) due-date assignment method is used to assign a due-date to each job. The objective is to determine the optimal due-date multiple factor so as to minimize a cost function based on the job earliness and tardiness values. A linear programming (UP) formulation of the problem is constructed and the optimal solution is determined via considering the LP dual problem.
Publisher: Taylor & Francis
Source file: Elektronische Wetenschappelijke Tijdschriften
 
 

                             Details for article 81 of 195 found articles
 
<< previous    next >>
 
 Koninklijke Bibliotheek - National Library of the Netherlands