Digital Library
Close Browse articles from a journal
 
<< previous    next >>
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
           All articles of the corresponding issues
                                       Details for article 10 of 13 found articles
 
 
  Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change
 
 
Title: Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change
Author: Moore, David R.
Dainty, Andrew R. J.
Appeared in: Construction management & economics
Paging: Volume 19 (2001) nr. 6 pages 559-562
Year: 2001-10-01
Contents: The success of the design and build (D&B) procurement route could be undermined by issues arising from the rigid professional cultures of individual participants within project workgroups. These have the potential to inhibit the achievement of a key espoused benefit of D&B procurement, i.e. that it promotes the integration of the design and construction processes for improved project performance. Cultural non-interoperability is identified as a significant potential barrier to effective change management, and to the achievement of innovation within the design and construction processes. This note argues that project responsibilities, which currently are delineated along professional identity lines, produce design and construction solutions that fail to fulfil the potential of D&B procurement. It is suggested that addressing cultural interoperability will require a fundamental and long term reshaping of the industry's structure, beginning with the professional bodies and the higher education system that underpins their future membership.
Publisher: Routledge
Source file: Elektronische Wetenschappelijke Tijdschriften
 
 

                             Details for article 10 of 13 found articles
 
<< previous    next >>
 
 Koninklijke Bibliotheek - National Library of the Netherlands