  Quantifying the causes and costs of rework in construction
 
 
Titel: Quantifying the causes and costs of rework in construction
Auteur: Love, Peter E. D.
Li, Heng
Verschenen in: Construction management & economics
Paginering: Jaargang 18 (2000) nr. 4 pagina's 479-490
Jaar: 2000-06-01
Inhoud: Very few construction companies and consulting firms in Australia measure their costs of quality. Consequently, it is difficult for them to prove that systems for preventing quality failures are cost-effective. Although the direct costs of a quality system can be quantified with some accuracy (salaries, costs of documentation, audits, etc.), the corresponding benefits are far more difficult to assess. Indeed quality failures have become an endemic feature of the procurement process in construction and invariably lead to time and cost overruns in projects. Thus, in order to improve the performance of projects it is necessary to identify the causes and costs rework. The research presented in this paper quantifies the causes, magnitude and costs of rework experienced in two construction projects that were procured using different contractual arrangements. The causes and costs of rework projects are analysed and discussed. The findings reveal that the cost of rework for the case study projects was 3.15% and 2.40% of their project contract value. Changes initiated by the client and end-user together with errors and omissions in contract documentation were found to be the primary causes of rework. It is recommended that construction companies and consultant firms (particularly design consultants) implement quality management practices as well as place emphasis on coordinating project documentation during the design development process so that the amount of rework in projects can be reduced or even eliminated.
Uitgever: Routledge
Bronbestand: Elektronische Wetenschappelijke Tijdschriften
 
 

                             Details van artikel 11 van 14 gevonden artikelen
 
<< vorige    volgende >>
 
 Koninklijke Bibliotheek - Nationale Bibliotheek van Nederland