Digital Library
Close Browse articles from a journal
 
<< previous    next >>
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
           All articles of the corresponding issues
                                       Details for article 3 of 7 found articles
 
 
  Determining sequence and ready times in a remanufacturing system
 
 
Title: Determining sequence and ready times in a remanufacturing system
Author: Stanfield, Paul M.
King, Russell E.
Hodgson, Thom J.
Appeared in: IIE transactions
Paging: Volume 38 (2006) nr. 7 pages 565-575
Year: 2006-06-01
Contents: A fundamental scheduling problem is to determine a production start (ready) time for jobs based on customer-specified due dates. Typically, the objective is to delay the ready time in an attempt to minimize work-in-process inventory and maximize production system utilization. In many practical situations, notably remanufacturing operations, highly variable operation times and intricate process plans complicate this problem. In such a case, a specific ready time implies a confidence of on-time completion. Prior analytical results imply the optimal solution is a function of: (i) customer due dates; (ii) desired confidence levels; and (iii) stochastic makespan minimization. This paper proposes the use of a network flow model to represent a remanufacturing flowshop and then presents a structured heuristic approach that is able to develop sequences and ready times for remanufacturing systems by balancing the three factors. A broad experimental design is used to demonstrate that the proposed scheduling method outperforms previous list rules in terms of the calculated mean and robustness values.
Publisher: Taylor & Francis
Source file: Elektronische Wetenschappelijke Tijdschriften
 
 

                             Details for article 3 of 7 found articles
 
<< previous    next >>
 
 Koninklijke Bibliotheek - National Library of the Netherlands