Digital Library
Close Browse articles from a journal
 
<< previous    next >>
     Journal description
       All volumes of the corresponding journal
         All issues of the corresponding volume
           All articles of the corresponding issues
                                       Details for article 10 of 16 found articles
 
 
  Erratum to “Particle swarm optimization-based schemes for resource-constrained project scheduling” [Automation in Construction 14/3 (2005) 393–404]
 
 
Title: Erratum to “Particle swarm optimization-based schemes for resource-constrained project scheduling” [Automation in Construction 14/3 (2005) 393–404]
Author: Zhang, Hong
Li, Xiaodong
Li, Heng
Huang, Fulai
Appeared in: Automation in construction
Paging: Volume 15 (2006) nr. 2 pages 1 p.
Year: 2006
Contents:
Publisher: Elsevier B.V.
Source file: Elektronische Wetenschappelijke Tijdschriften
 
 

                             Details for article 10 of 16 found articles
 
<< previous    next >>
 
 Koninklijke Bibliotheek - National Library of the Netherlands