nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A framework for ICT-enabled real-time production planning and control
|
Arica, Emrah |
|
2014 |
2 |
2 |
p. 158-164 |
artikel |
2 |
Approaching lean product development using system dynamics: investigating front-load effects
|
Belay, Alemu Moges |
|
2014 |
2 |
2 |
p. 130-140 |
artikel |
3 |
Guest editorial of “Intelligent logistics and supply chains”
|
Wang, Yi |
|
2014 |
2 |
2 |
p. 95-96 |
artikel |
4 |
Implications of automation in engineer-to-order production: a case study
|
Sjøbakk, Børge |
|
2014 |
2 |
2 |
p. 141-149 |
artikel |
5 |
Incentive regulation of banks on third party logistics enterprises in principal-agent-based inventory financing
|
Sun, Xue-Hua |
|
2014 |
2 |
2 |
p. 150-157 |
artikel |
6 |
Intelligent and integrated RFID (II-RFID) system for improving traceability in manufacturing
|
Wang, Ke-Sheng |
|
2014 |
2 |
2 |
p. 106-120 |
artikel |
7 |
Ontology-based interoperability solutions for textile supply chain
|
Rayyaan, Rishad |
|
2014 |
2 |
2 |
p. 97-105 |
artikel |
8 |
Product portfolio map: a visual tool for supporting product variant discovery and structuring
|
Ulonska, Sören |
|
2014 |
2 |
2 |
p. 179-191 |
artikel |
9 |
RFID unreliable data filtering by integrating adaptive sliding window and Euclidean distance
|
Liu, Li-Lan |
|
2014 |
2 |
2 |
p. 121-129 |
artikel |
10 |
The dynamic of professional knowledge utilized in software applications for process controlling
|
Bodrow, Wladimir |
|
2014 |
2 |
2 |
p. 173-178 |
artikel |
11 |
The fit of planning methods for the part manufacturing industry, a case study
|
Spenhoff, Philipp |
|
2014 |
2 |
2 |
p. 165-172 |
artikel |