nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A CAD/CAPP interface for complex rotationally symmetric parts
|
Jung, M. Y. |
|
1996 |
34 |
8 |
p. 2377 |
artikel |
2 |
A framework for hierarchical interactive generation of cellular layout*
|
Tang, C. |
|
1996 |
34 |
8 |
p. 2133-2162 |
artikel |
3 |
A framework for the dual command cycle travel time model in automated warehousing systems
|
Pan, C. -H. |
|
1996 |
34 |
8 |
p. 2099-2117 |
artikel |
4 |
A neural fuzzy control chart for detecting and classifying process mean shifts
|
Chang, S. I. |
|
1996 |
34 |
8 |
p. 2265-2278 |
artikel |
5 |
An integrated methodology for automating the determination of layout and materials handling system
|
Welgama, P. S. |
|
1996 |
34 |
8 |
p. 2247-2264 |
artikel |
6 |
An intelligent controller for manufacturing cells
|
Sun, Y. -L. |
|
1996 |
34 |
8 |
p. 2353-2373 |
artikel |
7 |
A Review of:“Creuring Qrrulity: Conceprs, Sysrems, Srruregies and Tools.”
|
Coleman, David R. |
|
1996 |
34 |
8 |
p. 2375-2376 |
artikel |
8 |
A Review of:“Systems Approach to Computer-Integrated Design and Manufacturirg.”
|
Sarker, Bhaba R. |
|
1996 |
34 |
8 |
p. 2375-2376 |
artikel |
9 |
Competitive methods for multi-level lot sizing and scheduling: tabu search and randomized regrets
|
Kimms, A. |
|
1996 |
34 |
8 |
p. 2279-2298 |
artikel |
10 |
Computer aided planning and design of manual assembly systems
|
Braun, W. J. |
|
1996 |
34 |
8 |
p. 2317-2333 |
artikel |
11 |
Formation and dynamic routeing of part families among flexible manufacturing cells
|
Wen, H. J. |
|
1996 |
34 |
8 |
p. 2229-2245 |
artikel |
12 |
Heuristic rules and strategies of assembly planning: experiment and implications in the design of assembly decision support system
|
Ye, N. |
|
1996 |
34 |
8 |
p. 2211-2228 |
artikel |
13 |
Heuristic scheduling of jobs on a multi-product batch processing machine
|
Fanti, M. P. |
|
1996 |
34 |
8 |
p. 2163-2186 |
artikel |
14 |
Optimal tolerance design for product life cycle
|
Jeang, A. |
|
1996 |
34 |
8 |
p. 2187-2209 |
artikel |
15 |
Part-machine grouping using a multi-objective cluster analysis
|
Akturk, M. S. |
|
1996 |
34 |
8 |
p. 2299-2315 |
artikel |
16 |
Resource-constrained project scheduling by simulated annealing
|
Boctor, F. F. |
|
1996 |
34 |
8 |
p. 2335-2351 |
artikel |
17 |
Scheduling research in multiple resource constrained job shops: a review and critique
|
Gargeya, V. B. |
|
1996 |
34 |
8 |
p. 2077-2097 |
artikel |
18 |
The house of quality in a design process
|
Belhe, U. |
|
1996 |
34 |
8 |
p. 2119-2131 |
artikel |