nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A column generation procedure for gang-rip saw arbor design and scheduling
|
Fathi, Y. |
|
1996 |
34 |
2 |
p. 313-327 |
artikel |
2 |
A genetic algorithm-based approach to cell composition and layout design problems
|
Gupta, Y. |
|
1996 |
34 |
2 |
p. 447-482 |
artikel |
3 |
A hybrid intelligent system for fault diagnosis of advanced manufacturing system
|
Ye, N. |
|
1996 |
34 |
2 |
p. 555-576 |
artikel |
4 |
An examination of flexibility measurements and performance of flexible manufacturing systems
|
Chen, I. J. |
|
1996 |
34 |
2 |
p. 379-394 |
artikel |
5 |
An extended dispatching rule approach in an on-line scheduling framework for batch process management
|
Ishii, N. |
|
1996 |
34 |
2 |
p. 329-348 |
artikel |
6 |
A review of "“Statistical Methods of Quality Assurance.” By H. J. MITTAG, and H. RINNE. Translated from 3rd German edition. (Chapman & Hall, 1993) [Pp. xvi + 663] Price £3500.
|
Spencer, Nancy |
|
1996 |
34 |
2 |
p. 593 |
artikel |
7 |
A review of "“The Student Edition of MATL4B High-Performarrce Numeric Computation and Visualzation Software.” By The Math Works Inc. (Prentice-Hall, 1995) [Pp. 833] Price: £32·51.
|
Ward, J.P. |
|
1996 |
34 |
2 |
p. 593-594 |
artikel |
8 |
Compensating probe radius in free surface modelling with CMM: simulation and experiment
|
Suh, S.-H. |
|
1996 |
34 |
2 |
p. 507-523 |
artikel |
9 |
Designing cellular manufacturing systems by a truncated tree search
|
Cheng, C.-H. |
|
1996 |
34 |
2 |
p. 349-361 |
artikel |
10 |
Determination of a disassembly strategy
|
Penev, K. D. |
|
1996 |
34 |
2 |
p. 495-506 |
artikel |
11 |
Framework of a fuzzy quality function deployment system
|
Khoo, L. P. |
|
1996 |
34 |
2 |
p. 299-311 |
artikel |
12 |
Incorporating maintenance activities into production planning; integration at the master schedule versus material requirements level
|
Rishel, T. D. |
|
1996 |
34 |
2 |
p. 421-446 |
artikel |
13 |
Location of departmental pickup and delivery points for an AGV system
|
Kim, J. |
|
1996 |
34 |
2 |
p. 407-420 |
artikel |
14 |
Modelling the load levelling problem in master production scheduling for MRP systems
|
Adenso-Diaz, B. |
|
1996 |
34 |
2 |
p. 483-493 |
artikel |
15 |
Monitoring and evaluation of process parameters in a plunge grinding operation
|
Zhu, C. B. |
|
1996 |
34 |
2 |
p. 543-553 |
artikel |
16 |
Optimization of process improvement and inspection location for serial manufacturing
|
Deliman, N. C. |
|
1996 |
34 |
2 |
p. 395-405 |
artikel |
17 |
Scheduling multi-purpose batch plants with junction constraints
|
Dessouky, Y. M. |
|
1996 |
34 |
2 |
p. 525-541 |
artikel |
18 |
Scheduling of Automated Guided Vehicles in a Decision Making Hierarchy
|
Akturk, M. S. |
|
1996 |
34 |
2 |
p. 577-591 |
artikel |
19 |
Storage assignment policy tradeoffs
|
Malmborg, C. J. |
|
1996 |
34 |
2 |
p. 363-378 |
artikel |