nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A CAD/CAPP interface for complex rotationally symmetric parts
|
Jung, M. Y. |
|
1996 |
34 |
1 |
p. 227-251 |
artikel |
2 |
A generic model of manufacturing flexibility based on system control hierarchies
|
Tincknell, D. J. |
|
1996 |
34 |
1 |
p. 19-32 |
artikel |
3 |
AGV dispatching
|
Klei, C. M. |
|
1996 |
34 |
1 |
p. 95-110 |
artikel |
4 |
A model for the optimal timing and sizing of capacity increments for single-location facilities
|
Siha, S. |
|
1996 |
34 |
1 |
p. 273-284 |
artikel |
5 |
An investigation of alternative dampening procedures to cope with MRP system nervousness
|
Ho, C. J. |
|
1996 |
34 |
1 |
p. 137-156 |
artikel |
6 |
Application of simulation and Petri net modelling in manufacturing control systems
|
Seifoddini, H. |
|
1996 |
34 |
1 |
p. 191-207 |
artikel |
7 |
A review of: “Cells in Industry: Managing Teams for Profit.” By JIM KIRTON and ELLEN BROOKS (McGraw Hill, London, 1994) (Pp. xvi + 281] Price: £27·00
|
Toh, Keith |
|
1996 |
34 |
1 |
p. 297-298 |
artikel |
8 |
A review of: ”Product Management: Engineering, Technology and Implementation”. By A. SHTUB. J. F. BARD, and S. GLOBERSON (Prentice Hall, 1994) [Pp. xxii + 6341 Price: £19.61.
|
DAR-EL, EZEY M. |
|
1996 |
34 |
1 |
p. 298 |
artikel |
9 |
Characterization of shearing features for sheet metal components in 2-D layout
|
JAGlRDAR, R. |
|
1996 |
34 |
1 |
p. 157-190 |
artikel |
10 |
Condition monitoring strategy—a risk based interval selection
|
Murty, Akella S. R. |
|
1996 |
34 |
1 |
p. 285-296 |
artikel |
11 |
Life cycle support of manufacturing systems based on an integration of tools
|
Singh, V. |
|
1996 |
34 |
1 |
p. 1-17 |
artikel |
12 |
Machined surface error analysis for 5-axis machining
|
Le, Y. -S. |
|
1996 |
34 |
1 |
p. 111-135 |
artikel |
13 |
Machine scheduling models in environmentally focused chemical manufacturing
|
Malmborg, C. J. |
|
1996 |
34 |
1 |
p. 209-225 |
artikel |
14 |
Performance analysis of modular products
|
He, D. W. |
|
1996 |
34 |
1 |
p. 253-272 |
artikel |
15 |
Robotic assembly system design for total productivity
|
Rampersad, H. K. |
|
1996 |
34 |
1 |
p. 71-93 |
artikel |
16 |
Short term scheduling and control in the batch process industry using hybrid knowledge based simulation
|
Goodal, W. R. |
|
1996 |
34 |
1 |
p. 33-50 |
artikel |
17 |
Simultaneously determining the number of kanbans, container sizes, and the final-assembly sequence of products in a just-in-time shop.
|
PHlLlPOO, P. R. |
|
1996 |
34 |
1 |
p. 51-69 |
artikel |