nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
A CAPP framework with optimized process parameters for rotational components
|
Siva Sankar, R. |
|
2008 |
|
20 |
p. 5561-5587 |
artikel |
2 |
Accessibility analysis for automatic inspection in CMMs by using bounding volume hierarchies
|
Alvarez, B. J. |
|
2008 |
|
20 |
p. 5797-5826 |
artikel |
3 |
A due-date based production control policy using WIP balance for implementation in semiconductor fabrications
|
Lee, B. |
|
2008 |
|
20 |
p. 5515-5529 |
artikel |
4 |
Advanced planning for minimizing makespan with load balancing in multi-plant chain
|
Moon, Chiung |
|
2005 |
|
20 |
p. 4381-4396 |
artikel |
5 |
A formal control-theoretic model of a human-automation interactive manufacturing system control
|
Shin, D. |
|
2006 |
|
20 |
p. 4273-4295 |
artikel |
6 |
A heuristic procedure for the automobile assembly-line sequencing problem considering multiple product options
|
Ding, F. -Y. |
|
2008 |
|
20 |
p. 5827-5847 |
artikel |
7 |
A learning approach to enhancing machine reconfiguration decision-making games in a heterarchical manufacturing environment
|
McDonnell, P. |
|
2005 |
|
20 |
p. 4321-4334 |
artikel |
8 |
A multi-level approach for network design of integrated supply chains
|
Dotoli, M. |
|
2005 |
|
20 |
p. 4267-4287 |
artikel |
9 |
A new algorithm for minimizing surplus parts in selective assembly by using genetic algorithm
|
Kumar, M. Siva |
|
2007 |
|
20 |
p. 4793-4822 |
artikel |
10 |
An improved algorithm for optimizing product mix under the theory of constraints
|
Aryanezhad, M. B. |
|
2004 |
|
20 |
p. 4221-4233 |
artikel |
11 |
An integrated aggregate and detailed planning in a multi-site production environment using linear programming
|
Kanyalkar, A. P. |
|
2005 |
|
20 |
p. 4431-4454 |
artikel |
12 |
A note on an industrial strategy for stock management in supply chains: modelling and performance evaluation
|
Zanoni, Simone |
|
2004 |
|
20 |
p. 4421-4426 |
artikel |
13 |
Ant colony optimization system for a multi-quantitative and qualitative objective job-shop parallel-machine-scheduling problem
|
Chang, P. -T. |
|
2008 |
|
20 |
p. 5719-5759 |
artikel |
14 |
A performance evaluation of permutation vs. non-permutation schedules in a flowshop
|
Liao, C. J. |
|
2006 |
|
20 |
p. 4297-4309 |
artikel |
15 |
A simulation study on the performance of task-determination rules and delivery-dispatching rules for multiple-load AGVs
|
Ho, Y. -C. |
|
2006 |
|
20 |
p. 4193-4222 |
artikel |
16 |
A template approach to manage mould-testing stage in a plastic injection mould project
|
Low, Maria L. H. |
|
2007 |
|
20 |
p. 4685-4714 |
artikel |
17 |
A two-stage simulated annealing procedure for block layout problems
|
Al-Araidah, Omar |
|
2006 |
|
20 |
p. 4417-4429 |
artikel |
18 |
Automatic production planning of press brakes for sheet metal bending
|
Cattrysse, D. |
|
2006 |
|
20 |
p. 4311-4327 |
artikel |
19 |
Availability and throughput of unreliable, unbuffered production lines with non-homogeneous deterministic processing times
|
Dhouib, K. |
|
2008 |
|
20 |
p. 5651-5677 |
artikel |
20 |
Book review of Journey to Lean: Making Operational Change Stick. By J. DREW, B. MACALLAM and S. ROGGENHOFER, Palgrave Macmillan, Basingstoke, 2004, £25.00, hardback (ISBN 1-4039-1307-2)
|
Webster, Margaret |
|
2004 |
|
20 |
p. 4429 |
artikel |
21 |
Book review of Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Non-regular Objective Functions 2nd Edition. By K. NEUMANN, C. SCHWINDT and J. ZEMMERMANN (Springer-Verlag, 2003), xiii + 385 pp. (hbk), EUR 84.95, £65.50, SFr 141.00, US$ 89.95, ISBN 3-540-40125-3
|
Alfares, H. K. |
|
2004 |
|
20 |
p. 4427 |
artikel |
22 |
Book Reviews
|
Nookabadi, A.S. |
|
2007 |
|
20 |
p. 4895 |
artikel |
23 |
Capacitated production planning with outsourcing in an OKP company
|
Liu, X. |
|
2008 |
|
20 |
p. 5781-5795 |
artikel |
24 |
Capacity and material requirement planning modelling by comparing deterministic and fuzzy models
|
Mula, J. |
|
2008 |
|
20 |
p. 5589-5606 |
artikel |
25 |
Comparison of push and pull control strategies for supply network management in a make-to-stock environment
|
Masuchun, W. |
|
2004 |
|
20 |
p. 4401-4419 |
artikel |
26 |
Complete and fractional cell formation using Kohonen self-organizing map networks in a cellular manufacturing system
|
Venkumar, P. |
|
2006 |
|
20 |
p. 4257-4271 |
artikel |
27 |
Concurrent optimization of customer requirements and the design of a new product
|
Piedras, Hugo |
|
2006 |
|
20 |
p. 4401-4416 |
artikel |
28 |
Confidence intervals for optimal selection among alternatives with stochastic variable costs
|
Finch, B. |
|
2006 |
|
20 |
p. 4329-4342 |
artikel |
29 |
Decentralized supply chain coordination through auction markets: dynamic lot-sizing in distribution networks
|
Lee, Seokcheon |
|
2007 |
|
20 |
p. 4715-4733 |
artikel |
30 |
Defect inspection of patterned thin film transistor-liquid crystal display panels using a fast sub-image-based singular value decomposition
|
Lu, C. -J. |
|
2004 |
|
20 |
p. 4331-4351 |
artikel |
31 |
Demand propagation in the extended enterprise: a comparative analysis of product and process design policies
|
Meixell, Mary J. |
|
2005 |
|
20 |
p. 4169-4189 |
artikel |
32 |
Dynamic lot sizing with product returns and remanufacturing
|
Teunter, Ruud H. |
|
2006 |
|
20 |
p. 4377-4400 |
artikel |
33 |
Economic selection of sub-process mean values for a mixture production process
|
Lee, Min Koo |
|
2006 |
|
20 |
p. 4367-4376 |
artikel |
34 |
Enterprise-control system integration—an international standard
|
Chen, D. |
|
2005 |
|
20 |
p. 4335-4357 |
artikel |
35 |
Enterprise management and information integration: challenges and technologies
|
|
|
2005 |
|
20 |
p. 4165-4167 |
artikel |
36 |
Evaluation of maintenance policies for equipment subject to quality shifts and failures
|
Panagiotidou, S. |
|
2008 |
|
20 |
p. 5761-5779 |
artikel |
37 |
EWMA control charts for monitoring high-yield processes based on non-transformed observations
|
Yeh, Arthur B. |
|
2008 |
|
20 |
p. 5679-5699 |
artikel |
38 |
General run-to-run (R2R) control framework using self-tuning control for multiple-input multiple-output (MIMO) processes
|
Jen, C. -H. |
|
2004 |
|
20 |
p. 4249-4270 |
artikel |
39 |
Generation of production material information for a building block and simulation of block erection for process planning and scheduling in shipbuilding
|
Roh, Myung-Il |
|
2007 |
|
20 |
p. 4653-4683 |
artikel |
40 |
Goal-balancing process for goal formation in the fractal manufacturing system
|
Cha, Y. |
|
2007 |
|
20 |
p. 4771-4791 |
artikel |
41 |
Hybrid system dynamic—discrete event simulation-based architecture for hierarchical production planning
|
Venkateswaran, J. |
|
2005 |
|
20 |
p. 4397-4429 |
artikel |
42 |
Improving supply-chain collaboration by linking intelligent agents to CPFR
|
Caridi, M. |
|
2005 |
|
20 |
p. 4191-4218 |
artikel |
43 |
Influence of initiators on supply chain value creation
|
Jayaram, J. |
|
2004 |
|
20 |
p. 4377-4399 |
artikel |
44 |
Information aggregation in industrial performance measurement: rationales, issues and definitions
|
Berrah, L. |
|
2004 |
|
20 |
p. 4271-4293 |
artikel |
45 |
Intelligent layout planning for rapid prototyping
|
Gogate, A. S. |
|
2008 |
|
20 |
p. 5607-5631 |
artikel |
46 |
Job rotation using the multi-period assignment model
|
Bhadury, J. |
|
2006 |
|
20 |
p. 4431-4444 |
artikel |
47 |
Knowledge provenance in enterprise information
|
Fox, M. S. |
|
2005 |
|
20 |
p. 4471-4492 |
artikel |
48 |
Manufacturing strategy, the business environment, and operations performance in small low-tech firms
|
Corbett, Lawrence M. |
|
2008 |
|
20 |
p. 5491-5513 |
artikel |
49 |
Minimizing Lmax for the single machine scheduling problem with family set-ups
|
Schultz, S. R. |
|
2004 |
|
20 |
p. 4315-4330 |
artikel |
50 |
Modelling and solving engineering product configuration problems by constraint satisfaction
|
Xie, H. |
|
2005 |
|
20 |
p. 4455-4469 |
artikel |
51 |
Modelling inter-task dependencies and control of workflow managements systems based on supervisory control theory
|
Yalcin, A. |
|
2005 |
|
20 |
p. 4359-4379 |
artikel |
52 |
No title
|
Jin, Xinming |
|
2007 |
|
20 |
p. 4898 |
artikel |
53 |
No title
|
McCullen, Peter |
|
2007 |
|
20 |
p. 4896-4897 |
artikel |
54 |
On the benefits and risks of focused commitment to suppliers
|
Swink, M. |
|
2006 |
|
20 |
p. 4223-4240 |
artikel |
55 |
Overall throughput effectiveness (OTE) metric for factory-level performance monitoring and bottleneck detection
|
Muthiah, K. M. N. |
|
2007 |
|
20 |
p. 4753-4769 |
artikel |
56 |
Production control framework for supply chain management—an application in the elevator manufacturing industry
|
Lu, T. P. |
|
2005 |
|
20 |
p. 4219-4233 |
artikel |
57 |
Prototyping an information system's requirements architecture for customer-driven, supply-chain operations
|
Lyons, A. C. |
|
2005 |
|
20 |
p. 4289-4319 |
artikel |
58 |
Real-time due-date promising by build-to-order environments
|
Moses, S. |
|
2004 |
|
20 |
p. 4353-4375 |
artikel |
59 |
Relationship building, lean strategy and firm performance: an exploratory study in the automotive supplier industry
|
Jayaram, J. |
|
2008 |
|
20 |
p. 5633-5649 |
artikel |
60 |
Scheduling continuous aluminium casting lines
|
Duman, Ekrem |
|
2008 |
|
20 |
p. 5701-5718 |
artikel |
61 |
Scheduling with product family set-up times: an application in TFT LCD manufacturing
|
Shin, H. J. |
|
2004 |
|
20 |
p. 4235-4248 |
artikel |
62 |
Single machine multi-product capacitated lot sizing with sequence-dependent setups
|
Almada-lobo, Bernardo |
|
2007 |
|
20 |
p. 4873-4894 |
artikel |
63 |
Spread time considerations in operational fixed job scheduling
|
Eliiyi, D. T. |
|
2006 |
|
20 |
p. 4343-4365 |
artikel |
64 |
Supply-chain networks: a complex adaptive systems perspective
|
Surana, Amit |
|
2005 |
|
20 |
p. 4235-4265 |
artikel |
65 |
Synergy between evolutionary optimization and induction graphs learning for simulated manufacturing systems
|
Huyet, A. L. |
|
2004 |
|
20 |
p. 4295-4313 |
artikel |
66 |
Synthesis maps for multivariate ordinal variables in manufacturing
|
Brondino, G. |
|
2006 |
|
20 |
p. 4241-4255 |
artikel |
67 |
System for early cost estimation of die-cast parts
|
Madan, J. |
|
2007 |
|
20 |
p. 4823-4847 |
artikel |
68 |
The use of fuzzy measures in a performance-evaluation model for ERP implementation among Taiwanese semiconductor manufacturers
|
Yang, Ching-Chow |
|
2007 |
|
20 |
p. 4735-4752 |
artikel |
69 |
Toward identifying the source of mean shifts in multivariate SPC: a neural network approach
|
Hwarng, H. B. |
|
2008 |
|
20 |
p. 5531-5559 |
artikel |
70 |
Workforce planning in the printing industry
|
Mundschenk, Martin |
|
2007 |
|
20 |
p. 4849-4872 |
artikel |