nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
Accounting for productivity losses in aggregate planning
|
Piper, C. J. |
|
2001 |
|
17 |
p. 4001-4012 |
artikel |
2 |
A comparative study of lean and agile manufacturing with a related survey of current practices in the UK
|
Yusuf, Y. Y. |
|
2002 |
|
17 |
p. 4545-4562 |
artikel |
3 |
Adaptive nonlinear tool path optimization for five-axis machining
|
Bohez, E. |
|
2000 |
|
17 |
p. 4329-4343 |
artikel |
4 |
A decision-making approach for nesting scheduling: a textile case
|
Chryssolouris, G. |
|
2000 |
|
17 |
p. 4555-4564 |
artikel |
5 |
A distributed virtual factory in agile manufacturing environment
|
Fujii, Susumu |
|
2000 |
|
17 |
p. 4113-4128 |
artikel |
6 |
A finite-element model with closed-form solutions to workpiece deflections in turning
|
Phan, A. -V. |
|
1999 |
|
17 |
p. 4039-4051 |
artikel |
7 |
A framework for evaluating ERP projects
|
Teltumbde, Anand |
|
2000 |
|
17 |
p. 4507-4520 |
artikel |
8 |
A framework for strategically-driven evaluation of enterprise information systems
|
Wu, Bin |
|
2000 |
|
17 |
p. 4071-4084 |
artikel |
9 |
Agent-based fractal architecture and modelling for developing distributed manufacturing systems
|
Ryu, Kwangyeol |
|
2003 |
|
17 |
p. 4233-4255 |
artikel |
10 |
A geometrical approach to computing expected cycle times for zonebased storage layouts in AS/RS
|
Ashayeri, J. |
|
2002 |
|
17 |
p. 4467-4483 |
artikel |
11 |
AGV controlled FMS
|
Maughan, Fergus G. |
|
2000 |
|
17 |
p. 4445-4453 |
artikel |
12 |
AGV dispatching based on workload balancing
|
Kim, C. W. |
|
1999 |
|
17 |
p. 4053-4066 |
artikel |
13 |
A machine learning approach to yield management in semiconductor manufacturing
|
Shin, Chung Kwan |
|
2000 |
|
17 |
p. 4261-4271 |
artikel |
14 |
A manufacturing system design framework for computer aided industrial engineering
|
Bonney, Maurice |
|
2000 |
|
17 |
p. 4317-4327 |
artikel |
15 |
An adaptable CNC system based on STEP-NC and function blocks
|
Wang, Hongqiang |
|
2007 |
|
17 |
p. 3809-3829 |
artikel |
16 |
An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines
|
Jang, Jaejin |
|
2001 |
|
17 |
p. 3901-3921 |
artikel |
17 |
Analysis and solution to the single-level batch production smoothing problem
|
Yavuz, Mesut |
|
2007 |
|
17 |
p. 3893-3916 |
artikel |
18 |
Analysis of an automobile assembly line as a network of closed loops working in both, stationary and transitory regimes
|
Resano Lazaro, A. |
|
2008 |
|
17 |
p. 4803-4825 |
artikel |
19 |
Analysis of interactions of criteria and sub-criteria for the selection of supplier in the built-in-order supply chain environment
|
Kannan, G. |
|
2007 |
|
17 |
p. 3831-3852 |
artikel |
20 |
Analysis of mechanical error in a fused deposition process using a stochastic approach
|
Agrawal, Sanat |
|
2007 |
|
17 |
p. 3991-4012 |
artikel |
21 |
An approach of capability representation for improving capacity planning
|
Gupta, A. |
|
2006 |
|
17 |
p. 3419-3431 |
artikel |
22 |
An effective decision-support framework for implementing enterprise information systems within SMEs
|
Blackwell, Paul |
|
2006 |
|
17 |
p. 3533-3552 |
artikel |
23 |
An efficient algorithm for automatic machining sequence planning in milling operations
|
Tolouei-Rad, Majid |
|
2003 |
|
17 |
p. 4115-4131 |
artikel |
24 |
An efficient discrete event model of assembly/disassembly production networks
|
Kouikoglou, Vassilis S. |
|
2002 |
|
17 |
p. 4485-4503 |
artikel |
25 |
A new approach to modelling, control and simulation of knowledgeable manufacturing cell
|
Yan, H. S. |
|
2007 |
|
17 |
p. 3779-3808 |
artikel |
26 |
A new system architecture compared with conventional production system architectures
|
Matta, A. |
|
2000 |
|
17 |
p. 4159-4169 |
artikel |
27 |
An integrated model for inventory and production planning in a two-stage hybrid production system
|
Aghezzaf, El-Houssaine |
|
2002 |
|
17 |
p. 4323-4339 |
artikel |
28 |
An intelligent feature-based process planning system for prismatic parts
|
Patil, Lalit |
|
2002 |
|
17 |
p. 4431-4447 |
artikel |
29 |
An intelligent hybrid system for initial process parameter setting of injection moulding
|
Mok, S. L. |
|
2000 |
|
17 |
p. 4565-4576 |
artikel |
30 |
A note on 'deliberately slowing down output in a family production context'
|
Khouja, Moutaz |
|
1999 |
|
17 |
p. 4067-4077 |
artikel |
31 |
An overview of design and operational issues of kanban systems
|
Akturk, M. S. |
|
1999 |
|
17 |
p. 3859-3881 |
artikel |
32 |
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
|
Tseng, Chao-Tang |
|
2008 |
|
17 |
p. 4655-4670 |
artikel |
33 |
Applications of neural networks to solving SMT scheduling problems a case study
|
Chen, M. |
|
1999 |
|
17 |
p. 4007-4020 |
artikel |
34 |
A probabilistic search method for sequential tolerance control
|
Scott, Katherine M. |
|
2001 |
|
17 |
p. 4033-4048 |
artikel |
35 |
A quantitative analysis of the factors affecting personnel capacity requirement in maintenance department
|
Luczak, H. |
|
1999 |
|
17 |
p. 4021-4037 |
artikel |
36 |
A simulation study of pull systems with ascending/descending buffers and stochastic processing times
|
Grosfeld-Nir, Abraham |
|
2005 |
|
17 |
p. 3529-3541 |
artikel |
37 |
Assessment of circularity error using a selective data partition approach
|
Rajagopal, Karthik |
|
1999 |
|
17 |
p. 3959-3979 |
artikel |
38 |
A study on order-batching methods of order-picking in a distribution centre with two cross-aisles
|
Ho, Y. -C. |
|
2006 |
|
17 |
p. 3391-3417 |
artikel |
39 |
A two-sided picking model of M-AS/RS with an aisle-assignment algorithm
|
Chang, T.-H. |
|
2007 |
|
17 |
p. 3971-3990 |
artikel |
40 |
Automated process planning for parametric parts
|
Rozenfeld, Henrique |
|
1999 |
|
17 |
p. 3981-3993 |
artikel |
41 |
Automation of the computer-aided design-computer-aided quality assurance process chain in car body engineering
|
Mbang, S. |
|
2004 |
|
17 |
p. 3675-3689 |
artikel |
42 |
Autonomy and viability-measures for agent-based manufacturing systems
|
Huang, Chin-Yin |
|
2000 |
|
17 |
p. 4129-4148 |
artikel |
43 |
A WWW-based integrated product development platform for sheet metal parts intelligent concurrent design and manufacturing
|
Xie, S. Q. |
|
2001 |
|
17 |
p. 3829-3852 |
artikel |
44 |
Boundary-based passive component inspection approach using eigenvalues of covariance matrices
|
Yeh, Chi-Hao |
|
2003 |
|
17 |
p. 4025-4040 |
artikel |
45 |
Call for Papers
|
|
|
2002 |
|
17 |
p. 4583 |
artikel |
46 |
Capacity assignment of virtual manufacturing cells by applying lot size harmonization
|
Mertins, K. |
|
2000 |
|
17 |
p. 4385-4391 |
artikel |
47 |
Changing from batch to flow assembly in the production of emergency lighting devices
|
van Rhijn, J. W. |
|
2005 |
|
17 |
p. 3687-3701 |
artikel |
48 |
Characteristics of distributed autonomous production control
|
Okubo, Hiroki |
|
2000 |
|
17 |
p. 4205-4215 |
artikel |
49 |
Collaborative agents for production planning and scheduling (CAPPS): a challenge to develop a new software system architecture for manufacturing management in Japan
|
Nishioka, Y. |
|
2004 |
|
17 |
p. 3355-3368 |
artikel |
50 |
Computer-aided set-up planning for machining centres configuration
|
Contini, P. |
|
2004 |
|
17 |
p. 3473-3491 |
artikel |
51 |
Confirmation testing of the Taguchi methods by artificial neural-networks simulation
|
Co, H. C. |
|
2008 |
|
17 |
p. 4671-4685 |
artikel |
52 |
Constructing a natural language for describing work tasks
|
Foster, Gillian A. |
|
2000 |
|
17 |
p. 4041-4049 |
artikel |
53 |
Constructing virtual environments for manufacturing simulation
|
Xu, Zhijie |
|
2000 |
|
17 |
p. 4171-4191 |
artikel |
54 |
Controlling production dynamics - managing uncertainties with automatic production control
|
Breithaupt, Jan-Wilhelm |
|
2000 |
|
17 |
p. 4235-4246 |
artikel |
55 |
Control of deadlock and blocking for production systems with unreliable workstations
|
Lawley, M. A. |
|
2002 |
|
17 |
p. 4563-4582 |
artikel |
56 |
Cost estimation system for machined parts
|
Ben-Arieh, D. |
|
2000 |
|
17 |
p. 4481-4494 |
artikel |
57 |
Cost modelling for feedback control adjustment
|
Venkatesan, G. |
|
2003 |
|
17 |
p. 4099-4114 |
artikel |
58 |
Critical elements for a successful enterprise resource planning implementation in small-and medium-sized enterprises
|
Loh, T. C. |
|
2004 |
|
17 |
p. 3433-3455 |
artikel |
59 |
Critical success factor framework for the implementation of integrated-enterprise systems in the manufacturing environment
|
Ho, L. T. |
|
2004 |
|
17 |
p. 3731-3742 |
artikel |
60 |
Decision models for outsourcing and core competencies in manufacturing
|
Dekkers, R. |
|
2000 |
|
17 |
p. 4085-4096 |
artikel |
61 |
Decision tree based control chart pattern recognition
|
Wang, Chih-Hsuan |
|
2008 |
|
17 |
p. 4889-4901 |
artikel |
62 |
Developing new products in a network with efficiency and innovation
|
Lee, A. H. I. |
|
2008 |
|
17 |
p. 4687-4707 |
artikel |
63 |
Development and evaluation of the interactive bidding strategies for a demander and its suppliers in supplier selection auction market
|
Lee, C. C. |
|
2008 |
|
17 |
p. 4827-4848 |
artikel |
64 |
Development of an optimal measuring device selection system using neural networks
|
Son, S. |
|
2003 |
|
17 |
p. 4133-4151 |
artikel |
65 |
Development of a parallel processing multi-agent architecture for a virtual CIM system
|
Wang, D. |
|
2004 |
|
17 |
p. 3765-3785 |
artikel |
66 |
Development of 'science TQM', a new principle of quality management: effectiveness of strategic stratified task team at Toyota
|
Kakuro, A. |
|
2004 |
|
17 |
p. 3691-3706 |
artikel |
67 |
Distributed product and facility prototyping in extended manufacturing enterprises
|
Ratchev, Svetan M. |
|
2000 |
|
17 |
p. 4495-4506 |
artikel |
68 |
Dynamic modelling of surge effect and capacity limitation in supply chains
|
Helo, P. T. |
|
2000 |
|
17 |
p. 4521-4533 |
artikel |
69 |
Economic consequences of a production and inventory control policy
|
Disney, S. M. |
|
2004 |
|
17 |
p. 3419-3431 |
artikel |
70 |
Economic evaluation of disassembly processes in remanufacturing systems
|
Tang, O. |
|
2004 |
|
17 |
p. 3603-3617 |
artikel |
71 |
Editorial
|
|
|
2004 |
|
17 |
p. 3335 |
artikel |
72 |
Empirical research on supply chain management: a critical review and recommendations
|
Ho, Danny C. K. |
|
2002 |
|
17 |
p. 4415-4430 |
artikel |
73 |
Evaluating tolerances and process capability when using truncated probability density functions
|
Sweet, A. L. |
|
2006 |
|
17 |
p. 3493-3508 |
artikel |
74 |
Evaluation of alternative tolerance allocations for multiple machining sequences with geometric tolerances
|
Tseng, Yuan-Jye |
|
1999 |
|
17 |
p. 3883-3900 |
artikel |
75 |
Evaluation of the costs and benefits of an environmental management system
|
Alberti, M. |
|
2000 |
|
17 |
p. 4455-4466 |
artikel |
76 |
Extended range tactility in material handling
|
Djordjevich, A. |
|
2000 |
|
17 |
p. 4357-4367 |
artikel |
77 |
Extending group technology to the identification and the analysis of enterprises networks
|
Villa, A. |
|
2007 |
|
17 |
p. 3881-3892 |
artikel |
78 |
External partner selection using tabu search heuristics in distributed manufacturing
|
Ko, C. S. |
|
2001 |
|
17 |
p. 3959-3974 |
artikel |
79 |
Facility layout optimization using simulation and genetic algorithms
|
Wang, Farhad Azadivar John |
|
2000 |
|
17 |
p. 4369-4383 |
artikel |
80 |
Fast algorithm for evaluating the similarity of manufacturing processes within a dynamic production environment
|
Huang, Ming-Guan |
|
2003 |
|
17 |
p. 4171-4183 |
artikel |
81 |
Feature-based representation for manufacturing planning
|
Case, K. |
|
2000 |
|
17 |
p. 4285-4300 |
artikel |
82 |
Flexible optimization of machining variables using constrained R-T characteristic curve
|
Chang, Yoonsang |
|
2001 |
|
17 |
p. 4065-4075 |
artikel |
83 |
Foreword
|
Hillery, Michael |
|
2000 |
|
17 |
p. 4005 |
artikel |
84 |
Framework for designing a flexible cellular assembly system
|
Manzini, R. |
|
2004 |
|
17 |
p. 3505-3528 |
artikel |
85 |
Framework for the control of automated material-handling systems using the holonic manufacturing approach
|
Babiceanu, R. F. |
|
2004 |
|
17 |
p. 3551-3564 |
artikel |
86 |
From Critical Success Factors to Critical Success Processes
|
Zwikael, Ofer |
|
2006 |
|
17 |
p. 3433-3449 |
artikel |
87 |
Fuzzy control of a system for assembling fibre optic transmitters
|
Pham, D. T. |
|
2006 |
|
17 |
p. 3553-3571 |
artikel |
88 |
Fuzzy estimation for manufacturing flexibility
|
van Hop, N. |
|
2005 |
|
17 |
p. 3605-3617 |
artikel |
89 |
Fuzzy expected value modelling approach for determining target values of engineering characteristics in QFD
|
Chen, Y. |
|
2005 |
|
17 |
p. 3583-3604 |
artikel |
90 |
Generalized newsboy model to compute the optimal planned lead times in assembly systems
|
Ould-Louly, M. -A. |
|
2002 |
|
17 |
p. 4401-4414 |
artikel |
91 |
Global quality: linking ergonomics and production
|
Drury, Colin G. |
|
2000 |
|
17 |
p. 4007-4018 |
artikel |
92 |
Guest Editorial: Modelling, planning and scheduling of manufacturing systems
|
|
|
2002 |
|
17 |
p. 4307-4308 |
artikel |
93 |
Heterogeneous modelling tools for integrated production systems
|
Kiefer, FranCois |
|
2000 |
|
17 |
p. 4149-4157 |
artikel |
94 |
How does variability in input load relate to the probability of critically delayed delivery in a simple multipart re-entrant flow-line problem?
|
Nielsen, E. H. |
|
2004 |
|
17 |
p. 3383-3396 |
artikel |
95 |
Human mismatches and preferences for automation
|
Rani, M. R. Abdul |
|
2000 |
|
17 |
p. 4033-4039 |
artikel |
96 |
IDEF*: a comprehensive modelling methodology for the development of manufacturing enterprise systems
|
Cheng-Leong, Ang |
|
1999 |
|
17 |
p. 3839-3858 |
artikel |
97 |
Implementation of the pin-in-paste process in a contract manufacturing environment
|
Tonapi, Sandeep S. |
|
2000 |
|
17 |
p. 4535-4553 |
artikel |
98 |
Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories
|
Chiang, David M. |
|
2008 |
|
17 |
p. 4903-4923 |
artikel |
99 |
Improving the supply chain performance: use of forecasting models versus early order commitments
|
Zhao, Xiande |
|
2001 |
|
17 |
p. 3923-3939 |
artikel |
100 |
Incorporating cellular manufacturing into supply chain design
|
Schaller, Jeffrey |
|
2008 |
|
17 |
p. 4925-4945 |
artikel |
101 |
Information management and design & engineering processes
|
Lutters, Eric |
|
2000 |
|
17 |
p. 4429-4444 |
artikel |
102 |
In-process monitoring of drilling burr formation using acoustic emission and a wavelet-based artificial neural network
|
Lee, S. H. |
|
2008 |
|
17 |
p. 4871-4888 |
artikel |
103 |
Integrated assembly plan generation system for grouped product families
|
Lai, Hsin-Yi |
|
2003 |
|
17 |
p. 4041-4061 |
artikel |
104 |
Integrated DNC: a case study
|
Zhang, X. M. |
|
2001 |
|
17 |
p. 3853-3861 |
artikel |
105 |
Integrated Virtual Assembly Environment and its application in ship piping layout
|
Wu, D. |
|
2008 |
|
17 |
p. 4729-4749 |
artikel |
106 |
Integrating AHP with QFD for robot selection under requirement perspective
|
Bhattacharya, Arijit |
|
2005 |
|
17 |
p. 3671-3685 |
artikel |
107 |
Integrative process plan model and representation for intelligent distributed manufacturing planning
|
Sormaz, D. N. |
|
2004 |
|
17 |
p. 3397-3417 |
artikel |
108 |
International facilities location: a heuristic procedure for the dynamic uncapacitated problem
|
Canel, Cem |
|
2001 |
|
17 |
p. 3975-4000 |
artikel |
109 |
Introducing capacity limitations into multi-level, multi-stage production-inventory systems applying the input-output/Laplace transform approach
|
GrubbstrOm, Robert W. |
|
2000 |
|
17 |
p. 4227-4234 |
artikel |
110 |
Joint economic production allocation and ordering policies in a supply chain consisting of multiple plants and a single retailer
|
Kim, T. |
|
2005 |
|
17 |
p. 3619-3632 |
artikel |
111 |
Layer modelling for the inspection allocation problem in re-entrant production systems
|
Rau, H. |
|
2005 |
|
17 |
p. 3633-3655 |
artikel |
112 |
Layout design in fractal organizations
|
Saad, S. M. |
|
2004 |
|
17 |
p. 3529-3550 |
artikel |
113 |
Lean, agile or leagile? Matching your supply chain to the marketplace
|
Mason-Jones, Rachel |
|
2000 |
|
17 |
p. 4061-4070 |
artikel |
114 |
Linear models for 1-group two-dimensional guillotine cutting problems
|
Yanasse, H. H. |
|
2006 |
|
17 |
p. 3471-3491 |
artikel |
115 |
Linguistic-based meta-heuristic optimization model for flexible job shop scheduling
|
Baykasoglu, Adil |
|
2002 |
|
17 |
p. 4523-4543 |
artikel |
116 |
Log-linear and non-log-linear learning curve models for production research and cost estimation
|
Smunt, Timothy L. |
|
1999 |
|
17 |
p. 3901-3911 |
artikel |
117 |
Maintenance integration in manufacturing systems by using stochastic Petri nets
|
Simeu-Abazi, Zineb |
|
1999 |
|
17 |
p. 3927-3940 |
artikel |
118 |
Managing innovation networks in the knowledge-driven economy
|
Bullinger, H. -J. |
|
2004 |
|
17 |
p. 3337-3353 |
artikel |
119 |
Managing the virtual team and controlling effectiveness
|
Bal, Jay |
|
2000 |
|
17 |
p. 4019-4032 |
artikel |
120 |
Methodology for set-up planning automation of turned parts
|
Valino, G. |
|
2007 |
|
17 |
p. 3917-3947 |
artikel |
121 |
Modelling a non-normal response for quality improvement
|
Shore, H. |
|
2001 |
|
17 |
p. 4049-4063 |
artikel |
122 |
Modelling stochastic lead times in a production-inventory system based on the Laplace transform method
|
Tang, Ou |
|
2000 |
|
17 |
p. 4217-4226 |
artikel |
123 |
Modified drum-buffer-rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation
|
Sirikrai, V. |
|
2006 |
|
17 |
p. 3509-3531 |
artikel |
124 |
Modified method time measurements for ergonomic planning of production systems in the manufacturing industry
|
Christmansson, M. |
|
2000 |
|
17 |
p. 4051-4059 |
artikel |
125 |
Multi-agent hybrid shop floor control system
|
Choi, Kyung-Hyun |
|
2000 |
|
17 |
p. 4193-4203 |
artikel |
126 |
Multiconcept classification of diagnostic knowledge to manufacturing systems: analysis of incomplete data with continuous-valued attributes
|
Khoo, L. P. |
|
2001 |
|
17 |
p. 3941-3957 |
artikel |
127 |
Multicriteria dynamic scheduling methodology for controlling a flexible manufacturing system
|
Shnits, B. |
|
2004 |
|
17 |
p. 3457-3472 |
artikel |
128 |
Optimal control of a remanufacturing system
|
Nakashima, K. |
|
2004 |
|
17 |
p. 3619-3625 |
artikel |
129 |
Optimal dwell point location of automated guided vehicles to minimize mean response time in a loop layout
|
Lee, Chulung |
|
2001 |
|
17 |
p. 4013-4031 |
artikel |
130 |
Optimal selection of module instances for modular products in reconfigurable manufacturing systems
|
Yigit, Ahmet S. |
|
2003 |
|
17 |
p. 4063-4074 |
artikel |
131 |
Optimization of multi-pass turning operations using genetic algorithms for the selection of cutting conditions and cutting tools with tool-wear effect
|
Wang, X. |
|
2005 |
|
17 |
p. 3543-3559 |
artikel |
132 |
Optimization of the machining economics problem under the periodic control strategy
|
Kaspi, Moshe |
|
2001 |
|
17 |
p. 3889-3900 |
artikel |
133 |
Order-batching heuristics based on cluster analysis in a low-level picker-to-part warehousing system
|
Hwang, H. |
|
2005 |
|
17 |
p. 3657-3670 |
artikel |
134 |
PCB assembly scheduling for collect-and-place machines using genetic algorithms
|
Kulak, O. |
|
2007 |
|
17 |
p. 3949-3969 |
artikel |
135 |
Performance evaluation of cellular layouts: extension to DRC system contexts
|
Suresh, Nallan C. |
|
2000 |
|
17 |
p. 4393-4402 |
artikel |
136 |
Performance measurements in the implementation of CIM in small and medium enterprises: an empirical analysis
|
Marri, H. B. |
|
2000 |
|
17 |
p. 4403-4411 |
artikel |
137 |
Pilot production and manufacturing start-up: the case of Volvo S80
|
Almgren, Henrik |
|
2000 |
|
17 |
p. 4577-4588 |
artikel |
138 |
Process capability analysis for an entire product
|
Chen, K. S. |
|
2001 |
|
17 |
p. 4077-4087 |
artikel |
139 |
Process chains in cross enterprise production: a module-based design framework
|
Aurich, J. C. |
|
2008 |
|
17 |
p. 4947-4962 |
artikel |
140 |
Process planning for small batch manufacturing of sheet metal parts
|
De Vin, L. J. |
|
2000 |
|
17 |
p. 4273-4283 |
artikel |
141 |
Production projects - designing and operating lifecycle-oriented and flexibility-optimized production systems as a project
|
Aurich, Jan C. |
|
2004 |
|
17 |
p. 3589-3601 |
artikel |
142 |
Proposal of a concept of future oriented machine tools for advanced manufacturing systems
|
Narita, Hirohisa |
|
2004 |
|
17 |
p. 3657-3673 |
artikel |
143 |
Quick response procurement cost control strategy for fabric manufacturing
|
Yan, H. |
|
2008 |
|
17 |
p. 4769-4784 |
artikel |
144 |
Reactive scheduling in a dynamic and stochastic FMS environment
|
Sabuncuoglu, Ihsan |
|
2003 |
|
17 |
p. 4211-4231 |
artikel |
145 |
Real-time batch sequencing using arrival time control algorithm
|
Hong, Joonki |
|
2001 |
|
17 |
p. 3863-3880 |
artikel |
146 |
Recognition of machining features - a hybrid approach
|
Lam, S. M. |
|
2000 |
|
17 |
p. 4301-4316 |
artikel |
147 |
Reconfigurable logistics systems in production and disassembly networks
|
Baumgarten, H. |
|
2004 |
|
17 |
p. 3647-3655 |
artikel |
148 |
Requirements modelling and formal analysis using graph operations
|
Kamsu-Foguem, B. |
|
2006 |
|
17 |
p. 3451-3470 |
artikel |
149 |
Safety stock placement problem in capacitated supply chains
|
Sitompul, Carles |
|
2008 |
|
17 |
p. 4709-4727 |
artikel |
150 |
Satisfying due-dates in a job shop with sequence-dependent family set-ups
|
Taner, Mehmet R. |
|
2003 |
|
17 |
p. 4153-4169 |
artikel |
151 |
Scheduling production tasks in a two-stage FMS
|
Błazewicz, J. |
|
2002 |
|
17 |
p. 4341-4352 |
artikel |
152 |
Selection of a reverse logistics project for end-of-life computers: ANP and goal programing approach
|
Ravi, V. |
|
2008 |
|
17 |
p. 4849-4870 |
artikel |
153 |
Semi-heterarchical production planning structures in the support of team-based manufacturing
|
Rahimifard, S. |
|
2004 |
|
17 |
p. 3369-3382 |
artikel |
154 |
Sequencing a hybrid two-stage flowshop with dedicated machines
|
Riane, Fouad |
|
2002 |
|
17 |
p. 4353-4380 |
artikel |
155 |
Sequencing algorithms for multiple arc-welding robots considering thermal distortion
|
Park, S. -H. |
|
2008 |
|
17 |
p. 4751-4767 |
artikel |
156 |
Simulation-based performance analysis and optimization of electronics assembly equipment
|
Grunow, M. |
|
2000 |
|
17 |
p. 4247-4259 |
artikel |
157 |
Some dominance properties for single-machine tardiness problems with sequence-dependent setup
|
Luo, Xiaochuan |
|
2006 |
|
17 |
p. 3367-3378 |
artikel |
158 |
Stability of Johnson's schedule with respect to limited machine availability
|
Braun, O. |
|
2002 |
|
17 |
p. 4381-4400 |
artikel |
159 |
Statistical tolerance synthesis using distribution function zones
|
Zhang, Chuck |
|
1999 |
|
17 |
p. 3995-4006 |
artikel |
160 |
STEP-compliant NC research: the search for intelligent CAD/CAPP/CAM/CNC integration
|
Xu, X. W. |
|
2005 |
|
17 |
p. 3703-3743 |
artikel |
161 |
Study on constraint scheduling algorithm for job shop problems with multiple constraint machines
|
Zuo, Yan |
|
2008 |
|
17 |
p. 4785-4801 |
artikel |
162 |
Support tool for material and process combinations during early design
|
Howard, L. |
|
2006 |
|
17 |
p. 3379-3390 |
artikel |
163 |
Support vector machines for recognizing shifts in correlated and other manufacturing processes
|
Chinnam, Ratna Babu |
|
2002 |
|
17 |
p. 4449-4466 |
artikel |
164 |
Tailored toolkit to enable seamless supply chains
|
Childerhouse, P. |
|
2004 |
|
17 |
p. 3627-3646 |
artikel |
165 |
TestLAN approach and protocols for the integration of distributed assembly and test networks
|
Williams, N. P. |
|
2002 |
|
17 |
p. 4505-4522 |
artikel |
166 |
The design of business processes within manufacturing systems management
|
Wu, B. |
|
2000 |
|
17 |
p. 4097-4111 |
artikel |
167 |
The information gap between design engineering and materials supply systems design
|
Johansson, Eva |
|
2004 |
|
17 |
p. 3787-3801 |
artikel |
168 |
The integration of manufacturing and cost information into the engineering design process
|
Chan, D. S. K. |
|
2000 |
|
17 |
p. 4413-4427 |
artikel |
169 |
Tolerance allocation via simulation embedded sequential quadratic programming
|
Kao, Chiang |
|
2000 |
|
17 |
p. 4345-4355 |
artikel |
170 |
Tool management in flexible manufacturing systems with network part program
|
Matta, A. |
|
2004 |
|
17 |
p. 3707-3730 |
artikel |
171 |
Travel distance estimation and storage zone optimization in a 2-block class-based storage strategy warehouse
|
Le-Duc, T. |
|
2005 |
|
17 |
p. 3561-3581 |
artikel |
172 |
UEML: towards a unified enterprise modelling language
|
Vernadat, F. |
|
2002 |
|
17 |
p. 4309-4321 |
artikel |
173 |
UL-PML: constraint-enabled distributed product data model
|
Wang, Y. |
|
2004 |
|
17 |
p. 3743-3763 |
artikel |
174 |
Unified structural-procedural approach for designing integrated manufacturing systems
|
Macedo, J. |
|
2004 |
|
17 |
p. 3565-3588 |
artikel |
175 |
U-OPT: an analysis of exact U-shaped line balancing procedures
|
Aase, G. R. |
|
2003 |
|
17 |
p. 4185-4210 |
artikel |
176 |
Use of genetic algorithms to solve production and operations management problems: a review
|
Aytug, H. |
|
2003 |
|
17 |
p. 3955-4009 |
artikel |
177 |
Using Functional Virtual Population as assistance to learn scheduling knowledge in dynamic manufacturing environments
|
Li, Der-Chang |
|
2003 |
|
17 |
p. 4011-4024 |
artikel |
178 |
Utilization of neural networks for the recognition of variance shifts in correlated manufacturing process parameters
|
Cook, D. F. |
|
2001 |
|
17 |
p. 3881-3887 |
artikel |
179 |
Variant-based cost estimation based on Information Management
|
Brinke, E. Ten |
|
2000 |
|
17 |
p. 4467-4479 |
artikel |
180 |
Virtual enterprise brokerage: a structure-driven strategy to achieve build to order supply chains
|
Molina, A. |
|
2007 |
|
17 |
p. 3853-3880 |
artikel |
181 |
Virtual facility layout design: the value of an interactive three-dimensional representation
|
Smith, Robert P. |
|
1999 |
|
17 |
p. 3941-3957 |
artikel |
182 |
Virtual reality-based approach to manufacturing process planning
|
Okulicz, K. |
|
2004 |
|
17 |
p. 3493-3504 |
artikel |
183 |
Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
|
Shafaei, R. |
|
1999 |
|
17 |
p. 3913-3925 |
artikel |